Arther I. Bhatti
*** ****** ***, **** *******, CO 80526
Cell 970-***-****, Home 970-***-****
************@*****.***
www.linkedin.com/in/artherbhatti
SUMMARY
Professional Engineering Manager with extensive experience in Supply Chain,
Procurement, Manufacturing and Project Management in the Electronic
Industry; Strengths include:
. NPI manufacturing implementation at Local and Overseas
Facilities
. Strategic Sourcing PCBA, Chassis, Microelectronics and EMS
Service
. NPI Chip Manufacturing/test and Computer Server/Workstation/PCA
assembly/test
. Low Cost Region Manufacturing transfer management and Cost
Reductions
. Development/ Management of Subcontractor Relationships and
Supplier Quality
. Manufacturing leadership in Cross-functional and complex global
supply chain
. Strong initiatives, timely solutions and Result oriented
leadership
. Failure Analysis, Testing, Quality and Reliability
PROFESSIONAL EXPERIENCE
HEWLETT-PACKARD, Ft. Collins, CO
1989-2009
NPI Procurement Engineer (2004-2009)
< Developed NPI Manufacturing Plan in Q2 2008, reducing development cost
by $12M for Major HP Computer Sever Program. Led successful transition
of New Servers to Low Cost region.
< Led sourcing effort of lower cost components and use of Low Cost
region to reduce standard cost by 70% per year for Security Product
Program, and achieved $7.4M cost avoidance.
< Led cross-functional team to develop semiconductor Chip Harvesting
Process which captured $34M Revenue in Q1 FY09 that was otherwise in
Jeopardy. Published paper specifying process for future, reviewed
reliability and warranty impact, and made recommendations.
< Project managed transfer of high end HP Enterprise Server, Superdome,
and Manufacturing to Lower Cost region to achieve $6M/year Cost
Reduction. Led team of Mechanical Engineers, Commodity Managers, R&D
and Planners to set process, and worked with Order Fulfillment Centers
in Houston, Germany and Singapore to manage inventory and carry out
smooth transition to prevent any negative customer impact. Received
stock options and salary increase for this accomplishment.
< Selected suppliers, implemented/managed processes, negotiated assembly
cost, established supply
Chain links, established quality metrics, led corrective actions and
directed manufacturing
Operations for HP on new products, and set up DFx Process
< Linked HP geographically dispersed teams that enabled Labs to complete
thorough DFx Review and PCA Assembly Process Qualification before
design release and proto build.
< Negotiated best turn-around time (TAT). Developed Statement of Work
(SOW) and managed RFQ processes, and analyzed quotes. Communicated
forecasts and analyzed capacity.
< Led multidiscipline program reviews with internal teams and suppliers,
covering test development,
Design, verification, capacity, human resource and training concerns,
and manufacturing
Readiness and reviewed status and initiatives with upper management
for approval.
Manufacturing Program Management of Microelectronics (1997-2004)
< Managed and placed Test and Assembly Processes at IBM/Intel/ISE Lab
for HP PA RISC 8800, 8600, 8700 and Custom Memory Controller.
< Wafer Probing and Package test tool development and tester procurement
and responsible for testing of Wafers and Chip Packages and
reliability. Technical reviews and Milestone Reviews.
Arther I. Bhatti (Page 2) Cell 970-***-****
************@*****.***
< Responsible for major turn-around of poor performing vendors to
excellent and Management of Risk. Established this supplier for viable
test source for life cycle of many microprocessor programs. HP gave
supplier "Most Valued Partner" Plaque after six months.
< Wrote detailed Interface Agreement between internal cross-functional
teams to ensure compliance with goals and quality metrics.
< Wrote criteria for Release to Production Test (RTPT) and drove SOW.
< Led awareness campaign for EU lead-free directive and compliance
requirement.
< Led Manufacturing Readiness reviews with cross-functional teams and
contract manufacturers. Responsible for status review with upper
management.
Component Engineering (1995-1997)
< Responsible for material change qualification and approvals.
( Qualified changes and characterized microprocessors in
Servers/Workstations with schmoo.
< Wrote Qualification Criteria a Sampling Plan and Regression Analysis
< Microcontroller, Memory and standard chip materials Engineering
< Root Cause Failure Analysis of Memory and Microprocessors
Design Engineer for Storage Systems Division (1994-1995)
< Integrated new disk drives into storage systems.
< Designed and procured cable assemblies.
< Performed reliability, quality and regulation tests.
Quality Engineer (1992-1994)
< Environmental/Safety/FCC Qualifications and Quality Improvements of
all new products. Managed FCC and regulation testing.
< Conducted industry study of environmental specifications and re-wrote
specifications for new products.
Production/Procurement Engineer (1989-1992)
< Analyzed ASIC Reliability and impact of Burn-in process and proposed
elimination of Burn-in for no value-add, decreasing cycle time.
< Sourced custom cable assembly, connector and PCB.
< Provided engineering support on manufacturing line of disk drives;
failure analysis and process
Control.
TECHNOLOGY
. Disk Drives, Storage Systems, Computer Hardware, PCI Cards, Encryption
PCI cards
. Cable Assembly, Connectors, Sheet Metal Chassis, PCB Assembly
. ICT Test, Functional Test, Wafer Probing, Package Testing, Chip
Validation
EDUCATION
( BSEE from University of Texas at El Paso, 1988
( MSEE from National Technology University, 1994
TRAINING
( Project/Program Management, Quality/Reliability/Lean Manufacturing
( Familiar with TQM, Six Sigma, ISO 9001/ISO 14001 and SPC
( Supply Chain Management
( Excel, MS Word, Power-Point, Outlook, MS Project