Post Job Free
Sign in

Project Manager

Location:
7410
Posted:
April 26, 2010

Contact this candidate

Resume:

Objective To secure a position as a civil engineer with a successful

engineering firm, where my design skills, solid educational

background and 20 years of experience in the site/civil

engineering field can be applied towards career growth.

Professional Registrations and Certifications

Professional Engineer, New Jersey, #46718, 2007

NCEES Record Program, #39063, 2009

Certified Municipal Engineer, currently enrolled in 2010 NJSME CME Program

Education New Jersey Institute of Technology

Bachelor of Science in Civil Engineering, January 2001

Bergen County Community College

Associate of Science, June 1996

Work History Pennoni Associates Inc., Cedar Knolls, New Jersey from

2007-2010

Senior Engineer: (Sept. 2007 - Mar. 2010)

Responsibilities included managing multiple projects for

commercial, residential, and municipal clients. Duties

included preparing scope of services and working budgets

for potential projects, managed budgets and personnel to

ensure projects were on schedule and on budget,

communicated with clients and in-house professionals on

project related issues, followed up on permit progress

with various government agencies and reviewers, mentoring

junior personnel. Responsible for overseeing site plan

production and reviewing for completeness.

Macdel Engineering, P.C., Clifton, New Jersey from

1989-2007

Project Manager (2001-2007):

As a project manager responsibilities included

preparation of scope of services for potential projects

and developed working budget, management of project time

and budget, overseeing a project team of 3 persons,

preparation of calculations, reports and development site

plans and project schemes. Prepared permit applications

and supporting documentation. Resolved site issues with

various government agencies and reviewers. Maintained and

developed client relationships.

Project Engineer (1998-2001):

As a project engineer responsibilities included

preparation of calculations, for drainage analysis and

capacity, sanitary sewers, and retaining walls. Design of

parking layouts, grading of site, utilities layout,

drainage systems, sanitary sewers, retaining walls, site

lighting, construction details when required.

CADD Manager (1996-1998)

Developed CADD Standards and streamlined existing CADD

Policies. Trained new employees on Company CAD Policies

and software.

Survey Instrument Man (1992-1996)

Part of a two field crew and performed duties of

instrument man and rod man. Collected land survey data in

the field using theodolites, levels and data collectors.

Performed construction stakeout and checks. Prepared

based mapping.

CADD Draftsperson (1989-1992)

Prepared site plans and surveys using CADD Software.

Skills

Language English; Spanish

Computer Autodesk Autocad, Autodesk Land Desktop, Bentley

Skills Microstation, Bentley PondPack, USACOE HEC-RAS, Hydraflow

Hydrographs, Hydraflow Storm Sewers, Microsoft Word,

Microsoft Excel, Microsoft Access.

Representati Redevelopment of Lincoln Place, Madison, New Jersey 2010

ve Project Prepared design and construction documents for a

Experience streetscape, road improvement and utility infrastructure

upgrade project for the Borough of Madison. The project

involved the implementation of Madison's downtown

streetscape standards, redesign of the roadway cart way

as a traffic calming feature and implementation of

patterned pavement in front of the Madison Train station

to provide a pedestrian friendly environment. The design

involved development of design alternatives with cost

estimates, exhibits for borough council review and

budgeting, Road construction plans, technical

specifications and final cost estimate.

Green Village Road Reconstruction, Madison, New Jersey 2010

Prepared design and construction documents for the

reconstruction of Green Village Road in the Borough of

Madison. The project included topographic survey of

3,600 linear feet of roadway, development of design

alternatives and cost estimates for the Boroughs review,

development of water main construction plans and quantity

estimate.

Newark Airport Terminal B Generator, Newark, New Jersey 2009

Prepared Maintenance of Traffic and Pavement Striping

plans for airport parking and driveway modifications in

connection with a new generator room. The project

required preparation of phasing plans, haul and delivery

route plans, cost estimates, close coordination with

other trades and Port Authority personnel.

Bubbling Springs Upper Pond Dam EAP, West Milford, New 2009

Jersey

Prepared an Emergency Action Plan for an existing dam in

the town of West Milford. The Project required close

coordination with township officials, the NJDEP Dam

Safety Section engineering staff, and County Office of

Emergency Management officials.

U.S. Land Port of Entry, Richford, Vermont 2009

Prepared Grading and Drainage plans for the construction

of a new Land Port of Entry for the General Services

Administration. The project required design of a

realignment of roadway along Pinnacle Road near the

border between the United States and Canada. The project

required earthwork calculations, storm water management,

Storm Water Pollution Prevention Plan, Retaining Wall

Design.

Habernickle Park Dam, Village of Ridgewood, New Jersey 2009

Prepared design and construction documents for the

rehabilitation of an existing earth dam. The project

required preparation of documents to secure permits from

the New Jersey DEP's Dam Safety Section as well as Flood

Hazard and Freshwater Wetlands from the Division of Land

Use Regulation. The project involved the reconstruction

of the main spillway, upstream and downstream slopes,

slope protection measures, design of a stilling basin,

and dredging of the pond.

JP Morgan Chase Bank, Town of Orange, Connecticut 2009

Prepared design and construction documents for a 4,500

s.f. bank branch building. The site plans included design

of underground storage system, parking facilities and

utility connections to serve the proposed building. The

project required executing project milestones on time to

ensure timely opening of bank. The project was built

ahead of schedule.

Mercer Mutual Meter Replacement, Borough of Pennington, 2009

New Jersey

Prepared meter replacement construction documents for an

existing office building. Meter replacement required due

to changes by the water purveyor for meters to meet new

AWWA minimum standards. The project involved field

measurement of existing meter facility, preparation of

construction documents, coordination with Pennington

Borough Engineer, Water Company and Owner on selection of

the new water meter.

Representati Montes Subdivision, Township of Weehawken, New Jersey 2009

ve Project Prepared site and subdivision plans for a five dwelling

Experience residential development located on steep slopes

overlooking the Hudson River and New York City. The site

plans included design storm collection systems designed

to retain the 100 year storm as required by the governing

authority to reduce the impact to existing combined sewer

system. The project also involved steep slope analysis,

preparation of a sight line cross sections to evaluate

New York City views from adjacent properties, retaining

wall design, design of an on-site lift station for

sanitary sewer flows, and expert testimony at Zoning

Board Meetings.

Provost Square, City of Jersey City, New Jersey 2008

Prepared site plans for a mixed use

commercial/residential development project in the city of

Jersey City. The project consisted of three high rise

residential towers with podium levels and an affordable

housing building structure. The project involved

preparation of preliminary site plans for approval by the

city planning board, design of a underground storm water

collection system, design of utility connections and

coordination with local utility and city agencies, sewer

analysis and CCTV monitoring of the existing sewer mains,

earthwork analysis, meetings with local city agencies,

expert testimony at planning board.

North Street Pump Station, Borough of Madison, New Jersey 2008

Managed the evaluation of the existing conditions and

preparation of pump station upgrade plans for the North

Street Pump Station. The pump station had experienced

overflows during extreme rainfall events. The project

involved a survey of the existing facility inclusive of

the interior building and surrounding land up to the

property bounds, and an evaluation of the existing pump

station and its operating conditions along with

recommendations of possible upgrades and improvement and

preparation of construction documents.

Green Avenue Reconstruction, Borough of Madison, New 2008

Jersey

Prepared road reconstruction plans for 3200 linear feet

of roadway on Green Avenue. The project included

improvements to 1800 linear feet of 8" water main,

installation of a storm water treatment unit, drainage

improvements, bike lanes, and a painted median for

traffic calming. The project required close coordination

with the borough engineer to assist the borough with

preparing technical specifications, as well as cost and

quantity estimates.

Citibank, JFK International Airport, Queens, New York 2008

Prepared design and construction documents for the

renovation of an existing Citibank facility situated in

JFK International Airport and provided construction

administration services. The project included

improvements to the parking area and reduction of

impervious areas, design of a new bus stop, new ATM

facility, landscape and lighting upgrades. Project

required close coordination with the Project Architect

and Port Authority of New York and New Jersey Personnel.

DCH BMW Showroom, Greenwich, Connecticut 2008

Developed site plans for a new 8,000 square foot auto

dealership facility on a 0.75 acre site located in the

general business district of the town of Greenwich,

Connecticut. The project included development of various

conceptual schemes, site plans, design of a storm water

management system, rock depth investigation, geotechnical

investigation and report, utility layout and permitting.

DCH Toyota Improvements, Mamaroneck, New York 2008

Prepared design and construction documents for the

renovation of an existing 10,000 square foot DCH Toyota

Showroom and the relocation of the service operation to a

new 33,000 square foot facility in an industrial section

of town. The project included preparation of SWPPP

documents for NYDEC review and filing a notice of intent.

Representati Kaveny and Mountainside Park Improvements, Montclair, New 2007

ve Project Jersey

Experience Construction administration for the renovation of Kaveny

Field and Mountainside Park in the township of Montclair,

New Jersey. Improvements to the parks included

reconstruction of Little League Field of Kaveny Field and

the construction of basketball courts, playground area

and rehabilitation of Little League Field at Mountainside

Park. Responsibilities also included Green Acres Grant

administration for both fields.

Park Improvement Project, City of Passaic, New Jersey 2007

Construction administration for the renovation of four

parks throughout the City of Passaic. Improvements to

the parks include rehabilitation of softball and baseball

fields at Third Ward Park, reconstruction of basketball

courts at Benson Avenue Park, rehabilitation of

basketball court and playground area at Schevchenko Park

and reconstruction of basketball courts at Colonel

Johnson Park. Responsibilities also included Assisting

the City with Green Acres Grant administration.

2 Story Office Building, Ridgefield, New Jersey 2007

Prepared civil/site plans for the construction of a 2

story, 8,000 S.F. office building on a 0.33 acre site.

Project included preparation of site plans, storm water

analysis, permitting.

7,400 S.F. Retail Building, Parsippany, New Jersey 2006

This project consisted of preparation of site plans and

subdivision plans for a 7,400 sf retail building on a 5

acre site. Project included topographic survey,

subdivision plans, site plans, wetland transition area

compensation plans, flood plain fill calculations, flood

hazard area permit, culvert design, and expert testimony.

4 Story, Candlewood Suites Hotel, Secaucus, New Jersey 2005

Prepared site plans for the construction of an 81 unit

Candlewood Suites Hotel on a 3 acre site. The project

included, preparation of topographic survey, subdivision

plans, site plans, design of detention pond, utility

layout, and permitting.

Union City Middle School, Athletic Field, Union City, New 2005

Jersey

Prepared site plans for the construction of a synthetic

turf all purpose athletic field for the Jose Marti Middle

School. Project included preparation of site plans,

drainage calculations, under-turf drainage system,

detailed grading plans, retaining wall design, and

detailed utility layout plans.

10 Story Residential Building, Union City, New Jersey 2005

Prepared site plans for a 10 story residential tower

located on a 0.4 acre site. The project included

topographic survey, preparation of site plans, design of

a storm water management system under the building, and

permitting.

4 Story Residential Building, Glenn Ridge, New Jersey 2004

This project involved the rehabilitation of the existing

telephone company building and extending and converting

the existing structure into a 73 unit residential

building. The project included preparation of topographic

survey, site plans, design of an underground detention

system under building, design of a dry well system, and

permitting.

PBI Hospital Cancer Center Addition, Passaic, New Jersey 2004

Prepared site plans for the addition of the cancer center

wing to Passaic Beth Israel Hospital (aka Passaic General

Hospital). The project included preparation of site

plans, design of a storm collection system including a

dry-well, redesign of the main entrance driveway and drop

off area, redesign and realignment of an existing parking

lot.

Representati Union City Early Childhood Center, Union City, New Jersey 2003

ve Project

Experience This project for the Schools Construction Corporation

consisted of topographic survey and comprehensive site

plans for an 18,000 s.f. school on a 0.80 acre site.

Project included surveying, site planning, design of

transformer vault access pit, storm water management and

detention system, specifications, and permitting.

33 Unit Townhouse Development, Secaucus, New Jersey 2003

Civil/site plans for a 33 unit townhouse development on a

3.5 acre flag lot. The project involved mapping of

wetlands, preparation of roadway plans, site plans,

design of an oversized pipe detention system, sanitary

sewer design, waterfront walkway plans, proposed easement

plans. Permits included, waterfront development permit,

stream encroachment permit, treatment works approval

permit, soil erosion and sediment control permit.

Juan Pablo Duarte Park, Union City, New Jersey 2003

Prepared site plans for the rehabilitation of an existing

park. Prepared site plans for new park including plans

for a safety surface play area, and water park. Project

involved realignment of utilities, detailed grading

plans, details of safety surface areas, and design of

water recirculation system for water park.

St. Mary Hospital, ED and MOB Addition, Hoboken, New 2002

Jersey

Civil/site plans for the addition of the new emergency

department entrance and the medical office building

addition. Project included preparation of site plans,

landscape plans, lighting plans, oxygen tank enclosure

plans, and permitting.

Wal-Mart/Sam's Club Retail Center, Secaucus, New Jersey 2002

Prepared site plans for the construction of two130,000

s.f. retail buildings for Wal-Mart and Sam's Club, on a

34 acre site. Project Included Surveying, site planning,

storm water management and permitting.

4-Story Residential Development, Jersey City, New Jersey 2001

Civil/Site plans for a 71-unit residential development.

Project included surveying and mapping of existing

utilities, site planning, storm water management, and

permitting.



Contact this candidate