Stephen A. Simpson
*** ********** ******, ***** #*
Dover, New Hampshire 03820 U.S.A.
603-***-**** (Cell)
************@*****.*** (email)
Objective: Seeking a challenging position as a Senior Master Scheduler,
Production Planner or Buyer-Planner, in a fast paced manufacturing
environment, where my acquired skills and experience will be best utilized
and advancement is possible.
PROFESSIONAL SUMMARY
. 29 years of Manufacturing experience.
. 24 years of MRP experience.
. 9 years of SAP R3 / ERP (Systems, Applications & Products in Enterprise
Resource Planning) MRP experience.
. 19 years of lean Scheduling\Planning experience.
. 12 years of JIT and Kanban experience.
. APICS Training and Certification in Materials and Capacity Planning,
Inventory Management.
. 15 years Statistical Process Control (SPC) experience.
. 20 years Management experiences.
. 20 years Microsoft Office experiences.
. 1+ Years Unicam / 7 years PCBA Planning experience.
. People Soft Experience. Access Mfg. Database experience. PowerPoint
experience. M2M experience.
PROFESSIONAL EXPERIENCE
Schneider Automation, Square D Company. April, 2000 to July,
2009
Division of Schneider Electric, Inc.
One High Street
North Andover, Massachusetts 01845 U.S.A.
Senior Master Scheduler-Production Planner/Senior Buyer-Planner Spec.
(April, 2000 to July, 2009:
. Primary Master Scheduler-Production Planner for Worldwide Sales in
manufactured goods from North Andover facility in Sales Operational
Production Plan for ERP/MRP. (SAP/SOP).
. $84 Million Plan Forecast responsibility (52% of sales) with a 98.6%
O.T.D. Previous O.T.D was less than 89%. Developed and managed strategy
of the SOP Plan. Overhauled stocking levels. Created and generated
production releases for manufacturing, based on daily backlog demand.
Evaluate and create Production Plan on a daily basis.
. Performance Evaluations for 9 years were "Exceeds Expectations" category.
. Partnered interaction with Commodity Buyers to expedite component
shortage deliveries to support the Master Schedule and maintain O.T.D.
performance goal.
. Partnered with Order Administration to support the customer in their
requirements.
. Partnered with Sales, Marketing and Engineering, to develop a ramp
up\ramp down of products and implement ECO requests.
. Perpetual maintenance of Master Schedule to line up with current economic
conditions.
. Managed Purchase Orders for Sub-Contract Mfg. and International Inter-
Company Shipments.
. Corporate Delayed Delivery Analysis / On Time Delivery reports
generation.
. PCBA (Printed Circuit Board Assembly) Production Planner and subcontract
Buyer.
. Working knowledge of Unicam Engineering Software and Access Manufacturing
Database Software.
. Leadership Development & Business Focus Training / Team Building
(Schneider Automation).
. Laid off in July of 2009, as part of the Reduction in Work Force, due to
poor economy.
Foss Manufacturing Company, LLC. May, 1980 to
March, 2000
11 Merrill Industrial Drive
Hampton, New Hampshire 03843-5000 U.S.A.
Manager, Conversion Operations (April, 1993 to March, 2000):
. Directed Equipment Allocation/Manpower to insure wide range of
production/quality requirements for a 24 hour/7 day a week basis.
Excellent production output with high quality level. Performance
evaluations were "Exceeds Expectations" category.
. Managed MRP for Master Scheduling/Production Planning.
. Production Planner for Conversion Dept., as well as consultant within
Business Unit.
. Maintained Kanban / J.I.T. production.
. Managed Inventory Control of Department. High level of Inventory turns
and FIFO.
. Provided Costing Data of product mix. Evaluation of production process
for lower costs.
. Interaction with internal / external Engineering for product design /
revisions in QS9001 format.
. Develop/Maintain QS9001 instructions. Design/Develop/Maintain SOCondition-
SOProcedure system.
. Managed Personnel issues. Managed cross training within the department.
. Laid off in March of 2000, as part of the Reduction in Work Force.
Plant Coordinator (February, 1990 to April, 1993):
. Directed entire Manufacturing Facility Equipment/Manpower for most
effective and efficient Plant Production for 180 million Company sales
revenue per year, on a 12 hour shift basis (24 hour production).
Performance evaluations were "Exceeds Expectations" category.
. Evaluation/Manipulation of entire Facility Production Schedules to insure
availability of raw materials/timely production.
. Managed Personnel issues. Directed entire staff of Manufacturing
Supervisors on a shift basis (24 hour production).
Manufacturing Supervisor (May, 1980 to February, 1990):
. Managed entire production staff and equipment on a shift basis (24
hour production).
EDUCATION
East Coast Aeronautical Technical
Lexington and Bedford, Massachusetts, U.S.A.
(Former partnership of Wentworth Institute of Technology; Boston,
Massachusetts, and now part of Corinthian College)
. Aeronautical Technology Degree (3.78 Grade Point Average). Ranked 2nd in
class.
. Federal Aviation Administration (FAA) Airframe / Power Plant
Certification.
New Hampshire Technical College
Stratham, New Hampshire and the Foss University Campus, Hampton, New
Hampshire U.S.A
. Enrolled 1994 through 1999.
. APICS Material & Capacity Requirements Planning Certification (4.0 GPA).
. APICS Inventory Management Certification (4.0 GPA).
. Operations Management in Manufacturing Certification (4.0 GPA).
. Technical Documents Writing Certification (4.0 GPA).
. Advanced Microsoft Excel/Word Software Certification (4.0 GPA).
. Customer Service Certification.
. Team Building / Business Unit Training (Foss Manufacturing Company, LLC).
PERSONAL
Former Professional Baseball Player in the Netherlands (Holland). Other
interests: Spending time with Family, Sports, Travel, Ocean, Music,
Reading, Fitness, Antique/Classic Autos, Ongoing Restoration of my Nissan Z
car.