MARK CLINE
**** ******* ***** **** *****: 248-***-****
Clarkston, Michigan 48348 E-Mail: abmgkp@r.postjobfree.com
CAREER SUMMARY
A Production Executive accomplished in technology management with
leadership and partnership experience in manufacturing processes. An
impact leader who has launched multi-million dollar projects, including
advancing technology levels within existing manufacturing systems. Proven
visionary leadership balancing creative, analytical, and technical
expertise to effectively align cross-functional and global organizations.
Strong work ethic, analytical, collaborative and adaptable team builder.
PROFESSIONAL EXPERIENCE
GENERAL MOTORS, Global Validation Lab, Sterling Heights, MI 1995-
2009
Major manufacturer of cars and trucks that led global sales for 77 years.
Manufacturing Engineering Technology Executive, Global ADT 2006-2009
Advanced Development Team ( ADT ) representative for Body, Press and Die
reporting to the Executive Technical Council. Coordinated and managed an
annual development budget of over $20M and development manpower of
approximately 75 full time equivalent heads globally leveraged cross-
functionally.
. Created the Manufacturing Development Project Portfolio of 195
projects in nine countries to eliminate redundancies and maximize
project outcomes.
. Developed the strategies of lightweighting and flexible or agile
systems for vehicle manufacturing to enable fuel efficiency targets
and reduce vehicle investment costs.
. Created and chaired 26 Gate Reviews of manufacturing development
projects to build global collaboration and communicate development
results.
. Created and chaired 24 meetings of the Global ME Technology Forum (
GMETF ) to increase technology implementation efforts.
Advanced Forming Technology Manager 2004-2006
Responsible for implementation of tube and sheet hydroforming into
production. Launched 28 tube hydroforming parts into production across
ten vehicle platforms. Supervised the installation of sheet
hydroforming, six parts and equipment into production.
. Provided key technical assistance in primary tryout of 16 sheet
hydroformed parts, an industry first to production.
. Created and maintained a website for documentation of sheet
hydroforming information and parameters resulting in a seamless
launch.
. Conducted over 30 technical classes of tube and sheet hydroforming for
over 200 engineers for understanding in part design, processing and
reduce tooling investment.
Building and Operations Manager 1995-2004
Managed all aspects of a stand-alone development facility including
security, facilities management and policies. Determined and managed
budgets for the facility including 25 engineers and $8M annually.
GENERAL MOTORS (continued)
Building and Operations Manager
. Implemented a $26M project to convert facility from stamping to tube
hydroform development resulting in 95% reduction in part tryout and
minimization of risk.
. Trained and mentored engineers in Design of Experiments ( DOE's ) for
development work to reduce development costs by 10%.
GENERAL MOTORS, Die Management Group, Marion, IN 1991-1995
Major manufacturer of cars and trucks that led global sales for 77 years.
Superintendent, Tool and Die Construction and Tryout 1991-1995
Responsible for all functions in the Tool and Die Operations consisting
of Patterns, Construction and Tryout. Managed a total of over 450
employees in the Tool and Die operations with operations budget of over
$8M and tooling investment of $50M annually.
. Led the improvement of Marion Tool and Die operations from worst
performer to leader in cost, timing of delivery and quality in a three
year period.
. Negotiated with the unions ( UAW and PML ) for policy changes and the
grievance procedure at a local level reducing grievance load by 50%.
GENERAL MOTORS, Buick Olds Cadillac Headquarters, Warren, MI 1990-
1991
Major manufacturer of cars and trucks that led global sales for 77 years.
Advanced Manufacturing Engineer 1990-1991
Coordinated all activities related to machining of dies in all GM die
plants. Coordinated all machine enhancements for GM plants in Tool and
Die ( mechanical upgrades and controls retrofits )
. Developed CAD / CAM methods and systems for plant operations resulting
in a $4M cost reduction annually.
GENERAL MOTORS, Fisher Body, Kalamazoo, MI 1976-1990
Major manufacturer of cars and trucks that led global sales for 77 years.
Senior Manufacturing Engineer 1983-1990
Directed and coordinated activities concerned with installation of tool
room modernization.
. Implemented a $42M project to update die construction processes from
manual to CNC on time and on budget to enable die cost reduction of
20%.
. Created a Predictive Maintenance system and controlled $2M annual
budget and manpower for tool room resulting in no unscheduled downtime
for a two year period.
Maintenance Supervisor 1976-1983
Supervision of maintenance skilled and non-skilled employees in a large
stamping plant including the responsibility for hiring new skilled trades
employees.
EDUCATION
MS, Manufacturing Management, General Motors Institute, EMI, Flint, MI
1987
BS, Electrical Engineering, General Motors Institute, Flint, MI 1981