Rodolfo Hutchinson P.E.
Bridge Engineer
**** ********* ***. ***, ******* NC 27617.
abmcht@r.postjobfree.com Phone:
Registrations:
-E.I. Florida Highlights of Experience
-Professional Mr. Hutchinson has five years of balanced experience in
Engineer Construction and Design of Transportation projects and a
in Republic of specialized education in Structural Engineering and
Panama. Computational Mechanics. Mr. Hutchinson's
-P.E. in North responsibilities include bridge and miscellaneous
Carolina structures design and construction engineering and
License #036886. inspection for road, bridges and buildings.
-Asphalt Plant
Tech. Work History
level 1;Final
Estimates T.Y.LIN International. From August 2005 to February
levels 1 & 2; 2010.
Earthwork Job Position: Bridge Designer.
Constr. Inspection
lev.1 GAI Consultants (Internship). From March 2005 to August
(FDOT CTQP trainee 2005
#H325720784300) Job Position: Field Inspector, Structural Designer.
Academic Project Experience
Achievements:
-B.S., Civil Route 220 Bridge and Approaches over NS RR, Henry County
Engineering, Virginia.
Universidad Santa Bridge Designer. Mr. Hutchinson reviewed the
Maria La Antigua, calculations for the steel girders erection (check
Panama, Republic of allowable stresses along the steel girders during the
erection process). Date of Service: 2009. Reference:
Panama. Mrs. Irene Minabe, VP of HR, T.Y. Lin Int., San
-M.S., Structures Francisco CA, 415-***-****.
and
Foundations, UCF. Anacostia riverwalk trail FRP bridges, Washington D.C.
Title of thesis: Bridge Designer. Mr. Hutchinson was responsible for the
Two MSE walls elevations (and quantities) and the design
Dimensional Linear review of the expansion bearings. Date of Service: 2009.
Reference: Mrs. Irene Minabe, VP of HR, T.Y. Lin Int.,
Finite Element San Francisco CA, 415-***-****.
Analysis
of Post-Tensioned New route from SR-1104 (Beach Drive) to NC-211 (2nd
Bridge to Oak Island), Brunswick county, North Carolina.
beams with embedded
Bridge Designer. Mr. Hutchinson reviewed the
elements using calculations of the temporary strongbacks for the
Matlab. haunched prestressed girders. Date of Service:
2009-2010. Reference: Mrs. Irene Minabe, VP of HR, T.Y.
Languages in Lin Int., San Francisco CA, 415-***-****.
Addition to
English: Bridge over the intercoastal waterway and approaches on
-Spanish SR-1172 at Sunset Beach, Brunswick county, North
Carolina.
Civil Engineering Bridge Designer. Mr. Hutchinson reviewed the
Packages: calculations and working drawings of the temporary
SAP 2000, Visual support towers, strongbacks and wind bracings for the
Analysis, CALFEM, haunched prestressed girders. Date of Service:
ATLAS, LARSA, 2009-2010. Reference: Mrs. Irene Minabe, VP of HR, T.Y.
CONSPAN, AutoCAD, Lin Int., San Francisco CA, 415-***-****.
MicroStation, CBA,
GEOPAK, XSTABL,
MDX(mid-level) and Fort Bragg bridges, Cumberland county, North Carolina.
Bridge Designer. Mr. Hutchinson performed the
RC-PIER. verification for the analysis, design and quantities of
the abutments on two simply supported Armored Vehicle
Launched Bridges (AVLB). Mr. Hutchinson was also
Programming responsible for the design of the sheet pile walls. Date
Languages: of Service: 2009-2010. Reference: Mrs. Irene Minabe, VP
MATLAB, MathCAD, of HR, T.Y. Lin Int., San Francisco CA, 415-***-****.
FORTRAN
Soyo-Cabinda transportation link project over the Congo
Membership River, Angola
Member of the UCF Bridge Designer. Mr. Hutchinson participated in the
bridge's preliminary elastic non-linear modeling using
Chapter of the SAP 2000. Different options were analyzed: Suspension,
Society of Cable-Stay and Suspension with counter-stay cables. Date
Hispanic of Service: 2009. Reference: Mrs. Irene Minabe, VP of
Professional HR, T.Y. Lin Int., San Francisco CA, 415-***-****.
Engineers.
RR crossing Bridge over the Presumpscot River,
Cumberland County, Maine. Bridge Designer. Mr.
Hutchinson was responsible for the analysis, design and
quantities of both abutments (each with Geo-foam used as
backfill) and a solid pier wall resting on a footing
(with piles). Mr. Hutchinson was also responsible of
obtaining the top of wall elevations along the MSE
walls. Date of Service: 2009. Reference: Mrs. Irene
Minabe, VP of HR, T.Y. Lin Int., San Francisco CA, (415)
291 3840.
Bridge over Yadkin River (U.S. 158), Davie/Forsyth
County, N.C.
Bridge Designer. Mr. Hutchinson was responsible for the
material quantities (End Bents, Superstructure and
Approach Slabs); Camber-Defection on Superstructure;
construction elevations; bottom of slab elevations;
design review on all bents (cap, columns and drilled
piers); design of anchor plates on a sheet pile anchored
wall; calculation review for the stresses along the
prestressed girders during the deck pouring sequence.
Date of Service: 2008-2010. Reference: Mrs. Irene
Minabe, VP of HR, T.Y. Lin Int., San Francisco CA, (415)
291 3840.
RDU Terminal C Expansion, Raleigh, North Carolina
Civil Designer. Mr. Hutchinson performed a soil slope
stability analysis during the construction phase. Date
of Service: 2008. Reference: Mrs. Irene Minabe, VP of
HR, T.Y. Lin Int., San Francisco CA, 415-***-****.
Queue Jump, Lee County DOT, Florida
Bridge Designer. Mr. Hutchinson was responsible for the
design of the shear stud connector's; and also
determining the camber-deflection along the steel box
girders. Date of Service: 2008. Reference: Mrs. Irene
Minabe, VP of HR, T.Y. Lin Int., San Francisco CA, (415)
291 3840.
Olmsted Dam Project, Olmsted, Illinois
Civil Designer. Mr. Hutchinson performed the analysis
and design for the temporary formwork and shoring of two
reinforced concrete shells. Date of Service: 2008.
Reference: Mrs. Irene Minabe, VP of HR, T.Y. Lin Int.,
San Francisco CA, 415-***-****.
Longwood University Bridges, Farmville, Virginia
Bridge Designer. Mr. Hutchinson was responsible for the
analysis and design of the abutments and wing walls of a
simple span steel truss vehicular bridge. Date of
Service: 2008. Reference: Mrs. Irene Minabe, VP of HR,
T.Y. Lin Int., San Francisco CA, 415-***-****.
X-2B Fayetteville Bypass Flyover, Cumberland County,
North Carolina
Bridge Designer. Mr. Hutchinson was responsible for the
Substructure Analysis (Bent Caps, Columns and Footings);
Camber- Defection on Superstructure; Shear Connector &
Tension Zones along steel girders; Construction
Elevations along the superstructure and the Material
Quantities on Superstructure, Substructure and Approach
Slabs. Date of Service: 2008. Ref.: Mrs. Irene Minabe,
VP of HR, T.Y. Lin Int., San Francisco CA, (415) 291
3840.
Alico & Pennsylvania Road, Lee County DOT, Florida
Civil Designer. Mr. Hutchinson was responsible for
performing the analysis for three traffic signs
foundation. Date of Service: 2008. Reference: Mrs. Irene
Minabe, VP of HR, T.Y. Lin Int., San Francisco CA, (415)
291 3840.
SR-84 Signal Foundation, Collier County DOT, Florida
Civil Designer. Mr. Hutchinson was responsible for
performing the analysis for a traffic sign foundation.
Date of Service: 2008. Reference: Mrs. Irene Minabe, VP
of HR, T.Y. Lin Int., San Francisco CA, 415-***-****.
Burn Store Road, Lee County DOT, Florida
Bridge Designer. Mr. Hutchinson was responsible for
creating the plan elevation and typical section
preliminary drawings of three bridges over water with
integral abutments using MicroStation. Mr. Hutchinson
also performed the preliminary structural analysis using
CONSPAN and LARSA. Date of Service: 2007. Reference:
Mrs. Irene Minabe, VP of HR, T.Y. Lin Int., San
Francisco CA, 415-***-****.
SR 528 PD&E, FDOT District Five, Florida
Bridge Designer. Mr. Hutchinson was responsible for
creating the plan elevation and typical section
preliminary drawings using MicroStation. Date of
Service: 2006. Reference: Mrs. Irene Minabe, VP of HR,
T.Y. Lin Int., San Francisco CA, 415-***-****.
Alico Road/I-75 Interchange, FDOT District One, Lee
County, Florida
Field Inspector. This $31 million reconstruction of I-75
at Alico Road Interchange in Lee County consisted of
bridge replacement, new on and off ramps, drainage
improvements, signals, lighting, and landscaping. Mr.
Hutchinson was responsible for the inspection and
preparation of field reports of roadwork construction.
Mr. Hutchinson was also responsible for the computation
of the weekly and monthly final estimates. Dates of
Service: 2006-Nov.2007. Reference: Mr. Vince Zaliauskas
P.E., HighSpans Engineering Inc., Ft. Myers FL, (239)
433 3000.
SC-Buttonwood Signal Foundation, Lee County DOT, Florida
Civil Designer. Mr. Hutchinson was responsible for
performing the analysis for a traffic sign foundation.
Date of Service: 2005. Reference: Mrs. Irene Minabe, VP
of HR, T.Y. Lin Int., San Francisco CA, 415-***-****.
SR 826/836 Interchange (Palmetto Expressway/Dolphin
Expressway Interchange), FDOT District Six, Miami,
Florida
Bridge Designer. This project consisted of four bridges
with minor curve over SR826 mainline, canal, auxiliary
ramp and one 200-foot radius bridge over NW 12th Street,
designed to fit into the heart of the interchange. Mr.
Hutchinson was responsible for performing a linear
elastic finite element analysis of steel Bridge 26 using
LARSA. He created a Math-Cad sheet for the field splice
design on steel Bridge 20. Mr. Hutchinson also provided
the steel girder's elevations of both bridges using
GEO-PAK. Date of Service: 2005. Reference: Mrs. Irene
Minabe, VP of HR, T.Y. Lin Int., San Francisco CA, (415)
291 3840
Plantation Road Extension, Lee County DOT, Florida
Civil Designer. Mr. Hutchinson was responsible for the
estimation of total pavement area along Plantation road.
Date of Service: 2005. Reference: Mrs. Irene Minabe, VP
of HR, T.Y. Lin Int., San Francisco CA, 415-***-****.
Del Prado Extension Corridor Study, Lee County DOT,
Florida
Bridge Designer. Mr. Hutchinson was responsible for
creating the preliminary drawings of PC/PS Beam typical
cross sections using MicroStation. Date of Service:
2005. Reference: Mrs. Irene Minabe, VP of HR, T.Y. Lin
Int., San Francisco CA, 415-***-****.
Hurricane Wilma, FDOT District One, Florida
Field Inspector. Mr. Hutchinson was responsible for
providing assistance for the inspection and preparation
of field reports, debris cleanup and sign repair after
damages along FDOT roads (US-41) and highways (I-75)
from hurricane Wilma. Date of Service: 2005. Reference:
Mrs. Irene Minabe, VP of HR, T.Y. Lin Int., San
Francisco CA, 415-***-****.
Summerlin Road Six-Laning, CEI, Lee County DOT, Lee
County, Florida
Field Inspector. Mr. Hutchinson was responsible for the
inspection and preparation of field reports of roadwork
construction. He was also responsible for the
inspection of pavement, sidewalk and curb placement. He
performed the mast arm foundation analysis and
verification of three mast arm traffic signs located at
the intersection of San Carlos and Summerlin Roads.
Dates of Service: 2005-2006. Reference: Mrs. Irene
Minabe, VP of HR, T.Y. Lin Int., San Francisco CA, (415)
291 3840.
Holidays Orlando Resort Condominiums, Orange County,
Florida
Field Inspector. This project included PS/PC beams and
slabs, as well as CIP concrete. Mr. Hutchinson was
responsible for the inspection of the Holidays Orlando
Resort Condominiums located at International Drive,
Orange County Florida. Date of Service: 2005.
Reference: Robert Bee P.E., GAI Consultants, Orlando
FL., 407-***-****.