Jeff Greer

815-***-****

******@*****.***

An accomplished professional in operations, engineering, design,

installation, maintenance and field service of one of a kind automated

equipment.

Proven record of innovative leadership, driven by values, dedicated to a

diverse workforce, and committed to providing a positive and safe work

environment.

Professional Highlights

. As a Controls Engineer I have created over 100 fully detailed electrical

packages, and programs utilizing AutoCad2008. This included full BOM's,

UL compliant schematics, wiring diagrams, piping diagrams and termination

layouts. Complete PLC, HMI, and Servo programming.

. As a project manager I was tasked with identifying new equipment

failures. After a thorough analysis of the equipment. I changed and

reprogrammed the control system and HMI, developed a skid plate

assembly and worked with the mechanical engineers to design a new sweep

arm assembly. This machine upgrade also included 4 new servos. Upon

completion, production was increased by 45%, quality and reliability were

increased, and labor was reduced by 20%.

. Designed a floating point integer program that allowed for multiple set

point parameters from a single position input. This allowed for over 200

deposits per minute from a single encoder.

. Designed a ratio control program that maintained exact portioning of up

to 12 different products in a multi-conveyor blending application.

. Designed a variable exhaust and air make up system that maintained

approximately 29.5 CFM for each EDM in a confined space machine shop.

. Lead, managed, serviced and installed custom manufactured equipment

utilizing engineering principles. This included placement, commissioning,

and field service of high speed automated machinery to customers locally,

nationally or internationally.

. Simultaneously managed $100 MM in capital projects in one year for

multiple frozen food clients. The scope of these projects included

generating RFQ/RFP's, selecting and testing multiple pieces of equipment.

Issuing purchase orders, negotiating terms and conditions, and tracking

results.

. Assisted sales department in justifying customer expenditures of capital

equipment, calculating ROI, and promoted new technology within the

packaging industry. Worked with engineering and production teams to

ensure timely execution of customer's projects. Reported project

progress to CEO, and scheduled design review meetings with customers.

Accurately determine realistic lead times for the customer's objectives

and goals.

. Improved reputation and delivery of a custom machinery manufacturer in

the packaging industry. This was achieved by implementing new scheduling

methods. Managing material lead times with vendors. Developing and

managing the production schedule for labor, material, equipment and sub-

contractors. Provided detailed goals and bench marks for all departments.

Initiated purchase requisitions, and identifying vendors who could

perform on a on-time basis.

. Creating detailed technical manuals which included every aspect of

machinery operation including installation, set-up, start-up, trouble-

shooting and preventative maintenance schedules. Additionally these

manuals contained lubrication standards, fluid levels, and spare parts

lists.

Jeff Greer

Work History

High-Speed Solutions - Operations/Engineering: September 2002 - Present

Design, layout, program and build complete electrical packages for custom

packaging equipment.

Programming and Service of PLC's including: Allen-Bradley, Siemens,

Moeller, Idec, Tolo-matic, Red Lion, B&R Automation, Reliance, and Control

Techniques. Repair, and install industrial machinery and custom

equipment. T/S+R Temperature controls, PID loops. Selecting and servicing

pneumatic and hydraulic systems.

Colborne Corp. Controls Engineer: August 1998 - September 2002

Lay-out, design and select components for complete control systems. Select

appropriate PLC platform, HMI(s), VFD(s), motors, and drives. Provide a

complete bill of materials. Generate RFQ(s). Discuss system compliance and

capabilities with vendors. Layout and select appropriate sizing for

control panels and junction boxes. Provide complete drawing package

including ladder logic program, full schematics, panel lay-out, wiring

diagrams, specification sheets, and tech manuals for machine operation.

Set-up, and commission machinery at customer locations. Train and test

customer personnel. Turned equipment over to end users.

Three Phase Electric - Electrical Lead Man: July 1995 - August 1998

Trouble-Shoot and repair. Commercial, Industrial: lighting, power,

communications and automated systems.

Lay-out and install new electrical feeds. service upgrades, and switchgear

installations.

T/S+R AC/DC drives and motor controls. Service machine shop equipment.

Perform preventative maintenance on facilities and equipment. Investigate

and identify electrical problems and perform component level corrective

maintenance as required. Identify customer needs and quote new

installations and upgrades accordingly.

McGuire Electric - Superintendent: September 1993 - July 1995

Plan and develop systems and procedures to improve the operating quality

and efficiency of the departments. Supervise and assign personnel to

department required projects. Work with sales to properly quote and manage

projects. Complete on-site surveys to ensure quality installations. Work

with customers to identify their needs and requirements. Conduct

interviews, hire new staff, and provide employee orientation. Assist staff

to resolve complex or out of policy operation problems.

Arlington Mills - Maintenance Manager: August 1989 - September 1993

Responsible for department planning and budgets. Ensure department

compliance with governing authorities. Plan environmental health and

safety training for plant personnel. Work with production manager to

schedule required maintenance. Responsible for upkeep and maintenance of

facility. Implement department programs. Conduct daily department

meetings. Supervise and assign department personnel. Assist floor

personnel when required.

U.S. Navy/USNR - NCO: June 1986 - August 1998

Assistant LPO for engineering department E-Div. Schedule, assign and

perform corrective and preventative maintenance of shipboard, and land

based electrical systems. Chief engineer trained on LCM/LCU systems.

Authored base wide electrical safety and tool issue program for reserve

units.

Wells Mfg. - Maintenance Cord. August 1984 - June 1986

Responsible for implementing new inventory control system for $10MM parts

department.

Maintained order point and quantity levels. Initiated purchase

requisitions. Scheduled on-time material needs on a per project basis.

Inspected for compliance parts and material received. Enter and maintain

inventory computer system. Develop working relationships with vendors in

order to maintain or reduce inventory budget.

Education & Training

Executive Certificate - Business: Notre Dame University - 2010

Electrical License; Licensed Electrical Contractor (Libertyville, IL.)

US Navy; Advanced Electrical and Electronics schools. NEC 4626/9683

Control Data Institute; Certificate in technologies

Additional training & experience in: 3M Systems, OSHA, EHS, MSDS, USDA, and

FDA policies.



Contact this candidate