Qualifications Experience
** ***** ************ ****** ************ Co. West Sacramento,
management experience California (2001-Present)
Flexible - ability to Water/Wastewater Construction
successfully adapt to Project Manager
challenging environments Responsibilities: Construction management to ensure
Effective working alone projects are completed on-time and within budget.
and as a cooperative team Includes estimating, scope review, quantity
member take-offs, solicitation of subcontractors and
Self motivated and goal vendors for pricing, bid scope coordination between
oriented trades and vendors, project safety and quality
Strong organizational control. Contract administration duties including
skills purchase order and service agreement management,
submittal and RFI processing, change order
Education management, monthly progress billing, scheduling,
California State budgets and cost control, communication and
University of Fresno, coordination with owner, design engineer,
Fresno, California inspectors, subcontractors and vendors and final
BS, Construction contract close-out documentation and coordination.
Management, School of
Engineering Projects: New construction and plant upgrades of
water/wastewater treatment plants, pump stations and
Computer Skills related structures.
Microsoft Office (Word,
Excel, Outlook) and Activated Sludge Process Improvements (Wastewater),
Internet Antioch, CA
Primavera SureTrak Client: Delta Diablo Sanitation District, Contract
Microsoft Project Value: $3.7M; Plant upgrade consisting of the
Expedition removal and replacement of four (4) Secondary
Clarifier sludge mechanisms, three (3) RAS pumps and
Training four (4) trickling filter mechanisms, along with
Association of General 32,000 CF of trickling filter media, site piping,
Contractors: Leadership grading and paving of new access driveway.
in Construction SSWD Fluoridation Project (Water), Sacramento, CA
SDC & Associates: Client: Sacramento Suburban Water District, Contract
Proving, Pricing & Value: $2.1M; Project consisted of adding fluoride
Defending Delay Claims stations to twenty-seven (27) well sites within the
American Trainco: Pumps & water district. Work involved site piping, concrete
Pump Systems foundations and installation of FRP buildings, which
World of Concrete: housed fluoride chemical tanks, chemical injection
Increasing Jobsite and electrical/instrumentation equipment for remote
Productivity and monitoring and control of well sites.
Practical Planning and Cypress Lakes Projects (Wastewater & Water), Oakley,
Schedule of Small and CA
Medium Size Construction Client: Shea Homes, Contract Value: $3.8M
Projects Lift Stations - New construction of three (3) sewer
Competent Person Training lift stations within the subdivision development,
in Trenching and consisting of dewatering, deep excavation work, 25
Excavations ft. deep wet wells, pre-packaged pump stations,
Lorman Education precast concrete vaults, site piping, grading and
Services: Managing paving, electrical and instrumentation and a masonry
Construction Projects in control building, which housed a standby generator
California and control panels.
Certified 10-Hour OSHA Water Pump Station - New construction consisting of
Training in Construction installing pump equipment, hydro-pneumatic tank,
Safety & Health site piping, grading and paving, along with a
Certified in Adult CPR masonry building, which housed piping, chemical
metering equipment, electrical and instrumentation
equipment.
HOA Pump Station - New construction consisting of a
masonry building which housed pumps and electrical
control equipment, used to control the water level
for the lake within the subdivision development,
site piping, grading and paving.
CCCSD Protective Coatings, Ph. III (Wastewater),
Martinez, CA
Client: Central Contra Costa Sanitation District,
Contract Value: $1.4M; Project consisted of the
removal and replacement of the protective paint
coatings on four (4) clarifier sludge mechanisms,
new cathodic protection at clarifiers, crack repair
in four (4) aeration basins, new protective covers
over portion of aeration basin, misc. piping removal
and replacement. In addition, miscellaneous removal
and reinstallation of equipment for the new
protective coatings and crack repair work.
CCCSD Pipe Renovation, Ph. II (Wastewater),
Martinez, CA
Client: Central Contra Costa Sanitation District,
Contract Value: $920K; Plant upgrade consisting of
the removal and replacement of various piping
systems on-site, ranging from " to 60" diameter
piping, valves and supports at ten (10) project
locations within the treatment plant.
CCCSD Protective Coatings, Ph. II (Wastewater),
Martinez, CA
Client: Central Contra Costa Sanitation District,
Contract Value: $1.2M; Plant upgrade consisting of
the removal and replacement of the protective paint
coatings on four (4) clarifier sludge mechanisms,
new cathodic protection at clarifiers, crack repair
in four (4) aeration basins, miscellaneous piping
removal and replacement and the installation of a
new air gap tank and control equipment. In addition,
miscellaneous removal and reinstallation of
equipment for the new protective coatings and crack
repair work.
Largo WWTP - Bridgeway Lakes (Wastewater), W.
Sacramento, CA
Client: Meritage Homes, Contract Value: $1.8M;
Construction of new sewage lift station within the
Bridgeway Lakes subdivision development, consisting
of sheet pile shoring, dewatering, deep excavation
work, 30 ft. deep concrete wet well, pre-packaged
pump station, stand-by generator, site piping,
grading and paving, masonry perimeter wall and
masonry building for electrical controls and
instrumentation.
Richmond WWTP Improvements (Wastewater), Richmond,
CA
Client: Violia Services, Contract Value: $2.6M;
Upgrade to existing Digester Tanks, Sedimentation
Tank and Headwork's. Digester Tank work consisting
of demolition of two (2) 110 ft. diameter steel
covers, miscellaneous concrete, piping and valves.
Installation of new digester mixing piping, valves,
pumps and concrete pads. Sedimentation Basin work
consisting of removal and replacement of elevated
concrete decks, handrailing and sludge processing
equipment. Headwork's structure consisting of new
gantry crane and steel framework, bar screen
equipment and new lift pumps.
Lincoln WWTP Improvements (Wastewater), Lincoln, CA
Client: Del Webb, Contract Value: $500K; Upgrade to
existing treatment plant consisting of new concrete
foundations for chemical tanks and pre-fabricated
chemical control building, installation of chemical
treatment metering, mixing and monitoring equipment.
New discharge structure at remote creek and
installation of various size sluice gates.
Moore Road Well Site (Water), Lincoln, CA
Client: Del Webb, Contract Value: $840K;
Construction of new potable water well site for
future subdivision development, consisting of
masonry building for well pump, electrical controls
and instrumentation, chemical treatment equipment.
Installation of hydro-pneumatic tank, site piping,
grading and paving site work.
Bridgeway Island Pump Station (Wastewater), W.
Sacramento, CA
Client: Frank Andrews Development, Contract Value:
$1.5M; Construction of new sewage lift station
within the Bridgeway Island subdivision, consisting
of sheet pile shoring, dewatering, deep excavation
work, 30 ft. deep concrete wet well, pre-packaged
pump station, site piping, grading and paving and
masonry building for electrical controls and
instrumentation.
Environmental Golf (Division of Valley Crest
Industries) Calabasas, California (1998-2001)
Golf Course Construction
Project Engineer
Responsibilities: Worked with project managers,
superintendents and foreman performing construction
management. Managed labor, materials and equipment
on new golf course construction and remodels.
Responsible for tracking construction progress,
production of crews and tracking project budget.
Communication and coordination with subcontractors
and vendors. Assisted with project estimating,
quantity take-offs and coordination of new projects.
Projects:
Red Rock Country Club, Las Vegas, NV.
New 18-hole course within new subdivision
development.
Indian Ridge Country Club, Palm Desert, CA
New 9-hole course within existing subdivision
development
Poplar Creek Golf Course, San Mateo, CA
Existing 18-hole public course remodel for the City
of San Mateo.
Blackhawk Country Club, Danville, CA
Existing18-hole course remodel within existing
subdivision development.
Frank Schipper Construction Co. Santa Barbara,
California (1996-1998)
General Building
Project Manager
Responsibilities: Worked with project
superintendents performing construction management
of multiple sized projects ranging from new
construction, tenant improvements, seismic upgrades
and restoration projects. Responsible for change
order management, submittal and RFI processing,
monthly progress billings and construction
schedules. Also served as company Safety Officer.
Projects: Partial List
Santa Barbara Cemetery - New Mausoleum and Ern
Garden
Goleta Presbyterian Church - Tenant improvements and
addition
Santa Barbara Blood Bank - Tenant improvements and
addition
Lobero Theatre - Seismic upgrade and restoration
Territory Ahead - Tenant improvement to clothing
outlet retail facility and corporate headquarters
Glen Annie Golf Course - Club House and Pro Shop
Goleta Wastewater Treatment Plant - Tenant
Improvements to controls and operation building
R.P. Richards Construction Co. Goleta, California
(1994-1996)
General Building
Project Engineer, Health and Safety Officer, took
over as Project Manager and Quality Control Manager,
Responsibilities: General Contractor performing
state and federal construction projects.
Construction management duties included project
buyout and contract negotiation for various trades
and vendors, change order management and RFI and
submittal processing. Assisted and coordinated
subcontractor work on site. Provided field
correspondence to owner, subcontractors and vendors.
Performed day-to-day government required paperwork.
Planned and conducted weekly tailgate and jobsite
safety meetings. Performed quantity take-offs for
on-site work. Developed project punchlist and
completed project as-built's for project completion.
Project:
Enlisted Barracks, Fort Irwin, CA
New three (3) story, 64 unit barracks building and
recreation center for the US Army Corps of
Engineers.