Post Job Free
Sign in

Project Mechanical

Location:
Baton Rouge, LA, 70817
Posted:
March 09, 2010

Contact this candidate

Resume:

[pic]General Note: Do not use Style menu to reformat text. See

Specifications below. Delete all unused field codes. Duplicate field codes

as needed. Use Paste Special/Unformatted Text when copying from another

document. To add a carriage return in Sidebar text, use a "soft" return, by

holding down Shift as you hit Enter key.

Specifications:

Body Text: Garamond 11pt. Black

Employee Name: FrnkGothITC Bk BT (Bold) 15 pt. Blue

Employee Title: FrnkGothITC Bk BT (Italic) 10 pt. Black

Heads: FrnkGothITC Bk BT (Bold) 12 pt. Black

Sub heads: FrnkGothITC Bk BT (IBold) 10 pt. Black

Sidebar Heads: FrnkGothITC Bk BT (Bold) 12 pt. Blue

Sidebar Body Text: Garamond 11pt. Blue

Roger N. Zecchel

Senior Estimator

Areas of Expertise

Civil/Structural, Mechanical, Commercial, Electrical and Instrumentation

Years of Experience

With URS: 4 Years

With Other Firms: 14 Years

Education

BS/Construction Engineering/ Louisiana State University/1992

Contact Info:

*****@*********.***

Home: 225-***-****

Cell: 225-***-****

Overview

Has 18 years of professional experience primarily in the area of project

cost estimating. Experience includes various utilities,

petrochemical/refinery turnarounds, expansions to existing units,

maintenance, environmental, modernization and grass roots projects.

Project Specific Experience

Lead Estimator, DOE Strategic Petroleum Oil Reserve Sites in Louisiana and

Texas: Using Excel spread sheets and IPM, is responsible for establishing

cost estimates for civil/structural, E & I and equipment relevant to the

Department of Energy's Oil Storage Facilities.

Estimating, Flue Gas Desulfurization (FGD) Project, Indianapolis, IN,

Indianapolis Power & Light: Using Excel spread sheets, is responsible for

establishing cost estimates for civil/structural equipment relevant to

absorber units for the Unit 7 FGD Unit Project at the Harding Street

Station.

Estimator, Paradise, Bull Run and Kingston Power Plants, TN, Tennessee

Valley Authority: Preparing civil/structural and mechanical estimates for

the three TVA sites listed above using Timberline estimating software. All

estimates have come in at the target cost the client anticipated. URS is

providing design, procurement, construction and commissioning services for

the installation of flue gas desulfurization systems at multiple fossil

fuel power plants.

Estimator, Baton Rouge, LA, Pala-Interstate Inc.: Estimated lump sum, cost

plus turnarounds, grass roots and budget proposals, as well as creation of

project schedules using P3 for the petrochemical / refinery industry.

Assisted with the management of various civil and mechanical projects.

Estimator, Baton Rouge, LA, James Construction Group, LLC: Prepared lump

sum, as well as time and material estimates using MC^2, for capital

expansions and maintenance / debottlenecking projects for the petrochemical

industry to include all phases of estimates relevant to civil/structural,

mechanical, and equipment. Completed planning and scheduling to accompany

estimates. Upon contract award, requested and purchased direct materials

and bulks.

Estimator, Port Allen, LA, LS Womack, Inc.: Estimated various projects

associated with oil reserve sites. Estimating responsibilities included

the preparation of material take-offs on piping, concrete, and earthwork,

as well as man-hour summaries, and pricing.

Estimator, Prairieville, LA; Bengal Industries: Prepared lump sum

estimates for fabrication and erection of piping. Prepared and monitored

fabrication shop schedule.

Maintenance Planner, Sorrento, LA, OHM Corporation: Purchased supplies and

materials for process equipment. Had responsibility for shipping,

receiving, and material control.

Project Coordinator, Multiple Projects, Alabama/Arkansas & New Mexico, PEC

International, Inc.: Supervised dismantling, packing, and preparation for

ammonia refrigeration equipment, piping, etc. in Carlsbad, NM and a 165-tpd

nitric acid unit in Muscle Shoals, AL -250-tpd nitric acid unit in Helena,

AR.

Chronology

2007 to Present, URS Corporation, Baton Rouge, LA

2006 to 2007, URS Corporation, New Orleans, LA

2004 to 2006, Pala-Interstate Inc., Baton Rouge, LA

1996 to 2004, James Construction Group, LLC, Baton Rouge, LA

1995 to 1996, LS Womack, Inc., Port Allen, LA

1994 to 1995, Bengal Industries, Prairieville, LA

1994 to 1994, OHM Corporation, Sorrento, LA

1989 to 1994, PEC International, Inc., Baton Rouge, LA



Contact this candidate