Post Job Free

Resume

Sign in

Project Manager Engineer

Location:
Omaha, NE, 68105
Posted:
May 20, 2010

Contact this candidate

Resume:

Thomas L. Smith II

Phone: 402-***-****

Mobile: 402-***-****

Email: abmk6e@r.postjobfree.com

SUMMARY/INTRODUCTION

A skilled Cost Estimator & Coordinator, with proven Project Management /

Procurement capabilities, seeking to Plan, Direct, and Coordinate projects,

with the goal of extending my career achievements, managing construction

projects, building strong client relationships, leading effective

communications and coordination efforts to provide solid support with a

growth oriented company

CORE STRENGTHS

* Assemble Contract/Construction Documents * Value

Engineering, Project Evaluation & Development

* Organize & Implement Procurement Plan * Assemble Project

& Development Proposals, HUD

* Proficient with Microsoft Project, Word, Excel * Operate

Timberline, BIM, Agtek, AutoCAD 2010

* Plan / Conduct Pre-Bid & Pre-Construction Services * Public

Speaking, Community Service, Coordinator

PROFESSIOAL EXPERIENCE

June 2007 - June 2009 HDR Design Build, Inc. - Project Engineer /

Cost Estimator, Construction Administration

. $26M - Biosolids Processing Facility - West Palm

Beach, Florida

. Coordinate Equipment Procurement with Design Build

Project, prepared contract documents

. Estimate, Water/Wastewater Treatment Plants,

Hospitals, Metal Bldgs. from $3M to $100M.

October 2004 - June 2007 Omaha Housing Authority - Project

Facilitator, Contract Administrative duties, Coordinator

. $4,500,000 - Facilitated Capital Improvement and

Development Projects Constructing Homes

. $1,154,815 - Coordinated Site Improvements

. $800,000 - Facilitated coordination, field engineered

the scope of work for Cherry Apartments

. Preparation of Development Proposal to obtain HUD

funding for Chambers Court Renovation, Long School

and North Omaha Development Projects.

March 2003 - Present CMC,LLC - Construction Management Contractors

- Owner / Manager

. Consulting, Project Management & Estimating Services

. $25,250 - Bob Kerrey Pedestrian Bridge parking lot

improvements, / City of Omaha Parks

. $36,163 - SID 286 Project - 180th & Q Street,

Constructed sidewalk, culvert pipe, and inlets

. $22,750 - Benson & Gallagher Park, constructed Ball-

field dugouts, City of Omaha Parks

September 2000 to Mar. 2004 Rupert Construction Co. - Project Manager /

Cost Estimator, Heavy highway

. $74,245 - Omaha Field Club Trail, Prepared cost

estimates, Project Manager

. $30,250 - Heartland Park - Concrete Sidewalk

February 2000 to Aug. 2000 Kiewit Western Co. - Engineer / Estimator,

. $1,700,000 - Union Pacific Auto Unloading Facility,

Council Bluffs, IA

. $2,200,000 - I-229 Heavy highway, South Falls, South

Dakota

Project Engineer / Coordinator, assist with preparing

cost estimates, construction administration

and project coordination.

EDUCATION University Nebraska-Omaha

Masters of Engineering in Construction Graduate Student

Bachelors of Science in Engineering Technology (May,

1999)

Associates of Science in Engineering Technology

(December, 1997)

SKILLS AND ACCOMPLISHMENTS

*AACE - Certificate of Achievement for Estimating/Bidding

*DBIA - Certificate of Completion for Conceptual

Estimating

*Bangert - Certificate of Achievement for Timberline

CERTIFICATION

*Nuclear gauge training, soil properties instrument

Thomas L. Smith II - List of Project Estimates

City of Coeur d' Alene, WWTP Low Phosphorus Demonstration Pilot Facility,

Coeur d' Alene, ID.

Evaluated the installation cost of three separate types of Low Phosphorus

treatment. Treatment includes membrane bioreators (MBRs), tertiary

membrane filtration (TMF) and continuous up flow media filtration (CUMF).

All three systems were to be capable of maximum monthly flow of 50,000 gpd

with remova efficiency of up to 200,000 gpd. Estimate of probable cost was

$3,803,000.

Coucil Bluffs Water Works South Water Plant, Council Bluffs, IA.

Developed an opinion of probable construction cost estimate for the 30% and

60% design levels. The facility was a submerged membrane design with an

initial capacity of 10 MGD expandable to 20 MGD with significant structural

modifications. Process include filter tubs for 20 MGD of submerged

membranes, chemical feed facilities for 20 MGD and High service pumping

capacity of 10 MGD expandable to 20 MGD with the addition of pumps only.

60% design level opinion of probable construction cost was $36,578,000.

Pinellas County Utilities, Pinellas County, FL - Onsite Sodium Hypochlorite

generation projects.

Provided cost estimating services for 4 separate hypochlorite generation

projects at various pump station and waste water treatment plants: a) South

Cross Bayou, b) William F. Dunn WRF, c) Water Transmission Logan Pump

Station & North Booster Pumps Station, d) Oakhurst Pump Station, and Capri

Pump Station, Gulf Beach Pump Station. Opinion of probable cost for all

segments was $4,310,000.

Orlando Utilities Commision - 14 miles of 24" reclaimed water transmission

main, Orlando and the City of Apopka, FL.

Developed 4 opinions of probable construction cost for client in selecting

a potential routing of a 24" reclaimed water transmission main from an

existing Orlando water treatment plant to a new City of Apopka water

treatment plant. Opinion of probable cost for the base estimate was

$100,316,000.

Anacortes Wastewater Treatment Plant - Odor Control Duct Modification FRP

- $759,702

Charlotte, NC - Cary / Apex WTP - Earthwork, Equalization Basin -

$1,416,394

Arizona - CAP, Salt Gila Pumping Plant- Potable Water Connection Plant,

Sitework, Mechanical - $366,920

Arizona - CAP, San Xavier Pumping Plant - Potable Water Connection Plant,

Sitework, Mechanical - $247,488

Nevada - Coyote Springs Development - WWTP Effluent Storage ponds & RWPS

Wet Well - $4,768,216

Atlanta, GA - Johnson Creek Pump Station - Concrete Lift Station, Earthwork

- $1,240,791

Norman, OK - Norman Lift Station D Rehabilitation - Equalization Basin,

Sitework - $1,519,412

Waco, TX - WMARSS Central WWTP Expansion - Concrete Peak Storage Flow -

$522,929

South Dakota - Lewis & Clark WTP - Cast In-Place Concrete Structure,

Concrete Block Walls, Structural Steel, Earthwork - $29,225,452

Alamogordo, New Mexico - WWTP - Earthwork, Structural Concrete, Yard Piping

- $10,855,495

Port of Sunnyside, Washington - WWTP - Earthwork, Structural Concrete, Pre-

Engineered Metal Building - $992,793

Yadkin Valley Water Supply, Caldwell County, NC - Well Development Project

- Earthwork, Mechanical Piping, Concrete Paving, Pre-Engineered Metal

Building, Electrical - $5,623,443

Anacortes WTP Improvements Project - Earthwork, Structural Concrete,

Mechanical Piping, $49,598,675



Contact this candidate