George Pang
Planning & Scheduling, Project Controls, Field Engineer
~Specializing in Commercial and Industrial Construction~
Professional Profile:
. Over 10 years experience with project management software; working
knowledge of Primavera, P3, P3e, P5 & P6, and MS project
. Extensive experience in database development and implementation
. 12 years construction experience with 5 years of EPC power plants
project experience
Areas Of Expertise:
. Construction Planning & Scheduling
. Cost Engineering
. Project Setup & Configuration
. Impact and Risk Analysis for Finish Date, Cost Variance & Critical
Activities
. Project Controls
. Project Closeout Process Management
. Primavera P6, P3, P3e/c, Contractor, Suretrak, MS Project, and Pertmaster
Risk Analysis
PROFESSIONAL EXPERIENCE
James W. Fowler Co., Portland, Ore. Oct 2009 to
Present
(Balch Consolidation Conduit Shafts & Pipeline / Lake Oswego Interceptor
Sewer -Lake Down Project)
Project Scheduler
Develop, monitor, and update multiple integrated project plans and
schedules (P6) so that projects can be executed in the most efficient
manner possible. Prepare baseline schedules and schedule basis documents
for approval by project teams. Assess impacts to the critical path and near-
critical activities and report to the project team. Monitor schedule
deviations and variances and assist in the developing alternate methods for
corrective action. Prepare and provide schedule progress reports, trending
charts and schedule analysis on a periodic basis. Maintain record of scope
changes, trends and variances that potentially affect schedule performance.
Review schedules with project team members on a regular basis to ensure
that accurate and timely data is incorporated in the schedule. Resource
load schedules as required by the project team. Assure credibility of the
information contained in the As-built schedules. Perform jobsite walks to
verify physical progress of scheduled activities. Facilitate project
scheduling meetings and interactive planning meetings.
J&J Maintenance Inc., Honolulu, HI Mar 2009 to Oct
2009
(Tripler Army Medical Center)
Project Manager
Assists the Regional Manager and Senior Project Superintendent with
planning/scheduling, and oversees on-site work sequencing and construction.
Coordinates Task Order construction related activities with the Facility
Manager and is responsible for overall coordination of all construction
activities. Acts as J&J's field representative for interfacing with
Government inspectors. Interfaces with Government authorities on issues
such as the identification of hazardous materials, utility clearances and
permits, fire alarm systems installation, inspection, and outages, and
coordination of work activities to limit disruption and inconvenience for
facility staff and users.
Scheduling & Information Services, Inc., Los Angeles, CA Feb 2009 to Mar
2009
(Hollywood & Vine Project for Legacy Partners Builders)
Scheduling Claim Analyst
Provide analysis of schedule updates & changes in contractor's schedule.
Provide analysis information and support to rebuttal monetary claims for
time loss.
Scheduling & Information Services, Lahaina, HI May 2007 to Feb 2009
(Westin Ka'anapali Ocean Resort Villa for Starwood Vacation Ownership
Pacific)
Project Scheduler/Coordinator
Review and manage project schedules for multi building project. Manage
punch list process and overall completion of the resort's restaurant, spa
and workout facilities. Interface directly with owner representatives
during turnover. Conduct weekly quality control/assurance meetings and
report to the owner. Project scope: eight buildings with six floors per
building, extensive exterior grounds with multiple swimming pools and a 4-
story Parking Garage. $207M total capital cost.
Nooter Construction Company, Wilmington, CA Apr 2006 to May 2007
(for Valero Wilmington Refinery)
Project Scheduler
Work directly under project manager to provide current information on
project status and changes. Create and implement an estimating and
monitoring system for piping installation, using MS Access and Primavera
P3e, for a multiple phase gasoline refinery project. Provide daily updates
and material "take off." Prepare and issue weekly progress and forecast
reports for project managers. Assist with progress data to formulate and
update the current schedule.
CEntry Constructors & Engineers, Sandy, UT Oct 2005 to Apr 2006
(Sister Company to Layton Construction, Project for Pacific Corp)
Project Control Specialist
Design and maintain resource loaded project schedules using Primavera
Project Planner (P3). Implement Primavera 5.0 in order to utilize the most
current scheduling tools (at that time). Review critical path, resource
loading, schedule content, use of relationships, lags, milestones and
constraints. Perform daily update to the construction activities to
determine duration and logic issues. Prepare progress/status reports and
resource loaded histogram. Identify potential risks on contract
requirements and provide analysis reporting for resolution of liquidated
damages (LDs).
Gilbane Building Company, San Diego, CA Mar 2005 to Oct 2005
(for Sharp Memorial Hospital)
Project Scheduler/Field Engineer
Monitor and update the master schedule for a 23,400 SF modernization
project for an existing hospital using P3. The project is a multi-phased
construction of a 7-story, 302 bed patient tower; includes new OSHPD
approved construction, a complete emergency department, new hospital
entrance and lobby, and administrative completion of the new tower.
Contract work for Calpine Construction Group Mar 2004 to Mar 2005
(for Calpine Corporation)
Field Engineer/Planner
Use P3 to provide project planning and scheduling support necessary to
enable Project Management to effectively manage resources. Provide analyses
and recommendations as to potential delays & critical areas. Develop
tracking system to monitor and verify weekly construction progress. Develop
startup schedule and maintain on a weekly cycle. Perform monthly progress
payment auditing. Develop the second phase construction schedule for an on-
going power project. Create and maintain a pipe-tracking database to track
historical project controls information. Work on development of a
historical database for multiple power plant projects.
The Industrial Company (TIC), Steamboat Springs, CO Feb 2000 to Mar 2004
Field Engineer III
Develop and maintain multiple man-loaded Critical Path Method (CPM)
schedules using Primavera Project Planner (P3). Monitor field performance
verse planned, and provide communication of the sequence of activities,
changes, resources and status of the project to the construction manager,
work force and clients. Maintain and update weekly progresses of a 3-week
look-ahead schedule, 48 hours daily work plan, and work package database
(MS Access). Provide graphic and tabular daily/weekly/monthly reports to
clients. Analyze and recommend plans for resource allocation, progress and
alternatives to generate a more profitable method for executing the overall
plan. Perform material take off, field estimation and procurement
administration activities. Issue construction change-orders and maintain
RFI log. Train staff on Excel Spreadsheet, Access database, Power Point,
Primavera Project Planner (P3), and Internet/Intranet usage. Monitor and
maintain office WAN and LAN networks.
Black Construction Corporation, GMF, Guam Aug 1998 to Feb 2000
Field Engineer/Cost Engineer
Develop and maintain several CPM schedules for DoD/Navy. Monitor progress
in the monthly schedule of values. Provide monthly billing and forecast to
clients. Perform material take off, field estimation and procurement
administration activities. Establish and manage a consolidated cross-
project-schedule-reporting system to support overall resource planning and
loading. Issue construction change-orders. Ensure efficient, timely
completion of projects and deliverables.
Harmon Corporation, Harmon, Guam Apr 1997 to Jul 1998
Project Coordinator/Estimator
Provide material controls for TGI Friday's restaurant. Monitor and update
procurement and construction activities. Provide coordination to vendors on
a pre-cast/pre-stressed double tee parking structures. Assist project
engineer with administrative tasks included work orders, concrete delivery,
and material take-off.
Wastewater Treatment Plant (City of Boulder, Colorado) May
1995 to Aug 1995
Maintenance Helper
Provide assistance to foreman on maintenance of facility. Perform routine
maintenance to clarifiers and sludge tanks, and pumps. Assist with
landscaping work.
EDUCATION & SPECIAL TRAINING
University of the Pacific, Stockton, CA
Bachelor of Science in Mechanical Engineering (Minor in Japanese
Language) - 1993
Engineering Curriculum Certified by Accreditation Board for Engineering
and Technology (ABET); Graduated with Honors.
AACEI Certified Planning & Scheduling Professional (PSP) - demonstrated the
skill and knowledge of a professional planner/scheduler.
Primavera Project Planner Certified Training -
P3 Course # 602, Resource and Cost Analysis
P3 Course # 603, Managing Project Data
P3 Course # 604, Creating Reports and Graphics
Engineer-In-Training (EIT), California State Board - License No. XE090229
ASHE Healthcare Construction Certificate (HCC) program - understanding of
the latest compliance issues in healthcare construction and the
expectations of owners, staff, and patients
Master Plumber, Guam - Contractor's License No. 6
A+ Certified Computer Technician, Comp TIA Certification Program
(COMP10365031)
Completed 40 hours of Professional Technical Education, Passed State Board
Examination (verification # F59DTT089B)
NCCER Train the Trainer Program -Certified Construction Trainer
ICBO Mechanical Inspection II - Advanced Applications of the UMC