summary of qualifications
* */* ***** ** EXPERIENCE IN ELECTRICAL POWER SYSTEM
DESIGN/CONSTRUCTION
EDUCATION
TEMPLE UNIVERSITY 2008
Bachelor of Science, Electrical Engineering
Cum Laude
CERTIFICATIONS
AFFILIATIONS
Member, Institute of Electrical and Electronics
Engineers, Inc.
Member, U.S. Green Building Council
EMPLOYMENT History
FX BONNES ASSOCIATES, INC; CONSULTING/DESIGN ENGINEERS;
June 2008-Present
Design commercial, industrial, and utility electrical
distribution systems
Perform Short circuit, Protective Device Coordination
and Arc Flash studies using SKM Power Systems Analysis
Designs include office buildings, healthcare
facilities, data centers, municipal buildings,
pharmaceutical, medium voltage, and solar systems
Duties include project engineer, assistant project
engineer, and designer on various electrical
construction projects
FX Bonnes Associates, Inc: Consulting/Design Engineers
May 2007-June 2008
Designed commercial, industrial, and utility electrical
distribution systems during summer internship.
Continued internship during senior year of college
working two days a week.
Performed Short circuit, Protective Device Coordination
and Arc Flash studies using SKM Power Systems Analysis
Tri-Tech Systems, Inc: Electrical Contractors
June 2006-September 2006
Compiled pricing bids for electrical construction
projects during summer internship.
Duties included reviewing electrical design drawings,
submitting quotes for electrical equipment, and
estimating man hours for electrical installations.
Obtained city permits for various electrical
construction projects.
computer skills
. AutoCAD
. SKM Power Systems Analysis
. AmpCalc version 4.0
. LightPro
. Microsoft Office Suite
*References and additional project experience available upon request
PROJECT EXPERIENCE
DATA CENTERS/OFFICE SPACE
Echostar, Orange, NJ
Project Engineer for data center/satellite site. This project included:
. Two 750kW/1000kVA diesel generators, N+N
. Two 300kVA UPS systems, N+N
. 1,200 SF of raised floor space
. Coordination, short-circuit, and arc flash study
AEGON Data Center/Office Building, Uwchlan Township, PA
Project Engineer for data center/lab space and office. This project
included:
. 600kW/750kVA diesel generator
. Two 120kVA UPS systems
. 2,000 SF of raised floor space
. 90,000 SF Class A office space
GOVERNMENT
General Services Administration (GSA)
Assisted GSA with the development of a Scope of Work document put out for
public bid. This document was one of the first issued under the American
Recovery and Reinvestment Act (ARRA). The document included writing the
electrical portion and assisting the structural portion. The document
included:
. 850kW Utility Interactive Rooftop Photovoltaic System
. 250kW Utility Interactive Covered Walkway Photovoltaic System
. Inverters and ancillary equipment specification
HEALTH CARE
Harrison Senior Living, Georgetown, DE
Project Engineer for the addition of 16,000 SF of new healthcare wings.
This project included:
. 4,880 SF special care unit space
. 1,720 SF bed wing
. 9,440 SF bed physical therapy wing
. Electrical distribution upgrades
. 200kW/250kVA diesel generator
MEDIUM VOLTAGE
Glen Mills Schools, Glen Mills, PA
Project Engineer for 5kV distribution upgrades. This project included:
. Ten 225kVA pad-mounted transformers
. Two pad-mounted PME switches
Glen Mills Schools, Glen Mills, PA
Project Engineer for installation of campus generator and distribution
upgrades for this 850-acre campus. This project included:
. 35kV electric service
. 3000kVA pad-mounted transformer
. 5kV closed transition automatic transfer system
. 2500kW/3125kVA, 4.16kVdiesel generator
. 11 section, 5kV switchgear lineup
. Upgraded 5kV distribution throughout entire campus - over 30 buildings
total.
. Coordination, short-circuit, and arc flash study for entire campus
Council of Devon, Wilmington, DE
Project Engineer for new electrical service for 290,000 SF, 16-story high
rise in center-city Wilmington. This project included:
. Two 15kV electric services
. Main-Main 15kV switchgear lineup with auto-transfer capability
. 1000kVA pad-mounted transformer
. 3000A low-voltage switchgear for building service/distribution
. Coordination, short-circuit, and arc flash study
MUNICIPAL
Darby Township Municipal and Recreational Buildings, Darby, PA
Project Engineer for new 14,650 SF municipal and 11,000 SF recreational
building. This project included:
. Two Stories, 14,650 SF municipal building including Police Station,
District Justice Office, and Council offices.
. 11,000 SF Gymnasium and associated space.
. 150kW/187.5kVA Diesel Generator
. New electrical service
East Lansdowne Police Building, East Landsdowne, PA
Project Engineer for new 1,600 SF police building. This project included:
. New electrical service
. Power, lighting, and communications design
PHARMACEUTICAL
GlaxoSmithKline Biologicals North America, Marietta, PA
Owner's Representative and Site Electrical Engineer for several projects
at
GSK Biological's North American Hub for the filling, packaging, and
warehousing of vaccines.
Main Substation Project included:
. Two incoming 69kV services from PP&L (electric utility)
. Open-bus substation designed for future 138kV operation
. Two 138kV Circuit Breakers
. Two 40MVA, 69-12.47kV Power Transformers with Load-Tap Changers
. Double-ended 12.47kV switchgear lineup (20 sections) with auto-transfer
system
. Site distribution to over 20 buildings
New B31 Substation Project included:
. Main-Generator-Tie-Generator-Main switchgear/unit substation with auto-
transfer system, and closed-transition generator synchronizing,
paralleling, and load control system
. 1000kW diesel generator
. 480V distribution to all critical site utility systems (steam, clean
steam, water-for-injection (WFI), etc)
Existing PCC2 Substation Retrofit Project included:
. Retrofit of existing Main-Tie-Main switchgear/unit substation
. Main-Generator-Tie-Generator-Main switchgear/unit substation with auto-
transfer system, and closed-transition generator synchronizing,
paralleling, and load control system
. 480V distribution in building, including five 2500SF (4 C) cold rooms,
which store the majority of the site's product.
Site Wide Arc Flash, Short Circuit, and Selective Coordination Study:
. A study of the entire site's electrical power system, including the
main substation (69kV-12.47kV) and 12 downstream substations (12.47kV-
480/277V, 12.47kV-208/120V).
Electrical Substation Training:
. Included training GSK maintenance personnel to operate and maintain
their main 69kV-12.47kV substation. Two day training that included a
written standard operating procedure (SOP).
. Training GSK maintenance personnel to operate and maintain two 12.47kV-
480/227V substations. Single day training that included written
standard operating procedures.
WASTEWATER TREATMENT
Concord Township Sewer Authority, Concord, PA
. Work with the township in maintaining 18 wastewater pump stations.
Misc Pump Stations
. Project Engineer for the design and construction of two wastewater pump
stations.