Paul K. Hofmeyer, MBA
319-***-****(C)
abm62x@r.postjobfree.com
Iowa City, Iowa 52246 QUALIFICATIONS SUMMARY
Engineering professional with management experience. Skilled in problem
solving, process improvement, technical writing, and project management.
Acumen in team building, leadership, Lean methodologies, Six-Sigma, and
critical thinking. Strong management skills resulted in success with cross-
functional teams and on-time, well-executed projects. Ability to see the
big picture and deliver in an organization.
AREAS OF EXPERTISE
Data Driven Leadership Critical Thinking Cross-Functional Teams
Cost-Benefit Analysis Presentation Skills Process Improvement
Adaptability Interpersonal Skills Technical Writing
Engineering Project Management Problem Solving
Liaison Operations Management Team Player
PROFESSIONAL EXPERIENCE
Project Manager / Manager / Buyer 2008-2009
Terex USA, LLC Cedar Rapids, Iowa
Go to person for a changing work environment with responsibilities ranging
from the transition of mobile rock crusher manufacturing from Northern
Ireland to Cedar Rapids, managing process engineering group, and managing
final assembly of product. Established supply base for outsourcing large
castings while negotiating improved costs.
Supervisor 2007-2008
Terex USA, LLC Cedar Rapids, Iowa
Immediate impact in final assembly shop floor team, determining overtime,
and expediting parts shortages, while maintaining a safe work environment.
Shop floor lean leader reducing floor space requirements, improving work
flow, improving customer delivery, and enhancing individual talents.
Delivered $5 million prototype equipment launch on time with regular
meetings across the organization and detailed project management.
Product / Process Engineer 1998-2007
Pella Corporation Pella, Iowa
Responsible for safety and quality improvements, product and process
design, and vendor relations. Managed projects with savings over $1
million. Led teams in conversion of processes, equipment upgrades,
capacity improvements, and product upgrades. Led Kaizen teams improving
product designs, enhancing processes, and increasing capacity and improving
customer satisfaction through quality enhancements. Developed quality
standards for product and processes using ANOVA, FMEA's and implementing
process controls. Qualified equipment with capabilities of 1.4 CpK and
above.
Facility Engineer / Management Operations Trainee 1995-1998
Caterpillar Inc Mapleton, Illinois
Engineer responsible for three shift operations of Core Room. Developed
innovative, specialized sulfur dioxide / nitrogen blending system.
Designed and improved existing manufacturing and quality systems for new
products. Managed sub-contractor activities. Reduced losses and minimized
future risk due to improper filling of bulk resin tank, without loss of
production or increased overtime. Oversaw the operation of the head mold
line while coordinating with maintenance to improve productivity by 25%.
Junior Engineer 1994-1995
Mims Engineering Huntsville, Alabama
Consulting engineer responsible for conducting energy audits, designing
HVAC systems, and writing and editing technical reports and grant
applications.
SELECTED ACHIEVEMENTS
MANAGE PROJECTS
. Transitioned manufacturing of overseas production of mobile rock
crusher to Cedar Rapids facility. Resulted in on time and within cost
estimates transition of equipment valued at $400,000 each.
. Led team in conversion of part hangers for custom color painting
process. Resulted in a 12% increase in paint yield, 18% capacity
improvement, 27% improvement in ergonomics and an unexpected savings
of $260,000.
. Managed implementation of new coating and upgraded process equipment
for the Carroll, Iowa, Pella Corporation facility. Resulted in annual
savings of $900,000 and decreased environmental hazards.
TEAM LEADER AND DECISION FACILITATOR
. Assumed project lead for implementation of CNC machining centers and
equipment modifications. Resulted in successful implementation of
$1,000,000 equipment after project floundered for months.
. Asked to lead a safety team because of concerns with pedestrian
traffic and the increasing industrial vehicle traffic in a 1 million
square foot facility. Resulted in improved visibility and increased
safety for both pedestrians and vehicles.
COORDINATED TEAMS
. Designed and developed SO2 / N2 system requirements and installation
needs. Resulted in improvement of system reliability, blend ratio, a
cost savings, and a decrease in environmental hazards associated with
gaseous SO2.
. Coordinated over 70 equipment modifications with corporate engineering
for casement size change. Resulted in on time and on budget
implementation.
. Developed plan to maximize flexibility and minimize overall system
cost. Resulted in early implementation of double hung strategic size
project resulting in an additional $50,000 cash flow.
EDUCATION
Master of Business Administration, 2002
University of Iowa
Iowa City, Iowa
Bachelor of Science, Mechanical Engineering, 1995
University of Alabama - Huntsville
Huntsville, Alabama