Asad Mumtaz

H # E-**/*/B, *A Railway Housing Society

Gulshan-e-Iqbal, Block 10-A, Karachi.

Telephone # +92-334-*******, 021-********

E mail: abmnr0@r.postjobfree.com

Objective:

"A challenging diverse and dynamic job with good amount of freedom and

corresponding work responsibility. I look forward to join a growing

organization where I can put in my share of contribution, into its growth,

resulting in a relationship of mutual benefits".

Qualification:

Degree Subjects Year Div/Grade University/Board

B.E. Industrial 2011 "1st Institute Of Industrial Electronics Of

Electronics Division" Engineering (IIEE), PCSIR, NEDUET

Karachi

H.S.C. Pre-Engineerin 2007 "A" Board of Intermediate & Secondary

g Education MIRPURKHAS, SINDH

S.S.C. Science 2005 "A" Board of Intermediate & Secondary

Education MIRPURKHAS, SINDH

Work Experience:

Baig Engineering, Fatek (Oct 2012 to date)

Automation Engineer (Plc Programmer).

Industrial Business System (IBS) (April 2012 to Aug 2012)

Worked as a Plc Programmer and also managed Hardware Alignment.

Pakistan Council of Scientific and Industrial Research (PCSIR) (JUNE 2010).

Intern: Worked in Embedded System Design Laboratory,PC&IC.

Pakistan Steel Mills (JUNE 2011-JULY 2011)

Intern: worked as a maintenance engineer.

Projects:

Fauji Akbar Portia Marine Terminals(FAP) :

Designed and implemented a controlling project with HMI MT6070i weintek

using FATEK PLC.The aim of the project was to design an automatic Bagging

Conveyor System with additional features.

Libra Engineering (Keyence300 PLC) :

Designed and implemented a controlling project with HMI weintek 6100i using

Keyence KV300. The aim of the task was to design and control the status of

different breakers, transform key switching also to design event log for

breakers that tells the on and off and operating status (time, date, etc)

of breakers.

Abbott Laboratories (Pakistan) Limited:

Designed and implemented a controlling project with HMI using Siemens

s7-200 PLC, the aim of that project was to display the actual counting of

the

packets(cartons), target values and the efficiencies of different medicines

packaging, as well as I designed different features in that project.

Automatic Switching Control of Gaseous System at GSK Pvt, Ltd. (using FATEK

PLC):

Designed and implemented a controlling project with HMI MT6050i weintek

using FATEK PLC. The aim of the task was to switch the gaseous system on

CNG inlet when SSG pressure falls below the set point and to switch back on

the SSG inlet on recovering of the desired SSG pressure.

Abbott Laboratories (Pakistan) Limited:

Designed and implemented a controlling project with HMI using Siemens s7-

200 PLC, the aim of that project was to display the actual counting of the

packets(cartons), target values and the efficiencies of different medicines

packaging, as well as I designed different features in that project.

Abbott Laboratories (Pakistan) Limited:

. The project was to upgrade Abbott I.M.A machine PLC from S5 to S7-300

siemens technology.

. This includes the panel designing, reprogramming of machine software

and HMI designing, as well as added some new features in the machine.

. We have worked on 58 digital inputs, 28 digital outputs and four analog

outputs. The Analog signals are to control cartoning inverter, blister

inverter, prefeeder and feeder vibrator..

SCADA: Dual PLC based MPI Subnet:

The objective was to design and implement a SCADA system using two PLCs

as RTUs, Multipoint interface subnet as Communication Equipment, and a

Computer as SCADA Computer (MTU) using WinCC V6.0 as SCADA software.

Final Year Project:

Designing Of Battery Charger-Cum-Driver With Enhanced Charging Time for

Karakorum Motors, Karachi.

Worked with Karakoram Motors Pvt. Ltd. on a project of an electronic

charger and Driver for the electric car. The theme of the project is to

charge the battery bank of 72V 100Ah. The existing setup requires 8 hours

charge the battery bank completely. Our design reduces the charging time of

the bank and takes 5 hour to charge the battery bank from 0 to 100%.

Semester Projects:

. Siemens S-7 Elevator control.

. Worked on "Temperature control system" Using 8051 micro controller

(Final Year) (Embedded Systems).

. AVR based "soft starter" (Final Year) (Electronic Motor Drive).

. Temperature monitoring and control using thermistor (3rd year)

(Industrial Process Control).

. Worked on "Rotor Control" (3rd year)(Feedback Control System).

. Driving stepper motor using parallel port interfacing (2nd Year)

(Introduction to Computer Programming).

. Temperature Monitoring system using Parallel port interfacing (2nd

year) (Instrumentation & Measurement).

Skills Set:

SOFTWARE:

I worked on the following computational and simulation packages:

Languages: Visual Basics, C, Assembly for ATMEGA162, 8051.

Packages: MS Office (All Versions), Adobe Photoshop.

Technical: Matlab, Multisim, Orcad, AutoCAD, Step7 (Siemens PLC),

WinCC,WinCC Flexible LABVIEW, WinProLadder (Fatek PLC), Easy Builder

8000,Indusoft Web Studio,GX Developer.

HARDWARE:

I used following Tools, Systems and facilities at IIEE:

1. Tools: Oscilloscope, Signal Generators, various measuring

instruments and sensors.

1. Programmable Logic Controllers (PLC): Siemens S7.

1. Microcontrollers: ATMEGA162, ATMEGA32.

1. Pneumatic Control System: FESTO Electro0Pneumatic system.

1. PCB Designing & Manufacturing:Photo-Resist Film and Screen-

Printing techniques.

Certificates:

1. Certificate Course In ATMEGA162(Microcontroller)from Star

Engineering, Karachi( March 2010)

1. Attended short term certificate courses & seminars on Image

processing conducted by UIT-IEEE student bench.

References & Testimonials

References will be available on request.



Contact this candidate