VICTOR I. MARTINEZ
Ashburn, VA 20147-5605
Residence: 703-***-**** Mobile: 703-***-**** Email:
abm7k6@r.postjobfree.com
Summary
A highly motivated operations and project manager with plant management and
supply chain experience. A multi cultural manager with a successful track
record in safety, team building, lean manufacturing, material management,
quality, and continuous improvements activities focused on customer
satisfaction and flawless business plan execution
PROFESSIONAL EXPERIENCE
Remy Power Products Jan 02- July 09
Remy Power Products is the leading remanufacture and supplier of automotive
electrical rotating equipment to both retail outlets and installers. With
sales of $300 million RPP is a wholly own business unit of Remy
International Inc.
Corporate Project Manager, OPEX Group, Winchester, VA Jan 09-
July 09
The OPEX (Operational Excellence) group is responsible for the
development, implementation and management of continuous improvements
and lean six sigma initiatives throughout the Remy Power Products
operations in Mexico and US.
Accomplishments:
. Responsible for financial and risk analysis of $700,000 cost reduction
initiatives involving the insource and re allocation of previously
outsourced production among three Mexican and one US operations.
Distribution Center Manager, Winchester, VA Sept
08- Jan 09
Provide cost effective and on time shipments to customers of 2.5 million
finished goods and 3.0 million cores from Winchester Distribution
employing 200 in a 140,000 sq ft building. Managed the internal project
designed to bring operation to cost effective levels by realigning
distribution logistics and customers.
Accomplishments:
. Relocated the core and recovery group to Mexico freeing up 70,000 sq-
ft of space for rent, reduced headcount by 120. Project completed
without affecting customer shipments and on time to book $500,000
restructuring entry in balance sheet.
. Re-layout of warehouse and consolidated distribution operations in 30%
less space than original. Re set stock locations accessibility to
match order frequency and minimize travel.
Distribution Center Manager, Edmond, OK Dec
07 - Sept 08
Manage distribution center operations with a $7 million labor budget and
shipping to major automotive retailers 3.5 million finished goods per
year at a sale value of $180 million and employing over 250 in a 500,000
sq ft building.
Accomplishment:
. Freed up 300, 000 sq of space for rent out of a 500,000 sq ft
building.
. Established a robust energy conservation program that reduced
consumption by 20%
. Refocus operations in distribution. Remove and transfer non
distribution operations to Mexico resulting in a headcount reduction
of 40.
Manager Mississippi Remanufacturing, Raleigh, MS Dec 06-
Dec 07
Loaned by Company Sr. VP of Operations to Heavy Duty Group of Remy, Inc for
one year to assume responsibility for all the operational and cost
reduction activities in the remanufacturing Domestic Heavy Duty Starters
and Alternators in three separate Mississippi plants and facilitate the
transfer and sell of business to Caterpillar.
Manager Mississippi Remanufacturing (cont)
Accomplishments:
. Maintained operational integrity while downsizing a work force of 400
with sales of $100 million.
. Successfully manage the transfer and sale of three facilities in one
year without affecting customer deliveries or quality and to the
satisfaction of new owners.
. Organized volunteer team of workers to support CAT training
requirements in Nuevo Laredo, Mexico.
Plant Manager, Culpeper, VA Dec 02- Dec 06
The Culpeper plant is unique, as it's located inside a Virginia Department
of Corrections facility with 220 inmates and 14 Remy staff shipping over
600,000 domestic and import automotive starters per year. Manage the
business relationship between Remy and Dept of Corrections. Responsible for
operation inventory levels and P& L results.
Accomplishments:
. Led the Lean implementation team which resulted in production
increases of over 30% (420,000 units to 620,000) in one year without
adding manpower.
. Established a Kanban production scheduling system that resulted in
finished goods inventory reduction of $850,000 in eight month.
. Reached and maintained production delivery rates of 98% and reduced
WIP inventory from 8hrs to1hr by applying lean manufacturing
techniques (VSM, one piece flow, etc) across product lines.
. Implemented a Jidoka based "Quality at the Source" program empowering
operators to stop production and eliminate defects which resulted in
improving final test pass rate from 93.32% to 99.38%.
Production Manager - Import Alternators Group. Chantilly, VA Jan 02 -
Dec02
Manage and coordinate the on time production of over 100, 000 units per
year of small order quantity, multi change over operation required in the
remanufacturing 200 different automotive alternators part numbers
originally manufactured by Mitsubishi, Hitachi, Nippondenso, and Bosh.
Accomplishments:
. Implemented lean manufacturing methods across product families. Reduce
tooling changeover from 30 minutes to 5 minutes.
. Establish a simplified production scheduling system that brought
product deliveries in line with customer demand. Increased the build
to schedule performance to 98% from 90%
Messier Services / Dowty Aerospace, Sterling, Virginia 1994-2001
Messier is a French company leader in the manufacturing of landing gears
and hydraulics for Airbus, corporate and military aviation clients. In 1998
Messier purchased the Dowty's landing gear and aviation hydraulics
businesses.
Company Engineering and Materials Manager 1998-2001
Responsible for company supply chain with annual material purchases of $13
million and inventories of $8 million and engineering activities supporting
$40 million dollars in landing gear and hydraulic products sales.
Accomplishments:
. Met increase demand requirements with same inventory levels
($8million) by optimizing the acquisition and delivery of foreign
purchase components and materials.
. Enhanced engineering efficiency by establishing electronic technical
data systems which made possible to handle increased work load without
adding engineers at a saving of over $180,000 per year.
Messier Services/Dowty (cont)
Operations Manager - Landing Gears Group 1994-1998
Direct the Engineering, Production, Purchasing, Maintenance, and Customer
Service functions for the Landing Gear Division with $32 million in sales
and 160 people.
Accomplishments:
. Reduced production time from 65 days to 35 days by implementing lean
manufacturing processes, setting operations standards and eliminating
capacity bottlenecks such as grinding.
. Turn around group profit margins from $1.5 million loss to $2.4
million profit in two years.
Sundstrand Aerospace/ Westinghouse Electric 1992-1994
Sundstrand (now a United Technology Co.) is the world leader in the
manufacturing of aviation electrical generators, controls and mechanical
drives systems. In 1992 Sundstrand purchased the Aerospace business from
Westinghouse Electric.
Plant Manager, Lima, Ohio 1992-1994
Responsible for Budgets, Production, Customer Service, and Quality Control
of a FAA regulated facility that remanufactured and overhauled aviation
electrical generators and control systems for clients that included major
airlines and the U.S. Air Force. Responsible for operation inventory levels
and P& L results.
Accomplishments:
. Relocated the physical plant from Los Angeles to Ohio ahead of plan
by one month, in budget and without adversely effecting customer
deliveries.
. Directed the value stream mapping, equipment layout and lean design of
the new facility reducing production space by 30%.
Plant Manager, Los Angeles and Miami Aerospace Service Center 1987-
1992
Responsible for managing Production, Supply Chain, Customer Service, and
Quality Control for FAA regulated facilities dedicated to remanufactured
electrical generators and control systems for clients that included major
airlines and the U.S. Air Force. Responsible for operation inventory levels
and P& L results.
Accomplishments:
. Organized and directed technical and production activities required in
supporting the introduction to customers of the new technologically
advanced Variable Speed Constant Frequency aircraft generator.
. Maintained high moral and employee's commitment to customer service
during business acquisition period.
. Establish in the Miami plant a "Quality Edge" inspection system
resulting in the reduction of customers return from 10% to less than
1%.
. Returned the Miami operation to profitability in a year.
EDUCATION & TRAINING
Louisiana State University - Baton Rouge, LA
BS Industrial Engineering
Lean Enterprise Institute- Brookline, MA
Value Stream Mapping, Continuous Flow, Lean Applications
Westinghouse Electric Educational Center- Pittsburgh, PA
Finance and Business Management Courses
TECHNICAL ESPERTISE
Lean Manufacturing, ISO 9000, OSHA Standards, FAA Regulations, EPA
Regulations, Microsoft Office Suite, QAD, Bi lingual ( English- Spanish)