PROFILE OF QUALIFICATIONS
. Intensive knowledge in implementing Lean Manufacturing and Six sigma
techniques.
. Outstanding knowledge in MRP, SOP, manufacturing procedures and using SPC
tools in data analysis
. Provable Knowledge on fundamentals of supply chain management,
strategies, building competitive infrastructure and maintaining CRM and
SRM effectively
. Excellent documentation, Strong written, communication and organizational
skills
. Demonstrative ability of problem solving, coordinating and planning
EDUCATION
Master of Science in Industrial Engineering (specialization in Supply chain
Management) December2009
Oklahoma State University, Stillwater, Oklahoma
GPA 3.3
Bachelor of Technology in Industrial and Production Engineering
April 2007
Acharya Nagarjuna University, Guntur, India
GPA 3.8
PROFESSIONAL EXPERIENCE
Quality Engineer Internship
Smith International Inc, Houston
Jun'08-Aug'08
. Implemented lean manufacturing and six sigma techniques for elimination
of wastes and increase productivity
. Attained workable knowledge in advanced statistical and Modeling tools
. Achieved breakthrough improvements; Eliminated human errors by 4%
. Performed statistical analysis of data using JMP, Minitab, Matlab and
SAS software
. Saved $92k per year by eliminating bottlenecks and reducing the work in
process time
. Monitored the Coordinate Measuring Machines utilization, downtime and
implemented corrective actions to make proper readings and fixed the
errors in measuring process
. Assisted workers in equipment utilization and maintenance.
Industrial Engineer Internship
Kumar Pumps & Motors, India
May'06- Apr'07
. Managed daily changes in customer scheduling requirements and improved
process efficiencies
. Balanced work flow between manufacturing facilities and minimized
inventory carrying cost
. Implemented TQM and TPM techniques for reducing errors in
manufacturing process
. Improved overall equipment effectiveness of machines by 15%
. Saved $64K per year by minimizing machine breakdown time and work in
process time
. Reduced total manufacturing cost by 30%
. Recommended new production equipment for increasing the process
capability
Supply Chain Analyst Internship
Lavanya Enterprises, India
Mar'05- Apr'06
. Analyzed sales data, forecasted, ordered production, shipped over 50k
units per month
. Saved $42k per year and eliminated surplus place by capacity planning and
minimizing inventory
. Computed quantity of raw material needed, prepared request of material
and updated inventory status
. Implemented inventory management techniques for minimizing inventories
and accurately meet demand
. Knowledge and experience with SAP Material management software
Projects:
1. Supply Chain Optimization
. Managed and planned production events in a manufacturing firm to meet
variable seasonal demand
. Applied inventory management concepts to control production and logistic
movements
. Reduced transportation cost and inventory expenses.
2. Enterprise Resource Planning
. Hands on experience with SAP software
. Worked on materials management(MM) and distribution(SD) modules of SAP
. Processed customer orders, created organizational structures and
developed production orders
3. Project Management
. Attained knowledge in MS project software
. Expertise in identifying the tasks, resources needed and goals for
completion of project
. Determined project plan with goals and objectives to organize a soccer
coaching camp
4. Data Process and Object Modeling
. Intellect in Microsoft Access for designing Database
. Demonstrable knowledge in Logical and Physical models in the analysis,
design and improvement of enterprise systems.
. Generated a variety of outputs which include scheduled events in a
calendar format, invoices/receipts for the participants, income and
expense statements and budget statements
5. A Multi objective optimization using Genetic Algorithms - A Case study
in turning operation
. Models for cutting force and surface roughness were developed using step-
wise multiple regression technique
. Minimizing cutting force and surface roughness, and maximizing material
removal rate were considered as objectives and an attempt was made to
optimize the process using Genetic Algorithm approach
. Implemented C language for fabricating a code for Genetic algorithms.
COMPUTER SKILLS
Languages: Java, HTML, C++, C
Operating Systems: Windows 9x, 2000, XP, Vista
Tools & utilities: AutoCAD, I-DEAS, ANSYS, PRO/E, MATLAB, SolidWorks MS
Office Suite, Front Page, UML, IDEF0, IDEF3, JMP, Minitab, MS Project, SAP
R/3, SPSS, MS Visio, MS SQL
Professional Affiliations
Member of American Society for Quality (ASQ)
(Aug'09-present)
Member of Institute of Industrial Engineers (IIE)
(Aug'09-Present)