Andrea Bradford

***** ***** **.

PO Box ***

Altamont KS, 67330

*** - *** - **** ******

Registrations / Certifications

US Army Corps of Engineers

Construction Quality Management 2015

ACI #2419

Concrete Field Testing Tech

KDOT CIT #1717

Basic Inspection Nuclear

Density Gauge

Asphalt Paving Inspection OSHA 10 Hour

Construction Safety

Concrete Paving Inspection OSHA 30 Hour

Construction Safety

Drilled Shaft Inspection OSHA 40 Hour

HAZWOPER

Pile Driving Inspection OSHA 40 Hour

HAZWOPER Trainer

Structures Inspection TASK Traffic

Engineering for Technicians

Aggregate Field Testing XRF Operator

American Heart Asc. First Aid and CPR

References:

Steve Daneke, ACOE Project Engineer, Vance AFB, Enid OK. 405-***-****

Rex Goodnight, ACOE, Kansas City District Office, 816-***-****

John Schwartzbeck, ACOE Project Engineer, McConnell AFB, Wichita KS. 816-

389-3773

Richard 'Dick" Sawyer, ACOE QA McConnell AFB, Wichita KS. 816-***-****

Wes Baker, ACOE QA, Vance AFB, Enid OK. 580-***-****

Bob Bruss, Quality Control and Safety Manager, CSC, Vance AFB, Enid OK. 580-

213-5120

Bob Gudgen, KDOT Area Construction Engineer, Pittsburg KS. 620-***-****

Jerry Greiner, Sr. Project Manager, Kontek Industries, Kansas City KS. 816-

812-9775

Brian Beck, Project Manager, The Ross Group, Tulsa OK. 918-***-****

Alex Wolper, P.E., Encon International, El Paso TX. 915-***-****

Kenny Blaire, President, Cook Flatt & Strobel, Topeka KS. 785-***-****

Armed Forces Reserve Center, Vance AFB, Enid OK

2009 /10

$19.7M 67,000 sq ft Combined Forces Training Building and Organizational

Maintenance Shop

Construction Quality Control Manager

All aspects of Quality Control Management and inspection for

the construction, testing

and commissioning of a 58,946 sq ft 600 member United States

Armed Forces Reserve

Center combined Training Building with Unit Storage and a 8,738

sq ft Organizational

Maintenance Shop. Included but not limited to; reviewing

material submittals for

compliance, review of design build contract drawings and

specifications for conflicts and

missing information, scheduling of quality control activities,

QCS and ProjNet data entry,

prepared and conducted preparatory and initial inspection meetings,

inspected site

demolition, site preparation, contaminated materials remediation,

construction of bio -

retention basins, underground utilities, building structure, concrete and

bituminous

pavement, final grading and landscaping. The first contractor CQCM to use

the new

COE construction management program ProjNet for submittals.

Natural Gas Main Installation and Upgrade, Phase I - DOE Nuclear Weapons

Facility 2008

Pantex, Amarillo Texas

Quality Control Manager, The Ross Group, Tulsa OK

Quality Control and Safety Management for the installation of

seven miles of ten inch

natural gas main and new valve stations to service the

facility. Responsibilities included

but were not limited to inspection of pipe welds, trench

excavation, pipe placement, cover

and backfill, restoration of trench line and disturbed areas

within the easement,

documentation including as-builts, close out submittals and

safety documentation.

Richards - Gebaur, DeCA Commissary Project (Managed by the ACOE )

2007/08

Belton Missouri

Quality Control Manager, Kontek Industries, New Madrid MO.

All aspects of Quality Control Management and inspection for the

construction, testing,

and commissioning of a DeCA Commissary including all below

ground utilities,

building structure and site restoration. Responsibilities included but were

not limited to... creation of entire submittal register, material

submittals, reviewing the contract and

scheduling activities, reviewed plans for possible problems, maintained

equipment logs,

field inspection, all QCS data entry, requested, received, reviewed and

approved material submittals, prepared for and conducted prepatory and

initial inspection meetings,

coordinated safety meetings, maintained as-builts and did all record

keeping.

FAA Airport Project, Taxiway and Taxiway Connectors

2007

Jefferson City Memorial Airport, Jefferson City Missouri

Quality Control, Construction Inspection, Burns & McDonnel, Kansas City

MO.

Quality control and inspection for the construction of new

Taxiway, Connectors and Ramp

improvements. Responsibilities included but were not limited to

coordinating daily activities, scheduled material testing, documented pay

quantities, monitored contractor payroll for compliance, monitored traffic

control, inspected site preparation and all construction

activities, kept field diaries and all other required forms,

maintained as-builts, monitored compliance with FAA requirements, held

weekly meetings with MODOT aviation, city

and airport representatives, the design firm and contractors

representatives.

Sanitary Sewer Lift Station, McConnell Air Force Base

2006

Wichita KS

Quality Control Manager, ECI Construction, Shawnee Mission KS

All aspects of Quality Control Management and inspection for

the construction, testing,

and commissioning of a sanitary sewer lift station including

above and below ground

building structure, the demolition of the existing facility and site

restoration.

Responsibilities included but were not limited to... Reviewing

contract and scheduling construction activities, reviewed plans for

possible problems, coordinated materials testing, logged and submitted test

reports, maintained equipment logs, field inspection, all QCS

data entry, requested, received, reviewed and approved material submittals,

prepared for

and conducted prepatory and initial inspection meetings, coordinated safety

meetings, maintained as-builts, did all record keeping and finaled the

project.

EPA Waterline Enhancement Project:

2004/05

Jasper and Newton Counties, Missouri

Project Manager / Inspector, Tri-State Engineers & Consultants, Joplin

MO

Responsibilities included but not limited to: Inspecting installation of

ductile iron pipe

and PVC pipe water main, construction of lift stations, road

and railroad bores.

Measurement and documentation of pay quantites, daily diaries, materials

tracking,

drawing of as-builts, property restoration and erosion control. Monitored

compliance

with EPA contract requirements.

KDOT Project 166 - 50K - 6388 - 01 Labette County KS

2002/04

Grading, Bituminous Surfacing, Bridge - 246m Continuous Composite Welded

Plate Girder

Project Manager / Inspector / Materials Testing, MKEC Engineers &

Consultants Wichita KS

Responsibilities included all administrative and supervisory duties,

included but not

limited to checking plan quantities, tracking of materials,documentation of

pay quantities, writing material test reports, change orders, daily diaries

and use of the CMS program. Monitored contractor payroll for compliance and

tracked construction trainee's time for

wage increases and completion of training. Supervised and directed daily

activities of

field personnel and coordinated additional manpower needed for larger

concrete pours.

Field work included monitoring of traffic control, inspected construction

of detour,

defined and inspected traffic control for lane closures including temporary

traffic signals, placement of concrete barrier, project signing, and

pavement marking. Inspected site

preparation, demolition of existing structure, compaction of fill,

excavation of drilled

shafts, footings and abutments. Inspected installation of storm water pipe,

drainage inlets,

manholes and flap gates. Inspected the drifting, fit-up and erection of

steel girders.

Established "turn of nut" requirements using DTI's for bolting of the

girder splices.

Checked placement of reinforcing steel and inspected forms and falsework

used in the construction of the sub-structure and super-structure. Observed

concrete placement and

ran field tests. Inspected placement of bituminous pavement, full depth and

overlay.

Monitored compliance with EPA requirements, general and project specific.

Inspected installation of several types of erosion control. Inspected and

monitored use of silt barrier

used around construction area in the river. Inspected temporary and

permanent seeding of project. Inspected permanent traffic control pavement

marking and sign placement.

Inspected installation of guard rail and guard rail end terminals.

KDOT Project 96 - 103 K - 07 Wilson County, KS

2002

Grading, Bituminous Surfacing, RC Box Bridge

Project Manager / Inspector / Materials Testing, MKEC Engineers &

Consultants Wichita KS

KDOT Project 11 U - 1702 - 01 Cherokee County, KS

2001

Grading, PCCP Surfacing, RC Box Bridge

Project Manager / Inspector / Materials Testing, MKEC Engineers &

Consultants, Wichita KS

KDOT Project 160 - 50 K - 7705 - 01 Labette County, KS

2001

Grading, Bituminous Surfacing, RC Box Bridges (2)

Project Manager / Inspector / Materials Testing, MKEC Engineers &

Consultants Wichita KS

Responsibilities included all administrative and supervisory

duties, included but not

limited to checking plan quantities, tracking of materials

documentation of pay quantities,

writing material test reports, change orders, daily diaries and

use of the CMS program.

Monitored contractor payroll for compliance. Supervised and

directed daily activities of

field personnel and coordinated additional manpower needed for

larger concrete pours.

Field work included monitoring traffic control, inspected

construction of detour, defined

and inspected traffic control for lane closures including

temporary traffic signals,

placement of concrete barrier and Inertial Barrier Systems,

project signing and pavement

markings. Inspected site preparation, demolition of existing structures,

compaction of fill, excavation for footings and abutments. Checked

placement of reinforcing steel and

inspected forms and falsework use in the construction of the sub-structure

and super-

structure. Observed concrete placement and ran field tests. Inspected the

placement of full

depth bituminous pavement and checked for smoothness tolerance. Inspected

the removal and replacement of sanitary and storm

water sewer pipe and installation of new manholes. Inspected the

construction of PCCP pavement, curb and gutter, sidewalks, and installation

of metal handrail.Monitored

compliance with EPA requirements and inspected temporary and permanent

seeding and installation of erosion control. Inspected installation of

guard rail and guard rail end

terminals.

City Project, City of Columbus, KS Cherokee County, KS

2000/01

Pool and Water Park

Project Manager / Inspector / Materials Testing, City of Columbus KS

Responsibilities included inspection of site preparation, demolition of

existing structure, excavation for new structure and compaction of fill.

Checked placement of reinforcing

steel and observed concrete placement for pool floor and sidewalls,

sidewalks, deck area, building footings and floor, inspected construction

of pool building and monitored

compliance with ADA requirements. Checked materials for usability and

corrected errors

found in plans. Acted as liason between the design engineer and the

contractor. Prepared

and presented reports to the City Manager and the City Council.

KDOT Project 59 - 50 K - 8117 - 01 Labette County, KS

2000

PCCP Patch, Repair and Grind

Project Manager / Inspector / Materials Testing

KDOT Project 59 - 50 K - 8118 - 01 Neosho County, KS

2000

PCCP Patch, Repair and Grind

Project Manager / Inspector / Materials Testing

KDOT Project 169 - 67 K - 7636 - 01 Neosho County, KS

2000

PCCP Patch, Repair and Grind

Project Manager / Inspector / Materials Testing

Responsibilities included all administrative and supervisory duties,

including but not

limited to; checking plan quantities, tracking of materials, documentation

of pay quantities, writing material test reports, change orders, daily

diaries and use of the CMS program. Monitored contractor payroll for

compliance. Supervised and directed daily activities of

field personnel. Field work included monitoring traffic control, defined

and inspected

traffic control placement for lane closures. Inspected patching and

replacement of PCCP,

ran field tests to verify compliance with requirements. Measured PCCP that

was ground

for pay quantity, two and four lane, gore areas and ramps. Monitored the

sawing and

sealing of pavement joints and random cracks. Inspected the placement of

temporary

striping and permanent pavement markings. Averaged profilograph traces for

smoothness

bonus.

50 C - 3480 - 01 Labette County, KS

1999

Grading and RCB

Project Manager / Inspector / Materials Testing, Cook Flatt & Strobel,

Topeka KS

19 C - 3468 - 01 Crawford County, KS

1999

Grading and Bridge, RC Haunched Slab Span

Project Manager / Inspector / Materials Testing, Cook Flatt & Strobel

50 C - 3479 - 01 Labette County, KS

1999

Grading and Bridge, RC Haunched Slab Span

Project Manager / Inspector / Materials Testing, Cook Flatt & Strobel,

Topeka KS

50 C - 3477 - 01 Labette County, KS

1998

Grading and Bridge, RC Haunched Slab Span

Project Manager / Inspector / Materials Testing, Cook Flatt & Strobel,

Topeka KS

50 C - 3478 - 01 Labette County, KS

1998

Grading and Bridge, RC Haunched Slab Span

Project Manager / Inspector / Materials Testing, Cook Flatt & Strobel,

Topeka KS

Responsibilities included all administrative and supervisory duties,

including but not

limited to; checking plan quantities, tracking of materials, documentation

of pay quantities

Continued next page

writing material test reports, change orders, daily diaries and use of the

CMS program.

Monitored contractor payroll for compliance. Supervised and directed daily

activities

of field personnel and coordinated additional manpower for larger concrete

pours. Field

work included monitoring traffic control, inspection of; site preparation,

demolition of

existing structure, compaction of fill, excavation for footings and

abutments. Checked

placement of reinforcing steel and inspected forms and falsework used in

the construction

of the sub-structure and super-structure. Observed concrete placement and

ran field tests. Inspected installation of guard rail and guard rail end

terminals. Monitored compliance

with EPA requirements and inspected temporary and permanent seeding of

project site

and installation of erosion control.

KDOT Project 95 - 50 K - 7025 - 01 Labette County, KS

1998

PCCP Patch, Repair, and Grind

Project Manager / Inspector / Materials Testing, Cook Flatt & Strobel,

Topeka KS

Responsibilities included all administrative and supervisory duties,

including but not

limited to; checking plan quantities, tracking of materials, documentation

of pay quantities, writing material test reports, change orders, daily

diaries and use of the CMS program. Monitored contractor payroll for

compliance. Field work included monitoring traffic

control, defined and inspected traffic control placement for lane closures.

Inspected

patching and replacement of PCCP, ran field tests to verify compliance with

requirements. Measured PCCP joints, transverse and longitudinal, and random

cracks throughout length

of project for pay quantities. Measured PCCP that was ground for pay

quantity. Monitored

the sawing and sealing of pavement joints and random cracks for pay.

Inspected the

placement of temporary striping and permanent pavement markings. Averaged

profilograph traces for payment of smoothness bonus.

Bituminous Overlay, Lane Widening, addition of Shoulders and construction

of new 1997

pavement for Re-alignment 80 Miles of Highways 59, 96 (now 160), 166 and

169 in

Labette, Montgomery and Neosho Counties, Kansas

Crew Supervisor, Heavy Equipment Operator, Venture Corp. Great Bend KS

Operated all heavy equipment used at the plant site, in the borrow areas,

in the

construction of the shoulders and on the road with the exception of the lay

down machine.

I was involved in every aspect of the project and became a crew supervisor.

This job

provided first hand experience and knowledge of construction from the

contractors side

that has been invaluable in my work as a Quality Control and Project

Manager.