HOWARD ORRINGER
***** ***** ***** *****: 248-***-****
Fenton, Michigan 48430 Email:abmo1d@r.postjobfree.com
CAREER SUMMARY
Engineering and Management Professional with 12 years of diversified
experience in weld tool construction, sheet metal stamping, powertrain
assembly, and plastic injection molding. Solid background in operations
management, management consulting, manufacturing planning, industrial
engineering, and quality systems management. Highly developed ability to
manage large groups with demonstrated successes in production and
continuous improvement.
PROFESSIONAL EXPERIENCE
DEWOLFF, BOBERG AND ASSOCIATES, Dallas, TX 2010
Management Consulting
Management Consultant 2010-Present
Developed streamlined Management Operating Systems (MOS), coached
managers and supervisors on structured management techniques, held
managers accountable for savings generation from throughput improvement
and headcount reductions
. Coached supervisors / managers on goal oriented supervision practices
resulting in a 25% headcount reduction and a $2.8M annualized savings
at Iron Mountain UK - Central Region.
GENERAL MOTORS CORPORATION, Grand Blanc, MI 2001-2009
Global Automotive Manufacturer.
General Foreman 2nd shift 2008-2009
Managed four Salary employees, three Contract Employees, and 120 Hourly
employees in the Construction and Integration of General Motors Body Shop
Weld Tools.
. Acted as the 2nd shift mechanical engineer, design support, and
manpower planner for tool construction of the Chevy Cruz and Volt
ensuring schedule compliance toward launch.
. Reduced total construction timeline from 16 to 12 weeks by leading
continuous improvement teams to remove redundancy and decrease lead
time.
Processing / Design Support General Supervisor 2007-2008
Managed 20 employees ( both salary and hourly ) in the coordination of
weld tool construction.
. Oversaw design verification, design processing, steel / component
ordering, job / component tracking, and Unigraphics operations to
guarantee that manufacturing received all designs and materials to
meet launch timelines.
. Developed and implemented systems to decrease lead time from design
receipt to start of build by 50% through work with IT, suppliers,
design groups, and processors.
Project Manager 2007
Planned, organized and managed resources for body shop weld tool
construction.
. Led design review workshops including design, engineering and
manufacturing leaders which facilitated the successful launch of the
2009 Chevy Camaro.
. Streamlined purchasing, design groups and manufacturing resulting in a
20% decrease in timing for Design, Construction and Integration of the
body shop tooling for the Chevy Camaro.
GENERAL MOTORS CORPORATION ( continued )
Manufacturing Planning Administrator - Pittsburgh Stamping 2005-2007
Coordinated plant production and maintenance activities as well as
performed production shift manager duties as needed.
. Analyzed machinery downtime data to schedule a preventative
maintenance plan insuring Quality Network Planned Maintenance ( QNPM )
compliance.
. Increased throughput plant wide by 10% through the leadership of
weekly Continuous Improvement workshops and supporting the
implementation of business plans.
Manufacturing Planning Administrator 2005
Oversaw the Manufacturing Engineering Department including three salary
engineers.
. Developed and instituted a facility buildout plan including
reallocating or running long term buys for 423 die sets and assembly
cells and dispersing 926 hourly employees to other facilities as
manpower requirements decreased.
Industrial Engineer 2001-2005
Created production plans through manpower and budget analysis of current
and future volumes.
. As the subject matter expert for Continuous Improvement, trained 1200
employees to develop proficiency in lean manufacturing techniques and
implement lean strategies.
. Conducted cycle time evaluations, throughput analysis, delay studies,
trucking studies, and manpower studies to develop lean operations in
metal stamping and assembly processes.
Production Supervisor 2003
Supervised 25 production employees on six Conventional and two Transfer
press lines.
. Effectively managed employees to achieve goals in Safety, Quality,
Throughput and Cost.
. Attained 2nd Quarter 2003 most improved Conventional Press Line - MFD
C-Line.
TRIALON CORPORATION, Troy, MI 2000-2001
Technical staffing service to General Motors Corporation - Powertrain
Division.
Contract Lead Industrial Engineer 2000-2001
Analyzed manufacturing, safety, ergonomic, tooling, layout, and manpower
issues that arose as concern during the launch of the I-6 Engine
facility.
. Developed and standardized all operator work instructions ( Best
People Practices ) on the cylinder head and block machining lines
leading to increased quality and throughput.
. Eliminated the top 25 bottlenecks by performing time studies and delay
studies as well as monitoring throughput for the Assembly, Cylinder
Head and Cylinder Block departments.
AMERICAN PLASTIC TOYS, INC., Walled Lake, MI 1999-2000
Plastic injection molding toy manufacturer.
Quality Assurance Manager 1999-2000
Oversaw quality department including 16 quality technicians in four
plants nationwide
. Decreased yearly customer returns by 20% through the institution of a
quality system.
. Designed, instituted, and evaluated assembly lines using continuous
improvement philosophies to create more efficient manufacturing
outputs.
EDUCATION
B.S, Engineering Arts, 1998
Cognates in Business and Supply Chain Management,
Michigan State University, East Lansing, MI