OBJECTIVE: Supervision of site development. Six years experience of

supervising inspections of all contractors' work. Delivering

projects that reflect commitment to quality and value, in a

timely and cost effective manner.

EXPERIENCE:

7/2005 - Present: Offsite Superintendent / Inspector - Newhall Land,

Valencia, CA

Scheduling of construction meetings, sub-contractor activities,

inspection of all sub-contractors' work progression, and

consultant coordination. Engineering, survey, work with all

agencies, including all Caltrans roadway and bridge

projects, City of Santa Clarita, DWP, Edison, Gas Company,

AT&T, Valencia Water, Santa Clarita Water, Castaic Lake

Water Agency, Dept of Fish and Game. Extensive training in

SWPPP and erosion control, from development of plans and

placement of BMP's, to site inspections and documentation.

BIA certified.

Project: RiverVillage, Valencia, CA

9 million yards rough grade

2 miles major roadway

5 miles in-tract roads

435 house pads

865 multi-family units

7,300 LF soil cement bank protection

2,000 LF rip rap rock bank protection

7,300 LF pave A/C bike trails

Water line - 8" to 60" mainline

Storm drain - 18" to 72"

Sewer - 6" to 10" main

All in-tract and backbone mainline dry utilities

130 LF structural bridge constructed over the main 90" DWP

feed into Los Angeles

Traffic signals at main intersections

Bond and HOA exoneration

Soils and geology

Water quality basins per County requirements

Dewatering ground water during soil cement operations

Relocation of 12 oak trees up to 25 tons

John Murphy - Page 2

1/2004 - 7/2005 Offsite Senior Superintendent - Empire Land, Ontario, CA

Scheduling of construction meetings, sub-contractors, inspection

authority, and consultant coordination. Engineering, survey,

and all agencies. Quality control of materials and

workmanship. Soils and geology. City inspectors.

Project: Anaverde, Master Plan, Palmdale, CA

4.2 million yards rough grade

5,200 house pads

3 miles major roadway

4.5 miles in-tract streets

All dry utilities, sewer, water, storm drain

54" main trunk H.D.P.E. sewer line

Dewatering of ground water

2/2002 - 1/2004 Foreman Superintendent, C.A. Rasmussen, Inc., Valencia, CA

Fine grade and rough grade duties, worked with city, county, and

state inspectors in Southern California. Sub-divisions,

channels, house pads, special permit jobs, emergency work,

import and export dirt hauls.

2/1994 - 1/2004 Foreman Superintendent, D.W. Burhoe, Inc., Santa Paula, CA

Fine grade and rough grade duties. Extensive road and street

construction. 4 miles, The Old Road, Valencia, CA. Emergency

work. Scheduling materials and labor as required during job

progress to meet scheduled completion dates.

3/1985 - 1/1994 Foreman, Operator, Grade Checker, R.C. Becker & Son, Inc.,

Valencia, CA

Fine grade duties. Operated various pieces of equipment. Grade

checker. Local 12 Operating Engineer.

REFERENCES: Bob Brazell 661-***-****

Newhall Land - Vice President, Operations

Pete Casey 805-***-****

Independent Consultant - Owner

Charlie Rasmussen 805-***-****

C.A. Rasmussen - President

John Galloway 951-***-****

A.C.I. Contractors - Vice President

Habib Chababi 661-***-****

Pinnacle Land Surveying - President

Jason Fukumitsu 661-***-****

Hunsaker and Associates, Valencia - President

Jim Frankian 818-***-****

R.T. Frankian and Associates - President

PERSONAL: Pasadena City College - 1984 - 1986

Married - April 8, 2005



Contact this candidate