Post Job Free
Sign in

Engineer Quality

Location:
Branchville, SC, 29432
Posted:
April 20, 2010

Contact this candidate

Resume:

WILLIAM L. RIVERS

**** ******* ****

BRANCHVILLE, SC 29432

PHONE 803-***-****(Day)

PHONE 803-***-****

FAX 803-***-****

EMAIL ********@*******.***

SUMMARY

Quality/manufacturing supervisor, with the ability to motivate personnel to

achieve assigned goals. Highly skilled, quality engineer/technician,

specializing in sample submissions, PPAP, APQP documentation, layouts, and

process improvements. SPC and GD&T experience within the automotive

industry. Adept in problem solving.

EXPERIENCE

2008 - 2008 MIDWEST STAMPING, Sumter, SC (Plant closing)

Manufacturer of stampings for Ford Motor Company, Bosch,

Mercedes Benz, Delphi, Chrysler, Nissan, and Volvo.

Quality Manager

Responsible for the quality systems of the Sumter facility,

TS16949, and

interaction with customers.

Quality Engineer

Responsible for quality improvements, through the implementation

of SPC. Responsible for customer interaction. Supervise 3

auditors, and 10 inspectors.

2007 - 2008 PLASTECH ENGINEERED PRODUCTS, Winnsboro, SC (Plant closing)

Major manufacturer of internal and external plastic components

for General Motors, Ford, Chrysler Group, and Mercedes Benz.

Quality Engineer

Responsible for program launches, documentation, APQP

documentation, PPAP's. Write control plans, FMEA's, process

flows, work instructions, perform design of experiments, run at

rate studies, capability studies, gauge R&R's. Help prepare

plant for QS audit, updating standards, to ISO 9001-2000, QS

9000, and TS16949 levels. Assisted in streamlining processes,

removing non value added steps, adding poke-yokes.

2007 - 2007 CUMMINS TURBO TECHNOLOGIES, Ladson, SC (Contract position)

Major supplier of turbochargers to the automotive industry.

Quality Engineer

Responsible for program launches, documentation, APQP

documentation, PPAP's

2007 - 2007 E-Z-GO TEXTRON, Augusta, GA (Contract position)

Major manufacturer of golf cars and utility vehicles.

Quality Engineer

Responsible for program launches, documentation, APQP

documentation, PPAP's

2006 - 2007 WILBERT PLASTIC SERVICES, St. Matthews, SC (Contract position)

Supplier of plastic components to BMW, Roechling, Honda ATV,

Yamaha, John Deere etc.

Quality Engineer

Responsible for documentation, process improvements, and on

line quality.

2006 - 2006 CUMMINS TURBO TECHNOLOGIES, Charleston, SC (Contract position)

Major supplier of turbochargers to the automotive industry.

Manufacturing Engineer

Responsible for documentation, process improvements, PPAP and

APQP activities.

2005 - 2006 E-Z-GO TEXTRON, Augusta, GA (Contract position)

Major manufacturer of golf cars and utility vehicles.

Quality Engineer

Responsible for program launches, documentation, APQP

documentation, PPAP's.

2005 - 2005 PLASTECH ENGINEERED PRODUCTS, Winnsboro, SC (Contract position)

Major manufacturer of internal and external plastic components

for General Motors, Ford, Daimler Chrysler, and Mercedes Benz.

Senior Quality/Process Engineer

Responsible for program launches, documentation, APQP

documentation, PPAP's. Write control plans, FMEA's, process

flows, work instructions, perform design of experiments, run at

rate studies, capability studies, gauge R&R's. Help prepare

plant for QS audit, updating standards, to ISO 9001-2000, QS

9000, and TS16949 levels. Assisted in streamlining processes,

removing non value added steps, adding poke-yokes.

2004 - 2005 BOSE CORPORATION, Blythewood, SC

Major supplier of automotive amplifiers, speakers. Supplier of

wave radios and sound systems.

Quality/Process Technician

Responsible for quality in 3 areas. Improved documentation and

processes in production areas. streamlined process flow,

removed non value steps in process.

1996 - 2004 KOYO CORPORATION, USA, Orangeburg, SC

Major manufacturer of bearings for Ford Motor Company, Toyota,

Mitsubishi, BMW,

Mercedes Benz, Isuzu, etc.

2003 Quality Supervisor

Responsible for 2 plants, 16 inspectors, quality of 65 lines.

2001 Document Control Supervisor

Responsible for ISO 9001 and QS 9000 activities, updating

standards, instructions,

procedures, and conducting internal audits.

2000 Quality Supervisor

Responsible for 2 plants, 16 inspectors, quality of 65 lines.

2000 Section Leader

Responsible for plant 2 operations, 5 departments, 14 lines, 25

operators.

2000 Quality Supervisor

Responsible for 2 plants, 16 inspectors, quality of 65 lines.

1998 - 2000 Quality Engineer/Technician

Responsible for assisting implementation of QS 9000. QS 9000

assignment successfully

completed. Wrote and updated 200 control plans, flow charts,

and FMEA's. per APQP.

1996 - 1998 Section Leader

Responsible for the operation of 11 lines, 2 departments.

+ Productivity 100% - 114% since September 1996.

+ Plant made profit for ten consecutive months, first

time since production

began in 1974. Departments over $3,000,000 above

projected sales.

1996 - 1996 MIDWEST STAMPING, Sumter, SC

Manufacturer of stampings for Ford Motor Company, Bosch, and

Mercedes Benz.

Quality Engineer

Responsible for quality improvements, through the

implementation of SPC. Interacted

with Corporate Headquarters in implementing QS 9000 guidelines.

1980 - 1996 UNITED TECHNOLOGIES AUTOMOTIVE, St. Matthews, SC

Major manufacturer of electrical and mechanical switches

1994 - 1996 Quality Technician/Supervisor

Responsible for all sample submissions, proper documentation

and verification of all

components received. Set up inspection criteria for all

material received. Maintain

documentation for recording monthly reports.

+ Operate CMM (Omis II and Cordax 1000) also

proficient in the use of

Deltronic optical comparator, Wilson hardness

tester.

+ Assisted in writing and implementing inspection

procedures for QS 9000.

1990 - 1994 Production Supervisor

Responsible for all plant operations for second shift,

receiving, receiving inspection,

stocking, production, shipments, interaction with customers.

+ Average production efficiency 98%.

+ No returns from customers during this period.

+ Rewrote operator instructions and implemented

identification system for

GM products.

1985 - 1990 Quality Supervisor/Supplier Quality Assurance

Responsible for inspection of materials, layouts of new

components for all product contacted suppliers with quality

problems, submission issues, and component improvements.

+ Submitted over 300 PPAP'S without a rejection.

+ Implemented computer system for inspection of all

component parts.

+ Implemented Q1 for facility.

+ Wrote inspection instructions for final audit.

1980 - 1985 IP Lab Technician

Responsible for testing of all final assemblies before shipment

to customers.

+ Implemented SPC on all parts tested, maintained all

records, started

gauge calibration system.

EDUCATION NEWBERRY COLLEGE, Newberry, SC

Bachelor of Arts Degree, Economics

GPR 3.5 @ 4.0

SYRACUSE UNIVERSITY, Syracuse, NY

Russian language course for United States Air Force

ORANGEBURG CALHOUN TECHNICAL COLLEGE, Orangeburg, SC

Associates Degree, Accounting

GPR 4.0 @ 4.0

OTHER INTERESTS AND ABILITIES

Computer programs: lotus 123 3.2, lotus 4.0, excel, windows, word, word

perfect, auto cad.

8-D training, Ford Motor Company, Fairlane Training Center, Dearborn

ISO 9001, QS 9000 internal auditor's certification.

United States Air Force 1966/1970. Stationed in Darmstadt Germany.

Honorable discharge. SI security clearance.



Contact this candidate