Stephen Webb Cormack
**** ****** **** ****** **** 205-***-****
Birmingham, Alabama 35244 abmawe@r.postjobfree.com Cell 205-***-****
Vice President / General Manager / Director
Reliability Engineering . Supply Chain Management ( Operations
Manufacturing-Distribution-Consulting
. Reliability Engineering . Maintenance Management .
Operations Management
. Supply Chain Management . Process Improvement . P&L
Responsibility
. Maintenance Repair & Operating Supplies (MRO) Procurement,
Application, and Repair
. Applied Design and Implementation of Industrial Power Transmission
Equipment
. Hands-on Operational Experience across extensive range of industries,
from Pharmaceutical (validated cGMP environments), Food & Beverage, Oil &
Gas to Discrete Manufacturing, Pulp and Paper, Petrochemical, Facilities,
and Utilities
Strategic and hands-on executive with broad experience developing,
justifying, and championing strategies that propel operational and business
optimization and growth with full project management oversight from
conceptual development and scope definition to implementation planning,
execution, and final delivery.
Catalyst for understanding outages and 'pain' within an organization-then
conducting comprehensive assessments that identify root causes and enable
development of targeted solutions that systemically correct problems and
provide sustainable results. Consistently produce such salient deliverables
as:
. Standardized methodologies for knowledge transfer to clients' staff
. Return-on-investment analysis, tracking, and reporting
. MRO Supply Chain Management techniques and tools
Exceptional functional and process background in core industrial areas of
Production, Inventory Control, Logistics, Reliability, Maintenance, MRO
Supply Chain, Business Process Design, and Improvement and Asset Life Cycle
Management.
Professional Experience & Achievements
MRO RELIABILITY SERVICES, INC., Birmingham, AL 2006-Present
As Management Consultant, provide independent consulting in reliability
engineering/supply chain management.
GENESIS TECHNOLOGY SOLUTIONS, INC., Ridgefield, CT Jan. 2010-Present
$20M global provider of industrial asset management practices, systems, and
consulting services to Fortune 100 companies in such industries as
pharmaceutical, energy, utility, oil and gas, wastewater treatment, pulp
and paper.
Lead Supply Chain Consultant/Reliability Engineer
Selected to deliver a complete asset optimization solution for a major off-
shore oil & gas operator, enhancing maintenance and repair operations on
their Floating Production, Storage and Offloading (FPSO) Vessels located in
the North Sea.
. Spare Parts Identification: Implemented comprehensive changes to the
spare parts management program where all critical spare parts were
identified, documented, and qualified for add-to-stocks to improve
Overall Equipment Effectiveness (OEE). Positioned company to improve
maintenance wrench-time over 5% the first year while reducing
operational costs in excess of $1.1M.
. Commodity Channel Management: Leveraged core commodity groups in
collaboration with principal suppliers and service providers and
developed Channel Management Program; projected first-year MRO
acquisition cost savings of $1.0M with similar reductions anticipated
each of the next 2 years.
. Work Flow Process Improvement/Team Building: Introduced new processes
and training that optimized operations (Planning & Scheduling,
Reliability Centered Maintenance, Inventory Management Strategies,
Stephen Webb Cormack Home 205-***-**** ( Cell 205-***-**** (
abmawe@r.postjobfree.com
GENESIS TECHNOLOGY SOLUTIONS, INC., Supply Chain Consultant/Project Lead
(cont'd.)
Preventive & Predictive Maintenance). Built on existing maintenance
reporting to create a "few" maintenance KPIs to drive EAM system
utilization up and MRO/maintenance costs down.
GENESIS TECHNOLOGY SOLUTIONS, INC., Ridgefield, CT
Aug. 2009-Dec 2009
Business Process Consultant
Chosen to lead an inventory and process improvement initiative for three
paper mills. Scope included the design, implementation and execution of a
program to reduce excess MRO spare part inventory; projected $80-$90
million worth of spare parts across customer network.
. Process Development/Product Planning: Consistently drove process
improvements and coached critical staff to execute systematic knowledge
transfer.
GENESIS TECHNOLOGY SOLUTIONS, INC., Ridgefield, CT
Feb. 2009-May 2009
Lead Reliability Engineer/Project Lead
Selected to develop work-flow maintenance management strategies,
reliability engineering/maintenance job planning concepts, and
inventory/spare parts list for a clinical manufacturing and packaging
pharmaceutical facility.
. Leadership/Process Development: Defined roles and responsibilities for
preventive maintenance strategies and their associated job guides
impacting assets required for commissioning and validation.
FLUOR CORPORATION, Irving, TX Aug. 2008-Jan 2009
Fluor is a $16.7B Fortune 150 company delivering global engineering,
procurement, construction, maintenance, and project management services to
diverse clientele and governments across 6 continents.
Lean Supply Chain Consultant
Provided key direction on lean supply chain initiative for a steam
generated power plant. Scope included Product Life Cycle Management;
projected first year spend of $9M.
. Process Development/Product Planning: Introduced new processes and
training that optimized operations (Materials Management, Supply Chain
Development, Preventive Maintenance, 5S, and Lean Transformation).
GENESIS TECHNOLOGY SOLUTIONS, INC., Ridgefield, CT Feb. 2006-July 2008
Lead Reliability Engineer/Project Lead
Recruited by lead partner to direct maintenance reliability effort for
global pharmaceutical under an FDA warning letter and at risk of having a
plant that generated $8B/year shut down.
. Leadership/Process Development: Spearheaded multiyear project,
implementing full reliability program for large manufacturing/packaging
plant at global pharmaceutical company; managed 4 direct reports.
Improved equipment uptime by 31% while reducing operational costs in
excess of 15%.
. Process Planning: Leveraged core organizational strengths in
collaboration with principal partner and developed Reliability Life
Cycle Asset Management Program; projected first-year revenue is $4M with
30% growth anticipated each of the next 5 years.
. Process Improvement/Team Building: Introduced new processes and
training that optimized operations (Failure Modes & Effects Analysis,
Reliability Centered Maintenance, Root Cause Failure Analysis,
Preventive/Predictive Maintenance Strategies, and Master Lube Plan).
Stephen Webb Cormack Home 205-***-**** ( Cell 205-***-**** (
abmawe@r.postjobfree.com
MOTION INDUSTRIES, Birmingham, AL 1981-2006
Wholly owned subsidiary of Genuine Parts Co. (NAPA automotive replacement
parts, industrial replacement parts, office products, and
electrical/electronic materials) with net sales in 2007 exceeding $3B.
Corporate Sales Manager, Services Group: Southeast/Southwest Divisional
Sales, 2005-2006
Promoted to manage sales and lead new business initiatives for such
strategic accounts as Duracell, Fuji Film, Tyson Foods, and Graphic
Packaging with revenue stream exceeding $700M from 2 divisions.
. Led RFQ Team Responses/Major Accounts: Accelerated growth within key
accounts by driving integration among information systems, product
support, corporate accounts, engineering services, and operations.
Process Improvement Manager, 1996-2005
Tapped for advancement into role directing development and implementation
of asset management and supply chain management programs.
. Key Project Management/Execution: Over 10-year timeframe, instrumental
to expert planning and implementation of numerous programs producing
significant, sustainable results. Select examples:
o Oversaw Integration Site Management (annual sales: $45M).
o Launched Gap Analysis/Asset optimization ... implemented
Strategic Sourcing and supply chain redesign (consolidated MRO
supply base, reduced costs, and increased cycle times with
channel MRO suppliers) ... instituted and managed multiyear
integrated supply agreements.
. Consulting Services Oversight: Managed consulting services for asset and
supply chain management (ROS 8% annually).
Branch Manager, 1990-1996; Outside Sales Representative, 1985-1990; Inside
Sales Representative, 1981-1985
. Business Development: As Branch Mgr., developed $7.1M in annual revenues
for So-Central Kentucky area.
Education & Professional Development
Bachelor of Arts, Business Administration, University of Montevallo,
Montevallo, AL 1981
Trained Subject-Matter Expert (SME), Industrial Power Transmission - 16
years' applied experience with broad expertise in mechanical, electrical,
and fluid power transmission.
Maintenance Management Software Training, Maximo, SAP / PM
Extra Curricular Activities include golf and tennis (College Level)
Stephen Webb Cormack Home 205-***-**** ( Cell 205-***-**** (
abmawe@r.postjobfree.com
Performance Indicators & Drivers
Key Values: My Corporate Leaders on Steve Cormack...
Perspective...
Steve understands the principles of guiding,
I am highly driven. When directing, motivating, and influencing others.
issues come up, they get He possesses very effective analytical and
addressed. I want to take problem-solving skills. He takes and encourages
the challenges in an appropriate risk and practices situational
organization that are leadership. He establishes credibility to
difficult to do and positively influence others and prioritizes
accomplish those things. decisions based on company goals and
strategies. - Partner, Genesis Solutions
A good leader should have
four characteristics: Be Steve has a participative and inclusive
able to effectively motivate management style and possesses strong project
(critical leadership) ... management skills. He discusses issues as a
train (coaching and team to arrive at a solution and gets staff
mentoring staff) ... members' buy-in on decisions. - Profile
re-train (fill Consultant, HGW Consulting
organizational process gaps)
and replace (effect The combination of [Steve's] understanding of
turnarounds). branch operations with his knowledge of
information systems and processes has made the
I am the go-to person with difference successfully impacting this program
operational issues and (valued at $25-$30M annually). He has displayed
processes. I have positively a great deal of patience and diligence as we
impacted operations across have pursued this excellent opportunity. I am
the board because of my pleased with our progress and consider Steve's
ability to communicate efforts to be vital to our success. - Branch
effectively with diverse Manager, Motion Industries, regarding program
staff. initiated with Burlington Northern Santa Fe
Railroad
KEY INITIATIVES & RESULTS
Supply Chain Management and Principal Contact/Senior Consultant,
Enterprise Asset Management Motion Business Solutions
Projects
Challeng Address clients' business priorities in 4 critical areas: Improve
e plant uptime (production) with existing assets ... Improve plant
storeroom operations and inventory management ... Implement
maintenance process improvement ... Deliver appropriate technology
support for storage management and maintenance management.
Action Planned and executed plant-/enterprise-wide assessments, identified
problems, and delivered solutions that added evergreen value to
Motion's customer base (conducted nearly 200 assessments over
10-year period). Consistently addressed four core business
processes: MRO Supply Chain (stores, suppliers, work processes),
Maintenance (strategy, process, practices), CMMS/EAM Systems
(selection, implementation, interfaces, support), and Data
Management (equipment, MRO inventory, benchmarking).
Result Improved work processes/plant efficiency, leveraged extended
enterprise (suppliers), yielded better maintenance/operating
performance, and improved customers' ROAA 8%.
Analysis Exceptional expertise in managing operational issues, providing
practical solutions, and driving tactical and strategic planning.
Solving problems for companies is my greatest capability.
Stephen Webb Cormack Home 205-***-**** ( Cell 205-***-**** (
abmawe@r.postjobfree.com
Strategic Planning & Process Project Lead, Asset Optimization -
Development Continental Tire
Challeng Customer's pain stemmed from production equipment downtime caused
e by MRO spare part availability and lack of planned maintenance
management practices. Operational costs were negatively impacted
with excessive inventory levels occurring throughout enterprise.
Action Identified project components (MRO supply process improvement,
storeroom operations reorganization, data verification, maintenance
process enhancement). Developed/tested alternative solutions,
secured approvals through collaboration/decision making, and
oversaw implementation.
Result Reduced asset base/cost, improved work processes and plant
efficiency, leveraged extended enterprise, produced optimal
maintenance and operating performance, improved ROAA 8%, and
reduced inventory levels $1.25M in first year.
Analysis Processes and results were repeatable throughout customer's global
enterprise. I am able to 'peel the onion back' relative to
customer's business process and develop working models to
positively impact operational performance.
Team Building & Process Principal Consultant, Reliability
Development Centered Maintenance, Genesis Solutions
Challeng Hired to lead maintenance reliability effort for global
e pharmaceutical under an FDA warning-with threat of shutting down
plant generating $8B in sales annually.
Action Implemented full reliability program for manufacturing/packaging
operations. Conducted Failure Modes & Effects Analysis on selected
critical equipment and trained site Reliability Centered
Maintenance engineers in troubleshooting critical equipment through
Root Cause Failure Analysis. Spearheaded enhancement of preventive
maintenance job plans, built/enhanced BOMs, and identified
components to support site reliability program.
Result FDA retracted warning letter, thus $8B business was preserved.
Project improved manufacturing and packaging equipment uptime by
31% while reducing operational costs 15%+.
Analysis Transformed organization by implementing change management program
that addressed cultural and behavior changes needed to implement
reliability program. I effectively leverage key skills in training,
coaching, and mentoring to execute systematic knowledge transfer.
Tactical Planning & Problem Business Solutions Manager - Motion
Solving Industries
Challeng To provide clients with correct identification and accurate,
e searchable content from multiple vendors that seamlessly integrates
with their enterprise applications.
Action Defined and created methodologies for catalog content management
programs. Built custom data base systems for client base, ensuring
consistent catalog content data for single/multi-plant locations.
Result Created new revenue stream for Motion while removing customer
roadblocks to conducting electronic commerce with their supply
base.
Analysis Optimize ability to transport/control interaction and flow of
information-maximizing power of e-commerce. I am able to
consistently innovate technological solutions to business
challenges.
Supply Chain Management Supply Chain Consultant,
M&M Mars, Nestle USA, Unilever, Tropicana
Challeng Effectively address universal problems in production and packaging
e equipment downtime, excessive inventory levels, and slippage
throughout enterprise.
Action Evaluated, spearheaded, and streamlined inventory of indirect goods
for multiple integration programs for M&M Mars ($12.4M), Nestle USA
($3M), Unilever ($3.5M), and Tropicana ($7M). Established goals,
implemented training, prioritized events, and supervised execution.
Result Achieved significantly improved ROAA in each location-reduced
inventory levels and improved uptime production rates.
Analysis I am able to lead operations to world-class performance, exceed
management expectations (i.e., earned Best in Class and Best
Practices for Tropicana), and produce exemplary results for
clients.