DESAI
215-***-**** abmopc@r.postjobfree.com
. Business Process Analysis (Production, Inventory, SCM)
. "AS IS" & "TO BE" Systems study
. GAP Analysis, ROI Analysis, SWOT Analysis, Cost Benefit Analysis
. JAD Session, Design SOA, CMMI
. Documentation (FRS, SRS, BRD), Case Analysis and diagram, Activity
Diagrams, Sequence Diagrams, Fishbone Diagram, DFD, ERD, Logic Flow
Diagrams, High Level Design Specifications, Test case generation & Impact
Analysis
. Code testing (Unit testing, Module testing & Integration testing and UAT)
. Inventory Management (Bin, Replenishment, VMI, Safety stock and
Procurement)
. Production Planning, Material Requirement Planning (I,II, III)
. Distribution Requirement Planning & Demand Forecasting
. Supply Chain Management (Inbound, Outbound, Logistics, SCOR, 3PL, Network
Design)
. Warehouse Management
. Operations Management
. Product Development & Life Cycle
. Lean Manufacturing & continuous Improvement
. Project Management, Marketing & Sales Promotion
. Strong Mathematical, Analytical, Lateral Thinking Skills
* Understanding of INCOTERMS 2008
Software Packages: MS Project 2000, MS Office, MS Visio, Visual Basic 6.0,
Oracle Forms 6i, Toad 7.6
DBMS: Oracle 10g/9i/8i, MS Access
PROFESSIONAL EXPERIENCE
Cummins, Rocky Mount NC
July 2007 - Present
http://www.cummins.com
Sr. Analyst (VMI)
Cummins Inc., a global power leader, is a corporation of complementary
business units that design, manufacture, distribute and service engines and
related technologies, including fuel systems, controls, air handling,
filtration, emission solutions and electrical power generation systems.
Responsibilities:
* Perform detailed inventory study and production capacity. Analyze safety
stock, lead time, replenishment quantity per order and supplier.
* Prepare the process flow of the TO BE VMI system and to integrate it with
current production system
* Define safety stock for each any every item and set a reorder point in
VMI system.
* Streamline accounts payable and reducing paper work and number of
invoice. Set up a standard once a month invoicing process.
* Inventory replenishment of actually used items, this avoids storage of
unnecessary items.
* Re defines BOM and upgrade in VMI system for accurate backflush and
eliminating raw material wastage.
* Prepare the process flow diagram and sequence diagram for new VMI system
* Reduce third party job order work and increase quality of product
* Keep track of full delivery or partial delivery for orders
Achieved:
* Reduce Inventory from 8M to 1.6M and inventory holding cost by 60%.
* Eliminate stock out and shortage of material.
* On time delivery to customer and Increase demand visibility without
worried about inventory.
* Reduce rejection of raw material by 15%.
Holcim Dundee, MI
Jan 2007 - June
2007
http://www.holcim.com/US
Sr.
Analyst
Holcim is the world's second largest cement manufacturing group. Having
plants and offices more then 20 countries. I was involved in SMPPO (Stock
Model Production Planning Operation) model. The model was define in such a
way that it generates Plant wise, Shift wise, day wise, machine wise,
cement type wise production schedule for next 3 months on a given
particular day based on the plant production capacity, plant storage
capacity, plant dispatch capacity and demand forecasting of cement for the
respective plant.
Responsibilities:
* Bifurcating Yearly demand into Quarterly to Monthly to daily (Plant wise,
Cement type wise, Clinker type wise).
* Further segregate daily demand into Plant wise, machine capacity wise and
storage capacity wise.
* Cement production schedule depends on various parameters like (Type of
cement, Type of clinker, machine capacity/OEE(Original Equipment
Efficiency), kiln capacity, machine combination with kiln, storage
capacity of silos, Off peak and On peak hours, electricity cost and labor
availability)
* Along with Cement production schedule we define clinker production
schedule also to maintain stock level of clinker as clinker production is
a continuous process.
* Keeping various constraints into consideration we generate 5 scenarios to
study the impact on cost and production for cement products.
> What if one of the plant shuts down
> What if cement demand increase by 10%
> What if cement demand decrease by 10%
> What if clinker demand increase by 5%
> What if clinker demand decrease by 5%
* Document and diagram the result of all scenarios to better help the
production team.
* Manage customer's Order through EDI and generate Production schedule.
* Daily understand the forecasted/projected production with actual
production and adjust the difference for to rest of the month,
considering required production should not exceed the plant capacity per
day.
* Also define Dispatch/export schedule for cement type via Sea, rail road,
trucks and airways.
Achieved:
* Reduce Production cost by 27% and saves up-to $15M per year by optimizing
off peak hours time
* SMPPO gives exact production schedule for next 3 months at any given day
for any plant or machine
* Simplify daily production and dispatch schedule.
* Reduce overstocked of cement and clinker inventory
* Equally distributed daily production to all machines reduces late
delivery and overtime cost.
Siam City Cement Company. Thailand
Mar 2006 - Nov 2006
http://www.siamcitycement.com/Default.aspx?lang=en
Business Analyst
SCCC is the leading cement manufacturing company in Asian countries. Having
3 plants, SCCC was able to supply different kind of cement across whole
Asian region. AOP (Asian Operation Planning) was developed to prepare
Dispatch schedule for cement from each plant.
Responsibilities:
. Major role involves in Preparing Dispatch schedule of various cement
types from different plant.
. Analyze and prepare report on Plant production capacity, dispatch
capacity, storage capacity.
. Minimize transportation cost by optimizing SCM.
. Define export (Domestic / international) schedule for Cement based on
following parameter
. Total export demand for the day
. Plant production capacity
. Cement and Clinker storage capacity in their respective silos
. Plant dispatch capacity
. Region wise demand and availability of stock in respective warehouse.
. Priority of order
. Also involved in production schedule of various types of cement based on
daily demand.
. Monitoring production & dispatch schedule to avoid any uncertainty.
Achieved:
. Reduce transportation cost by 30% saves $10M per year.
. On time delivery of goods. (export or domestic)
. Equally distributed stock leads to never stock out situation.
Intellicon. Ahmedabad, India
June 2005 - Feb 2006
http://www.intellicon.in/index.html
IT Analyst
In 1992, the formal establishment of Intellicon was effected through a
concerted decision to give a new identity to the flagship company Essen
Tele-communications. After 1996 company involves in Automatic data capture
industry, Industrial Scanner, Bar code solutions, RFID Hand Held Terminals,
Verity of printers.
Responsibilities:
. Did the AS IS systems study and re-engineered with TO BE system study and
documented.
. Plot all the business process activity on the paper in terms of BRD,FRS
and Process flow diagram
. Primary goal is to Implement SAP Business One to integrate various
department, corporate branches and plant.
. Involved in Day to day business process activity and Implementation of
SAP software with the help of HP (Hewlett-Packard implementation team).
. Analyze key Functional area (Financial, Sales & Distribution, Production,
Inventory, Supply chain) and make HP team better understand our business
process to configure software modules to optimize and eliminates paper
work.
Achieved:
. Running optimized smooth operation with SAP B1 and increase productivity.
. Reduce duplication of paper work and save time and cost
. All the departments from various branch office and plant have same
information at same time.
Symphony Comfort Systems Ltd. Ahmedabad, India
May 2004 - June 2005
http://www.symphonycomfort.com/
IT
Analyst
Launched in 1988, Symphony has established as a world leader in evaporative
air coolers, also well-known in air conditioner and water heater with
sensitivity and too good design. Symphony's global popularity is testament
to his sentiment. Its products are already being sold in USA, Europe,
Middle East, Africa, and South Asia.
Responsibilities:
. Implemented VMI system for faster and accurate supply of goods at various
warehouse and dealers.
. Performed system study and collect data for VMI system
. Gathered information about various product and their sizes, also study
geographical location of warehouse and dealers for optimize
transportation cost and truck booking.
. Negotiate with truck dealer to have truck available for on-time shipment.
. Implement auto invoice to customer and
. Integrate all inventory data to the centralize server for faster result
. Engage in truck routing and network design, booking and order priority.
. Preparing Dispatch schedule to minimize Transportation cost, taking
such parameters like (FTL/ HTL., Priority of Order, Area wise
distribution center, Store pick up)
Achieved:
. Improve customer relationships and gain business profit
. Improve on-time delivery and customer satisfaction level by 92%.
. Increase ATP(Available to Promise) ration from 85% to 98%
Mormugao Port Trust, GOA, India
Oct 2001 - May 2004
http://www.mptgoa.com/
Programmer/Business Analyst
Mormugao Port Trust is basically one of the busiest ports in India which
accommodates 100 Ships Daily. To cater the growing business needs, The Port
Operations Management System comes into picture. This Port Operation
Management system comprises of following Modules - Signal Station -Marine
Department, Traffic Department, Planning and Management System, Cargo
Handling labor department, Chief Mechanical Department-Shipping &
Receiving, Central Documentation Centre -Electronic data interchange,
Estate Management System, and Executive Information System.
Responsibilities:
. I was involved in TO BE system study of port business activity, re design
business process and plotted them on paper.
. Prepare FRS, SRS, DFD's, ERD's and activity flow diagram.
. Also involve in Planning and Scheduling of ships for loading and
unloading or iron ore based on (allocation meeting, weather season,
availability of workers, open and close storage area, and domestic export
order for iron ore).
. Study the past Demand of iron ore and prepare demand forecasting chart
for next 3 months.
. Involved in Database design and coding of various modules.
MBA (Marketing/ SCM), B.S. (Production Engineering), Diploma in Advance
Computing (C-DAC)