Specific Experience
PRINCIPLE SPECIALIST, COST CONTROL, Procter & Gamble, Bear River City, UT
(May 2009- Present)
Managed both cost and scheduling functions for a $359MM grassroots paper
facility. Utilized Primavera P6 and Microsoft Project scheduling software
to develop and mange the construction schedule and start-up/commissioning
schedule. Produced monthly cost reports using JD Edwards as well as client
specified cost reports. Presented both cost and scheduling on weekly and
monthly basis both internally and to clients.
SENIOR PROJECT CONTROLS LEAD, Wink Companies, Baton Rouge, LA
(May 2007 - March 2009)
Directed project controls team for the largest single project in Wink
Companies history. Responsible for the scheduling, change management, cost
analysis and projections. Oversaw the work effort and deliverables for 4
project controls specialists. Provided cost, performance, productivity and
scheduling reports on a weekly, biweekly and monthly basis. Prepared
monthly high-level management presentation for all aspects of the project.
Utilized ICARUS estimating software, Primavera 3.1 and 6.1, Microsoft
Office Applications and Dynamics SL.
PROJECT CONTROLS SPECIALIST, The Shaw Group, Baton Rouge, LA.
(January 2006- April 2007)
Responsible for all estimating, cost control and planning/scheduling for
maintenance and small cap projects at a chemical plant; utilized Primavera
for scheduling; Responsible for cost projections for maintenance backlog
lists for 6 units; Scheduled and planned maintenance backlog for 6 units;
Updated and maintained both cost data as well as scheduling data. Utilized
SAP Procurement and Accounting Modules, Primavera 3.1, JD Edwards Cost and
Accounting software.
PROJECT MANAGER, James Construction Group, Baton Rouge, LA,
(January 2005-January 2006)
Estimate, plan, schedule, manage all aspects of earthwork and gypsum work
project for clients ranging from Louisiana to Florida, provided cost
management, vendor invoices, client billings, interact with the client on a
regular basis to ensure satisfaction with quality and timeliness of
projects. Utilized Heavy Bid (HCSS) estimating and cost control software,
Primavera 3.1 and Microsoft Projects scheduling software.
COST ENGINEER, Jacobs Engineering, Indianapolis, IN,
(February 2003-January 2005)
Responsible for Cost Analysis, Forecasting and Reporting for 2 $100+MM
projects at a pharmaceutical plant; Maintained Change Order Status as well
as provided Change Order Forecasting; Helped establish standard cost codes
for client to use across all projects; used Prolog software extensively in
projecting and reporting of costs; Developed and maintained subcontract
status reports; extensive SAP experience in both forecasting and reporting
to client. Utilized Primavera 3.1 scheduling software for developing the
initial project schedule.
PLANNING, SCHEDULING AND COST CONTROL MANAGER, Volks Constructors,
Prairieville, LA, (December 2001-January 2003)
Developed and managed planning, scheduling and cost control department,
built and updated manpower loaded schedules, took lead in pre-job meetings
and in development of master construction plan, monitored cost reports,
presented department presentation to clients. Used Microsoft Projects as
well as Primavera 3 to develop schedules. Developed within Microsoft Access
the Cost Control system to help 3 separate accounting systems to be pulled
together into one tool.
PROJECT MANAGER/ ESTIMATOR, Volks Constructors, Prairieville, LA,
(January 2001-December 2001)
Attended site visit meeting with clients, performed quantity take-off of
piping, civil, structural steel, pile driving, and marine applications;
produced entire estimate proposal for submission to client, performed
project manager duties on awarded projects, monitored productivity,
invoiced clients, approved subcontractor and vendor billings, responsible
for cost allocations within company, acted as liaison between client and
company, provided manpower loaded schedules and bi-weekly updated
schedules. Utilized Timberline estimating software to develop turnkey
estimates and Primavera and Microsoft Project software to develop
schedules.
PROJECT ESTIMATOR, Industrial Design and Construction, Prairieville, LA,
(June 1998-January 2001)
Attended site visit meeting with clients, performed quantity take-off of
piping, civil, and structural steel; produced entire proposal for
submission to client, answered client questions about clarifications, built
manpower loaded schedules
EDUCATION
LOUISIANA STATE UNIVERSITY, Baton Rouge, LA, MAY 2001
Bachelor of Science, Major: Construction Management
GPA in Major: 3.6
Related courses: Accounting, Economics, Management, Finance, Engineering
Academic Research: "Effective Project Control Through Project Management"
ADDITIONAL EXPERIENCE
- 3 years of SAP experience
- Heavy Bid (HCSS) estimating and cost control software
- Primavera 3.1 and 6.1 scheduling software
- Prolog
- JD Edwards
- Timberline Estimating software
- Aspen Icarus Estimating software
Microsoft Office Applications (Excel, Access, Powerpoint, etc.)
Academic Research: "Effective Project Control Through Project Management"
ACTIVITIES
Served a two-year mission for The Church of Jesus Christ of Latter-day
Saints, monitored the missionary service of 150 missionaries
Permanent: 17254 Trinidad Dr. Prairieville, A 70769 225-***-****
*********@*****.***