Mark Teegarden
H: 865-***-****
Maryville, Tennessee 37803 abm4la@r.postjobfree.com
C: 865-***-****
Senior Level Distribution / Logistics Professional
Emphasis on improved productivity, service levels, and cost reduction
Seasoned operations executive with extensive experience in both high
tech and traditional logistics environments. Track record for success
in turnaround and start-up projects streamlining operations and
maximizing productivity. Exceptionally strong team building skills. A
resourceful decision maker that combines strong leadership and
organizational skills with the ability to direct high level business
affairs.
Core Competencies:
. Certified Six Sigma Green Belt and Lean Six Sigma
. Infrastructure design, production maximization, and cutting edge
process and procedures
. Logistics network design and optimization
. Union/Non-union labor environments
. Capital / operating budgeting, and financial / cost controls.
. Long term strategic development and leadership of complex capital
investment projects.
. Freight negotiations and establishing freight consolidation
infrastructures.
. Sourcing, purchasing, quality assurance, warehousing, distribution,
inventory control.
. Team building, human resources development, labor relations, and
organizational change management, subordinate development
. Proficient in WMS and TMS configuration/implementation
. Operations/capital project management
PROFESSIONAL EXPERIENCE
Sanford Corporation
Distribution Center Manager, Mexicali, Mexico
February 2010 to Present
. Responsible for all activities related to distribution,
transportation, and manufacturing support
. Responsible for inventory control and cycle counting on $46 million
inventory
. Responsible for MRO purchasing with $600,000 annual budget
Distribution Center Manager, Maryville, Tennessee November 2006
to February 2010
Hired to turnaround/manage the Maryville, Tennessee Distribution Center
(DC). The DC is a 465k ft2, 24/7 operation with 49 dock doors. On hand
inventory is $32MM consisting of 2,100 skus. The DC is attached to a 215k
ft2 plastics injection and extrusion molding manufacturing facility. There
are also 4 outside storage facilities. One outside storage is a shipping
point while the others are strictly storage of excess and obsolete product.
Total square footage is 865k ft2. Staffing includes 3 managers, 6
supervisors, 11 administrative support and 155 associates. The DC went live
with SAP October 1st, 2008.
. Delivered over $1 million in productivity/cost savings initiatives two
consecutive years
. After six months of initiating process improvements and spend
controls, the DC achieved a favorable status versus total expense
estimate.
. Assumed operation responsibility for two outside shipping facilities
terminating the services of a third party logistics company. Annual
savings are $105k.
. Reorganized receiving operations changing from a 24/7 to a 20/4
operation. Annual savings are $674k.
. Reorganization of shipping operations in Q1 '08 resulted in annual
savings of $331k.
. Initiated inventory reprofiling project in the forward pick area
utilizing cube, weight, and velocity data to enhance pick pallet
construction and reduce order selector travel. Annual savings are
$171k.
. Reengineered the forward pick replenishment process from reactive to
proactive through the use daily historical sku picking queries.
Annual savings are $170k.
. Assumed responsibility for the site industrial batteries charging and
changing station. Site assets include 126 pieces of industrial
equipment to include stand up, double deep reach trucks, stand up
forklifts, sit down forklifts, double pallet transporters, and
tuggers. All equipment is utilized 24/7. Redesigned and reengineered
the processes resulted in $103 annual savings.
. Eliminated 40 trailers from the shuttle and storage trailer pool.
Annual savings are $48k
. Moved import container operations from outside storage facility to
primary facility. Annual savings are $76k.
BBA Fiberweb, Old Hickory, Tennessee April
2005 to August 2006
Distribution and Logistics Consultant
Engaged by the company to evaluate the performance of their 3PL provider
for distribution and dedicated shuttle services and make recommendations to
maintain, replace, or in-source those services. Ninety day assessment
contract extended 18 months.
. Developed RFP for three alternate 3PL providers for distribution services
and three dedicated shuttle service providers. As a result of the
evaluation, the company followed recommendation to terminate contract
with current 3PL. The current 3PL had been their provider for 18 years.
The contract was valued at nearly $3 million annually. The company
followed recommendation to ultimately in-source their distribution and
shuttle service.
. Company renewed my contract to facilitate transition of distribution and
shuttle operations to company control.
. Expanded scope of contract to evaluate outbound transportation services
to include TL, LTL, and expedited service.
. Developed RFP to renegotiate all carrier contracts. Annual
transportation expenditure was $7 million annually. First month actual
savings $16k. Full year savings are $190k. Also developed freight
savings matrix whereby 3% of freight expense, above negotiated rate, is
passed to customer with estimated savings of $200k. Also developed EDI
program for freight payment program. There is an estimated 2 person
reduction in accounts payable with projected savings of $52k.
. Phase 2 of the project will be to evaluate outbound expedited, inbound
domestic, and ocean freight.
. Lead a JIT project for the manufacturing operation. There is an
estimated 2 person headcount reduction and 20k ft2 reduction in product
staging area.
. Developed and implemented a comprehensive cycle count program designed to
eliminate their annual physical inventory. Labor savings to eliminate
annual physical inventory are $25k. The cycle count program will be
implemented at all other BBA facilities.
. Developed long-term technology road map to include bar code and RF
technology in conjunction with vendor compliance campaign.
. Evaluated current pallet rack storage system for effectiveness and
safety. Received $670k capital grant to replace and expand entire rack
system. Six Sigma Green belt project to reconfigure rack system to match
inventory profile resulted in 20% increased storage capacity.
. With the newly designed rack system, it was necessary to replace the
entire fleet of material handling equipment - 28 pieces including
forklifts with regular and extended forks and various sized rug poles,
clamp trucks and stand up lifts.
. Requested and received $164k for facility upgrades including DC
ventilation, dock seals, and office upgrades.
. Reprofiling the inventory to facilitate grouping of like items and taking
advantage of high velocity product. The original velocity analysis
indicated that BBA had a classic 80/20 inventory profile.
. Identified and disposed of over $500k of obsolete or damaged inventory.
. Opened lines of communication and became liaison for all BBA internal and
external customers.
. Participated and conducted/sponsored numerous Kaizen events at BBA.
. Performed numerous process mapping sessions to include cycle counting,
returns, order processing / invoicing.
. Removed 20 leased trailers from the storage and shuttle trailer pool
resulting in $96,000 annual savings.
Perry Ellis International, Waynesboro, South Carolina
2004 to 2005
Director of Distribution
Full responsibility for the redesign of physical layout of the distribution
center, all internal processes, storage configuration, and repair labor
relations. Full responsibility for development of P&L. Manage 10 exempt
and 240 associates. Operation is all apparel, each pick, shipping to
wholesale and retail customers. 18k skus, 9 SBUs, shipping 14 million units
annually.
. Operations assessment produced strategic plan consisting of 8 major
capital and process projects. Requested and received $1.3MM to execute
. Initiated numerous changes to functionality in Warehouse Management
System (WMS) including case level receiving, RF replenishment tasking, RF
picking, cycle counting. Also changed pick process from pick and pack to
pick and ship netting a 12 headcount reduction.
. Vendor bar code compliance initiative implemented insuring 100% vendor
compliance.
. Universal product packaging initiative developed and implemented
streamlining receiving, replenishment, and picking.
. Initiated second shift - replenishment, receiving, and cycle counting
. Increased order capacity by 60%, overall receiving capacity increased by
40%.
. Operational upgrades resulted in headcount reduction estimated at $683k
annual savings.
GENESCO Inc., Lebanon, Tenessee
2001 to 2003
General Manager
Recruited by the company's executive search firm and challenged to design
and build a state of the art distribution center. Full responsibility for
design, construction, and bringing fully automated, 320k ft2. distribution
center (DC) on-line in one year. Full responsibility for development of
P&L, planning and management of all business operations. Manage 7 direct
and 275 indirect reports.
. Responsible for construction of new DC to include site selection,
negotiations with state for $750k in development grants, construction of
state road, coordination of utilities into site and coordination with the
Tennessee Department of Environmental Control.
. Also responsible for design of building and material handling design that
included 2 miles of automated diverting conveyor and 3 multi-level pick
modules.
. Developed new Warehouse Management System (WMS) and processes controlling
flow and storage of product.
. Distributed product to over 600 retail stores domestically and
internationally in addition to web based sales.
. Full RF capabilities throughout facility covering all functions.
. Vendor bar code compliance initiative implemented insuring 100% vendor
compliance.
. Order accuracy rate of 99.6%.
. Utilized 8 3PL consolidation points to facilitate freight savings.
. DC project appeared as cover story, "Warehouse of the Month" in trade
magazine "Modern Materials Handling", also featured stories in "Inbound
Logistics" and "Retail Distribution trade magazines.
. Since opening, UPH increased 63%, labor cost per unit decreased 47%, and
total expense cost as a percentage of sales decreased 37%.
WORLD KITCHEN, INC., Monee, IL. 1999 to
2001
Director of Distribution
Recruited by executive search firm to turnaround labor relations and
distribution operations with the ultimate goal of building a new DC to
consolidate distribution operations. Full responsibility for P&L and
establishing viable distribution capabilities and provide company with
confidence to invest in new, state of the art DC. Initial emphasis on
establishing productive labor relations in a hostile union environment,
establishing open lines of communication with DC and company's internal
business units, and developing sound operational processes.
. Managed 3 primary DCs with 3 outside storage facilities, 3 DC managers,
11 supervisors, and 120 DC associates in Illinois and Ohio. Total DC
operations were 580k square feet.
. Effective and productive labor relations established within 4 months,
operations turnaround executed in 6 months.
. Responsible for design, construction, and execution of 700k ft2 state of
the art DC to consolidate all distribution operations.
. Fully automated DC with integrated RF technology brought on-line in 1
year of inception. DC was brought on-line with new WMS and SAP
enterprise software simultaneously. Complete consolidation and full
shipping capabilities established 30 days after start-up.
. Reslotting of inventory resulted in 2 day reduction in order cycle time.
. Full P&L responsibility for freight negotiations and 3PL utilization.
. First year and on-going savings of $2.5M.
CREATIVE EXPRESSIONS GROUP, Indianapolis, IN.
1995 to 1999
Distribution Center Manager
. Managed 690,000 ft2 facility.
. $23 million finished goods inventory.
. 5 direct and 215 indirect reports on 2 shifts.
. Full P&L responsibility for freight and 3PL negotiations. Converted 3
independent distribution operating divisions to one national account
resulting over $500k the savings first year. Also implemented zone
skipping for small parcel delivery.
. Reclaimed outside kitting process from outside contractor resulting in
$78k annual savings.
PARAMOUNT PUBLISHING, Indianapolis, IN. 1991 to
1995
Operations Manger 1993 - 1995
. Managed all replenishment, order filling, and shipping operations in new,
state of the art, 500k ft2 DC.
. Implemented new WMS and Transportation module.
Distribution Center Manger 1991 -1993
. Managed 350k ft2 DC before distribution operations consolidated in 1993.
. 4 exempt and 210 associates on 2 shifts.
. Union decertified after 3 years of leadership as DC manager.
. Developed, implemented, and maintained engineered work measurement
system. DC productivity increased 43% in first year of implementation
resulting in $500k annual labor savings.
. Full P&L responsibility for all freight and 3PL negotiations. Utilized
up to 10 3PL consolidators across the country depending on seasonal
volume. Also initiated zone skipping for small parcel delivery resulting
in $350k annual shipping cost savings.