Qualifications Experience

** ***** ************ ****** ************ Co. West Sacramento,

management experience California (2001-Present)

Flexible - ability to Water/Wastewater Construction

successfully adapt to Project Manager

challenging environments Responsibilities: Construction management to ensure

Effective working alone projects are completed on-time and within budget.

and as a cooperative team Includes estimating, scope review, quantity

member take-offs, solicitation of subcontractors and

Self motivated and goal vendors for pricing, bid scope coordination between

oriented trades and vendors, project safety and quality

Strong organizational control. Contract administration duties including

skills purchase order and service agreement management,

submittal and RFI processing, change order

Education management, monthly progress billing, scheduling,

California State budgets and cost control, communication and

University of Fresno, coordination with owner, design engineer,

Fresno, California inspectors, subcontractors and vendors and final

BS, Construction contract close-out documentation and coordination.

Management, School of

Engineering Projects: New construction and plant upgrades of

water/wastewater treatment plants, pump stations and

Computer Skills related structures.

Microsoft Office (Word,

Excel, Outlook) and Activated Sludge Process Improvements (Wastewater),

Internet Antioch, CA

Primavera SureTrak Client: Delta Diablo Sanitation District, Contract

Microsoft Project Value: $3.7M; Plant upgrade consisting of the

Expedition removal and replacement of four (4) Secondary

Clarifier sludge mechanisms, three (3) RAS pumps and

Training four (4) trickling filter mechanisms, along with

Association of General 32,000 CF of trickling filter media, site piping,

Contractors: Leadership grading and paving of new access driveway.

in Construction SSWD Fluoridation Project (Water), Sacramento, CA

SDC & Associates: Client: Sacramento Suburban Water District, Contract

Proving, Pricing & Value: $2.1M; Project consisted of adding fluoride

Defending Delay Claims stations to twenty-seven (27) well sites within the

American Trainco: Pumps & water district. Work involved site piping, concrete

Pump Systems foundations and installation of FRP buildings, which

World of Concrete: housed fluoride chemical tanks, chemical injection

Increasing Jobsite and electrical/instrumentation equipment for remote

Productivity and monitoring and control of well sites.

Practical Planning and Cypress Lakes Projects (Wastewater & Water), Oakley,

Schedule of Small and CA

Medium Size Construction Client: Shea Homes, Contract Value: $3.8M

Projects Lift Stations - New construction of three (3) sewer

Competent Person Training lift stations within the subdivision development,

in Trenching and consisting of dewatering, deep excavation work, 25

Excavations ft. deep wet wells, pre-packaged pump stations,

Lorman Education precast concrete vaults, site piping, grading and

Services: Managing paving, electrical and instrumentation and a masonry

Construction Projects in control building, which housed a standby generator

California and control panels.

Certified 10-Hour OSHA Water Pump Station - New construction consisting of

Training in Construction installing pump equipment, hydro-pneumatic tank,

Safety & Health site piping, grading and paving, along with a

Certified in Adult CPR masonry building, which housed piping, chemical

metering equipment, electrical and instrumentation

equipment.

HOA Pump Station - New construction consisting of a

masonry building which housed pumps and electrical

control equipment, used to control the water level

for the lake within the subdivision development,

site piping, grading and paving.

CCCSD Protective Coatings, Ph. III (Wastewater),

Martinez, CA

Client: Central Contra Costa Sanitation District,

Contract Value: $1.4M; Project consisted of the

removal and replacement of the protective paint

coatings on four (4) clarifier sludge mechanisms,

new cathodic protection at clarifiers, crack repair

in four (4) aeration basins, new protective covers

over portion of aeration basin, misc. piping removal

and replacement. In addition, miscellaneous removal

and reinstallation of equipment for the new

protective coatings and crack repair work.

CCCSD Pipe Renovation, Ph. II (Wastewater),

Martinez, CA

Client: Central Contra Costa Sanitation District,

Contract Value: $920K; Plant upgrade consisting of

the removal and replacement of various piping

systems on-site, ranging from " to 60" diameter

piping, valves and supports at ten (10) project

locations within the treatment plant.

CCCSD Protective Coatings, Ph. II (Wastewater),

Martinez, CA

Client: Central Contra Costa Sanitation District,

Contract Value: $1.2M; Plant upgrade consisting of

the removal and replacement of the protective paint

coatings on four (4) clarifier sludge mechanisms,

new cathodic protection at clarifiers, crack repair

in four (4) aeration basins, miscellaneous piping

removal and replacement and the installation of a

new air gap tank and control equipment. In addition,

miscellaneous removal and reinstallation of

equipment for the new protective coatings and crack

repair work.

Largo WWTP - Bridgeway Lakes (Wastewater), W.

Sacramento, CA

Client: Meritage Homes, Contract Value: $1.8M;

Construction of new sewage lift station within the

Bridgeway Lakes subdivision development, consisting

of sheet pile shoring, dewatering, deep excavation

work, 30 ft. deep concrete wet well, pre-packaged

pump station, stand-by generator, site piping,

grading and paving, masonry perimeter wall and

masonry building for electrical controls and

instrumentation.

Richmond WWTP Improvements (Wastewater), Richmond,

CA

Client: Violia Services, Contract Value: $2.6M;

Upgrade to existing Digester Tanks, Sedimentation

Tank and Headwork's. Digester Tank work consisting

of demolition of two (2) 110 ft. diameter steel

covers, miscellaneous concrete, piping and valves.

Installation of new digester mixing piping, valves,

pumps and concrete pads. Sedimentation Basin work

consisting of removal and replacement of elevated

concrete decks, handrailing and sludge processing

equipment. Headwork's structure consisting of new

gantry crane and steel framework, bar screen

equipment and new lift pumps.

Lincoln WWTP Improvements (Wastewater), Lincoln, CA

Client: Del Webb, Contract Value: $500K; Upgrade to

existing treatment plant consisting of new concrete

foundations for chemical tanks and pre-fabricated

chemical control building, installation of chemical

treatment metering, mixing and monitoring equipment.

New discharge structure at remote creek and

installation of various size sluice gates.

Moore Road Well Site (Water), Lincoln, CA

Client: Del Webb, Contract Value: $840K;

Construction of new potable water well site for

future subdivision development, consisting of

masonry building for well pump, electrical controls

and instrumentation, chemical treatment equipment.

Installation of hydro-pneumatic tank, site piping,

grading and paving site work.

Bridgeway Island Pump Station (Wastewater), W.

Sacramento, CA

Client: Frank Andrews Development, Contract Value:

$1.5M; Construction of new sewage lift station

within the Bridgeway Island subdivision, consisting

of sheet pile shoring, dewatering, deep excavation

work, 30 ft. deep concrete wet well, pre-packaged

pump station, site piping, grading and paving and

masonry building for electrical controls and

instrumentation.

Environmental Golf (Division of Valley Crest

Industries) Calabasas, California (1998-2001)

Golf Course Construction

Project Engineer

Responsibilities: Worked with project managers,

superintendents and foreman performing construction

management. Managed labor, materials and equipment

on new golf course construction and remodels.

Responsible for tracking construction progress,

production of crews and tracking project budget.

Communication and coordination with subcontractors

and vendors. Assisted with project estimating,

quantity take-offs and coordination of new projects.

Projects:

Red Rock Country Club, Las Vegas, NV.

New 18-hole course within new subdivision

development.

Indian Ridge Country Club, Palm Desert, CA

New 9-hole course within existing subdivision

development

Poplar Creek Golf Course, San Mateo, CA

Existing 18-hole public course remodel for the City

of San Mateo.

Blackhawk Country Club, Danville, CA

Existing18-hole course remodel within existing

subdivision development.

Frank Schipper Construction Co. Santa Barbara,

California (1996-1998)

General Building

Project Manager

Responsibilities: Worked with project

superintendents performing construction management

of multiple sized projects ranging from new

construction, tenant improvements, seismic upgrades

and restoration projects. Responsible for change

order management, submittal and RFI processing,

monthly progress billings and construction

schedules. Also served as company Safety Officer.

Projects: Partial List

Santa Barbara Cemetery - New Mausoleum and Ern

Garden

Goleta Presbyterian Church - Tenant improvements and

addition

Santa Barbara Blood Bank - Tenant improvements and

addition

Lobero Theatre - Seismic upgrade and restoration

Territory Ahead - Tenant improvement to clothing

outlet retail facility and corporate headquarters

Glen Annie Golf Course - Club House and Pro Shop

Goleta Wastewater Treatment Plant - Tenant

Improvements to controls and operation building

R.P. Richards Construction Co. Goleta, California

(1994-1996)

General Building

Project Engineer, Health and Safety Officer, took

over as Project Manager and Quality Control Manager,

Responsibilities: General Contractor performing

state and federal construction projects.

Construction management duties included project

buyout and contract negotiation for various trades

and vendors, change order management and RFI and

submittal processing. Assisted and coordinated

subcontractor work on site. Provided field

correspondence to owner, subcontractors and vendors.

Performed day-to-day government required paperwork.

Planned and conducted weekly tailgate and jobsite

safety meetings. Performed quantity take-offs for

on-site work. Developed project punchlist and

completed project as-built's for project completion.

Project:

Enlisted Barracks, Fort Irwin, CA

New three (3) story, 64 unit barracks building and

recreation center for the US Army Corps of

Engineers.