Career Objectives
Maintain a high standard of Cost and Project Controls Management
while continuing to study and improve on Construction Best Practices and
mentoring others. Opportunity
Summary of Qualifications
Seventeen years of experience in the Heavy Industrial Construction
Industry working in Project Controls, Cost Management/Engineering,
Earned Value Management, Material Management, Field
Engineering/Coordinating, Planning, and Front Line Supervision for
construction of Chemical facilities, Natural Gas Power Plants, Solar Power
Plants, Concrete facilities and Petrochemical complexes. Experience
with plant Models and other computer software; namely: Microsoft Dynamics
SL, Meridian Prolog, CMIS, PipeEst, Pipe TrackIt, MS Word, MS Excel, and
MS Power Point. Also some minor experience working with MS Access and
Primavera P3 and P6. Also have an excellent knowledge of Standard
Operating Procedures and established Safety Standards (OSHA/MSHA) for
Industrial Construction.
Professional Experience
Sr. Cost Analyst
Lauren Engineers & Constructors, Inc. 4/2007
- Present
Project: Corporate
. Assist Project Controls Manager in the planning, development and
supervision of all cost functions.
. Insure that all project cost activities such as data collection, field
estimating, productivity analysis and budget forecasting comply with
company and client requirements.
. Assist with development and implementation of project cost standards
and procedures (including Cost Controls, Change Management and Earned
Value Management).
. Assist with the implementation of a standard costing structure and
insure that all projects adhere to this standard.
. Assist Project Teams with Estimate review, Contract review and Job
Cost Breakdowns for all new projects.
. Assist Project Teams with the setup of the Cost Controls and Earned
Value Management Systems on all new projects.
. On-going support of existing projects as needed (regular analysis,
reporting, forecasting and trending).
. Perform project audits to ensure policies and procedures are followed
and proper reporting is being done.
. Help ensure that all training requirements for Cost Controls policies,
procedures and best practices are indentified and administered in an
appropriate manner.
Project Cost Analyst
Lauren Engineers & Constructors, Inc.
4/2006 - 4/2007 Project: Nevada Solar One
Project Value: 130,000,000 USD
Scope of Work: EPC Project - Solar Power Plant
. Develop a Standard Job Cost Breakdown for the project and implement a
proper Cost Coding structure.
. Develop, implement and maintain Quantity Tracking procedures and
implement Earned Value Management systems.
. Perform Contract review and analysis.
. Develop, implement and maintain Change Order management procedures and
systems.
. Implement new Cost Controls and accounting software.
. Perform regular cost reviews and audits to ensure proper coding and
installed quantities.
. Provide management with weekly and monthly cost reports as well as
analysis and trend data.
. Input project change orders and assist with monthly project
forecasting utilizing Earned Value Management system for labor
projections.
. Help ensure continuity between project Cost Controls and project
Schedule.
Sr. Pipe Field Engineer
T.I.C - The Industrial Company
6/2004 - 4/2006
Project: Choctaw Gas Project
Project Value: 324,000,000 USD
Scope of Work: EPC Project - Natural Gas Power Plant
. Perform monthly cost projections for the Pipe Department utilizing
installed quantities and earned value management system.
. Assist Superintendent with scheduling (1-week, 3-week and 6-week
projections) and coordinate information with Site Scheduler for
implementation into the Master Schedule.
. Perform material take-offs from IFC Drawings for purchasing and re-
estimating.
. Perform re-estimates for Pipe Department as IFC drawings were issued
to the field in order to maintain an accurate tracking and EVM system.
. Write and follow through with RFI's, back-charges and change orders.
. Perform field audits for installed quantities.
. Verify work was performed within specs and scope.
. Manage three (3) Junior Pipe Field Engineers.
Project Engineer
T.I.C. - The Industrial Company
2/2003 - 6/2004
Project: N2 Plant Revamp
Project Value: 4,328,000 USD
Scope of Work: EPC Project - Nitrogen Plant Expansion
. Contract review and analysis including constructability reviews.
. Project Controls Management including Cost, Schedule, Earned Value
Management and Quantity Tracking.
. Office Management including Document Control and Payroll.
. Material Management include material take-offs, purchasing, expediting
and tools and consumables management.
. Change Order management including change analysis, cost and schedule
impact and client negotiations.
. Subcontract management including develop scope of work, bid reviews,
subcontract awards and on-site subcontract management.
Sr. Pipe Field Engineer
T.I.C - The Industrial Company
5/2000 - 2/2003
Project: Bayside Power Project (10/2001 - 2/2003)
Project Value: 926,000,000 USD
Scope of Work: EPC Project - Natural Gas Power Plant
Project: Plant Goat Rock (2/2001 - 10/2001)
Project Value: 318,000,000 USD
Scope of Work: EPC Project - Natural Gas Power Plant
Project: Mississippi Power Project (5/2000 - 2/2001)
Project Value: 295,000,000 USD
Scope of Work: EPC Project - Natural Gas Power Plant
. Perform monthly cost projections for the Pipe Department utilizing
installed quantities and earned value management system.
. Assist Superintendent with scheduling (1-week, 3-week and 6-week
projections) and coordinate information with Site Scheduler for
implementation into the Master Schedule.
. Perform material take-offs from IFC Drawings for purchasing and re-
estimating.
. Perform re-estimates for Pipe Department as IFC drawings were issued
to the field in order to maintain an accurate tracking and EVM system.
. Write and follow through with RFI's, back-charges and change orders.
. Perform field audits for installed quantities.
. Verify work was performed within specs and scope.
. Manage up to five (5) Junior Pipe Field Engineers.
Foreman - Structural/Mechanical/Piping
T.I.C - The Industrial Company
9/1997 - 5/2000
Project: TXI Cement Plant (11/1998 - 5/2000)
Project Value: 258,000,000 USD
Scope of Work: EPC Project - Cement Production Facility
Project: Rinker Cement Plant (9/1997 - 11/1998)
Project Value: 308,000,000 USD
Scope of Work: EPC Project - Cement Production Facility
. Manage crew of twelve (12) to fifteen (15) installing structural steel
and duct work.
. Plan daily and weekly activities.
. Schedule 1 week and 3 week look a-heads in coordination with master
schedule.
. Coordinate work areas with other crew's and disciplines.
. Coordinate equipment time with other crew's and disciplines.
. Manage material for all activities within the crew on a daily and
weekly basis.
. Track installed quantities.
. Scope and Spec review.
. Manage crew performance using Earned Value management techniques
Apprentice/Journeyman - Structural/Mechanical/Piping
T.I.C - The Industrial Company
10/1992 - 9/1997
Project: Various
Project Value: Average 150,000,000 to 300,000,000 USD
Scope of Work: EPC Projects
. Assist Pipe Fitters and Welders with installation.
. Prepare Steel and/or Pipe for installation.
Training
. HAZ COMM (Hazardous Communication) - 1998, 2000, 2001, 2003, 2005
. Frontline Supervisor - 1997, 1999, 2001, 2003, 2005
. OSHA and MSHA - 1993 - 2005 annually
. T.I.C Pipefitting and Welding Apprenticeship Program - 1993 - 1997
Education
. GED Exam Certification - Fernley High School Adult Education
Professional Affiliations & Certifications
. AACE International, Association for the Advancement of Cost
Engineering
. CII, Construction Industry Institute