JERRY P. COLBAUGH
** ******* ****, ********, **** 44406
330-***-**** - home 724-***-**** - cell
abmsz0@r.postjobfree.com
OBJECTIVE
To contribute my 27 years of vast experience in the Manufacturing-Stamping
& Assembly, Process and Facility Total Equipment Maintenance, Tool & Die,
Project Engineering / Re-Engineering & Quality Process, industry in seeking
a position with your company, to assist your organization in increased
profits and productivity.
WORK EXPERIENCE OVERVIEW
GENERAL MOTORS CORPORATION
Business Unit Manager - Maintenance
Leading the Maintenance Department with as many as 7 Technical Supervisors
and over 80 union skilled trades employees across a three shift operation.
Provided total maintenance support on all facility equipment, power house
boiler, compressor, crane and process / production equipment. This included
establishing, designing, implementing, and training, the scheduled
maintenance program, throughout the work force. Implemented and guided the
predictive maintenance program on production and facility equipment.
Maintained the inventory for the spare / service parts needed for the
repairing of the equipment in the facility.
Business Unit Manager - Tool & Die
Leading the Technical Support Department with as many as 6 Technical
Supervisors and over 150 skilled trades employees across a three shift
operation. Provided all die-based tool room support including tool and
fixture design & build operations, machining operations, die cutting and
die welding operations and managing the Preventive Maintenance and Tool
Repair Process. Also manage the line-side technical support for the high
speed progressive presses, blanking presses, small presses, laser cutting
systems, automated conventional press systems, metal assembly hand gun
operations, and automated metal assembly processes in a manufacturing
operations.
Business Unit Manager - Lean Manufacturing Lead
Leading a joint implementation team, institutionalizing, "GMS" (Lean
Manufacturing Concepts) throughout the work force. This system includes
the aspects of: people involvement (WPO, BPD), standardization
(Standardized Work), built-in quality (ISO 9001, QS 9000, Six Sigma), short
lead-time (5S ), and continuous improvement. (SPC, Problem Solving). This
process, provided the tools for the work force, to track, correct and
continuously improve all processes in the facility, form top management to
the team level.
PROFESSIONAL EMPLOYMENT DETAILS
06/09-Current FORD MOTOR METAL FABRICATING - Walton Hills, OH.
04/09-Current Tool & Die Engineer
Worked on multiple shifts to provide first responder service to the
production organization, and supported the production team environment
with technical problem solving capability. Supervised approximately 30
skilled trades employees in direct support of production machinery and
tools.
. Implemented cross training program to improve skilled trades
employee flexibility
. Designed, developed and maintained process control documentation
that standardized production line set-ups in a batch production
environment
. Performed quarterly Team Leader Skilled Employee evaluations to
monitor adherence to the business plan
. Established departmental goals, supporting current business needs
. Responsible for adhering to budgetary guidelines, handling all
safety issues, and awareness of national and local union contracts
. Purchase and control inventory for tools, parts and material for
the department
. Formulate/revise/implement Policies & Procedures
. Establish, maintain and allocate manpower for the scheduled
maintenance, and repair process
04/06-4/09 GENERAL MOTORS METAL FABRICATING - Lordstown, OH
06/08-4/09 Maintenance Manager - Maintenance Planner
. As MAXIMO Project Manager
. Instituted Maintenance Database System MAXIMO for all Process
& Facility Equipment
. Incorporate and adhere to OSHA, ANSI requirements on all
Equipment
. Developed training modules for all levels of the organization.
. Purchase/install/maintain hardware-software systems, established
network security
. As Quality Network Planned Maintenance "QNPM" Representative
. Guide/Leadership for Cross functional Teams (salary and hourly)
in the development and implementation of the Maintenance Program
(Proactive, Predictive and Planned)
. Prepare and facilitate the annual QNPM Audit, scoring the plant
level, of having the Maintenance System Institutionalized on all
process & facility equipment
. Functioned as liaison between Plant and Divisional
representatives and Maintenance / Vendor Coordination. Capture
lessons learned to improve future activities.
. Coordinated Run Time Maintenance, scheduled preventive
maintenance and repairs, to eliminate equipment failures
. Track PM compliance to goals, report to plant staff and set Gap
Closures when the goals are not achieved
. Health & Safety audit champion for the PM Module. Incorporate
and adhere to OSHA, requirements on all Equipment
. As Predictive Maintenance Supervisor
. Develop/Implement the Predictive team; establish all team
training, and activities.
. Development of the equipment testing requirements, methods
and frequency.
. Technology Training and Equipment
. Maintaining Calibration and Service on all Equipment
. Cost avoidance Tracking / Saving of the Predictive activity
. As Apprentice Coordinator
. Guide/track Program & screen applicant for a hiring pool
for future programs
Jerry P. Colbaugh
Page 1.
01/07-06/08 GMS Manager (GM Lean Manufacturing System)
. Incorporated GMS manufacturing processes into current system which
ultimately will save time/money for company. (Continuous
Improvement Champion / Lessons learned)
. The "GMS" System includes the aspects of: people involvement (WPO,
BPD), standardization (Standardized Work), built-in quality (ISO
9001, QS 9000, Six Sigma), short lead-time (5S ), and continuous
improvement. (SPC, Problem Solving),
. Responsible for creation/implementation of training program plant
wide
. Purchase needed materials; work with vendors to secure best pricing
. Formulate/revise/implement Policies Procedures and
coordinate/support IT Needs.
. Conduct weekly GMS staff meetings to discuss project progress and
planning
. Formulate/revise/implement Policies & Procedures (QS9000 & ISO)
. Develop/Monitor data documentation for production processes.
04/06-01/07 Tool & Die Manager
. Oversaw all departmental operations
. Managed six supervisors & 150 UAW skilled employees, over a 3 shift
operation
. Conducted Supervisor quarterly performance reviews and developed
each supervisor on their weaknesses to their individual performance
plan and expectations, related to the company's Business Plan /
Ethics.
. Performed quarterly Team Leader Skilled Employee evaluations to
monitor adherence to the business plan
. Established departmental goals for the Union Contract Negotiations
. Responsible for adhering to budgetary guidelines, handling all
safety issues, and awareness of national and local union contracts
. Responsible for creation/implementation of training program plant
wide
. Purchase material, from vendors secure best pricing,
customer/supplier relationship
. Formulate/revise/implement Policies & Procedures
11/83-4/06 GENERAL MOTORS METAL FABRICATING - West Mifflin, PA
09/05-4/06 Process Control Coordinator Quality
. Develop/Monitor the data documentation for production processes.
. Responsible for creation/implementation of training program plant
wide
. Purchase needed materials; work with vendors to secure best pricing
. Formulate/revise/implement Policies & Procedures (QS9001 & ISO)
. Conduct weekly staff meetings to discuss project progress and
planning
. Coordinate/support IT needs
. Professional Managers Network Secretary
08/04-09/05 Maintenance General Supervisor
. Managed five supervisors (oversaw 100+ skilled tradesmen) over
three shifts, according to manufacturing/project needs
. Conducted Supervisor performance reviews and developed each
supervisor on their weaknesses to their individual performance plan
and expectations.
. Maintained all Process and Facility Equipment. Preventive,
Predictive and Repairs.
. Responsible for purchasing, budgeting, and review of business plan
. Performed quarterly employee evaluations to monitor adherence to
master business plan
. Worked with Maintenance Department to assure plant safety
. Coordinated annual certification/repairs/record retention/training
on communication devices (press tonnage monitors and load cells,
plant lifting devices and scales, air vessels and fall hazard
equipment)
05/01-08/04 Maintenance Planner (same responsibilities as current position)
. As MAXIMO Project Manager (same as above)
. Instituted Maintenance Database System and developed
training modules
. Purchased/installed/maintained hardware/software, and
established network security
. Report Writing in SQL / Crystal Enterprise
. As Quality Network Planned Maintenance Representative (same as
above)
. Functioned as liaison between Plant and Divisional
representatives
. Coordinated Run Time Maintenance, scheduled preventive
maintenance and repairs, and tracked compliance to goals to
eliminate equipment failures
Jerry P. Colbaugh
Page 2.
01/01-05/01 Tool & Die General Supervisor (same responsibilities as Tool &
Die Manager)
. Oversaw all departmental operations
. Managed four supervisors & 80 UAW skilled employees, over a 3 shift
operation
. Responsible for adhering to budgetary guidelines, handling all
safety issues, and awareness of national and local union contracts
07/99-01/01 Tool & Die Supervisor
. Managed skilled (union) employees and scheduled work
02/95-07/99 Floor Support Engineer
. Analyzed/corrected production throughput and line transition issues
. Coordinated all incoming new products, maintenance and repairs to
equipment, dies and tooling.
. Developed standardized end of arm tooling solution to minimize
operating and re-tooling costs
. Developed and implemented standardized in-press idle stations to
reduce changeover times and increase process flexibility.
11/83-06/95 Tool & Die Maker/Die Troubleshooter/Automation Programmer/Panel
Checker
06/78-11/83 PITT TOOL & DIE COMPANY - Monroeville, PA
Tool, Die and Mold Maker
. Experience in plastic molds, jig and fixture buildings
. Built injection mold tooling with high precision tolerances
0.001") to support Rockwell, Westinghouse and other industrial
clients.
EDUCATION
GENERAL MOTORS CORPORATION
Journeyman Tool & Die Maker
COMMONWEALTH OF PENNSYLVANIA
Journeyman Tool & Die Maker
Training and knowledge of Fanuc robotics, ABB robotics, ISI automation
CONTINUING EDUCATION
ILM Refresher Training (English) - Online class 09/05
English-Microsoft Project 2000 Fundamentals - Online class 06/05
Continuing Education Business Management Classes - Carlow University 09/98
SEMINARS/WORKSHOPS
Attended various seminars and workshops on topics such as: Safety and
Hazardous Awareness; Problem solving; New Products; Management; and Labor
Relations
AWARDS/HONORS
Professional Managers Network
Supervisor of the Month and Supervisor of the Year - 2000
Perfect Attendance for five consecutive years
COMPUTER FAMILIARITY
Microsoft Office, Visio, Oracle, AutoCAD and IT responsibilities
VOLUNTEER/COMMUNITY INVOLVEMENT
United Way / Make-A-Wish / Annual church bazaar
Soccer Coach for local youth organization - 6/09
AWIM - A World In Motion (Middle School Engineering Project) 09/08
Assistant soccer coach for the local youth organization - 2008
Judge at the Annual Mon Yough Chamber of Commerce Science Fair
McKeesport High School - 3/05
Girls' basketball coach for the local youth organization - 1995-1999
Jerry P. Colbaugh
Page 3.