George I. Collins III
Mountain Rest, SC 29664
abm1he@r.postjobfree.com/abm1he@r.postjobfree.com
Objective
Provide quality and professional services in Visual Inspection and Non-
Destructive Testing of weldments to industrial code requirements.
Qualifications
I earned an Associates degree in Occupational Technology (Welding) and
trained under various company welding programs. I received AWS CWI
(inspector) credentials in 2001. In 2004 I qualified to ASNT NDT level II
in methods PT and MT. In 2005 I qualified to ASNT level II in the UT
method.
Education
Blair Academy Blairstown, NJ Diploma 1972
Davis and Elkins College Elkins, WV 1978
Tri-County Technical College Pendleton, SC Associates Degree 1994
Certifications
American Welding Society Certified Welding Inspector 2001/re-Certified
2004/2007
#01101831
ANSI N45.2.6 Inspector Level II Welding 2005
American Society for Nondestructive Testing level II in Dye Penetrant (PT)
2006
Relevant Experience
Certified Welding Inspector; qualified and certified procedures and welders
to ASME Section IX, visual inspect welds to: Bridge D 1.5, D1.1, B 31.1,
B31.3, ASME Section I,V,VIII, IX, API 650, 510, 570 and AWS codes, PT tech,
MT tech, UTT tech, shop foreman, field supervisor, shift manager, pipe and
structural welder, pipe fitter, weld mapping, PCMS data entry, P&ID,
Isometrics, Hydrostatic testing, piping baseline mapping, vacuum test, air
test, oil test, pipeline punch list walk down, field sketching,
torque/tension, connectors, traveler packages, materials receiving, daily
reports, Safety Committee.
Weld Processes and Materials; SMAW, GTAW, GMAW, FCAW, carbon and plasma arc
gouging, oxyacetylene cutting, carbon steel, stainless steel,
chrome/molybdenum, inconel, hastalloy, aluminum
Employment
2008 Diamond Inspection Toledo OH BP
refinery Turn Around
QA/QC UT Thickness Baseline, Visual inspections, PCMS
data entry, walk
Down piping system, pipe iso-field sketching, vendor
surveillance, T/A pkgs
2008 Turnaround Welding Scvs Carson CA
Conoco/Phillips refinery
Turn Around QC, heater tube replacement, weld mapping,
visual inspection
2008 Computech Eng. Co. El Segundo CA
Chevron refinery
Turn Around, QM, client QA rep., vendor surveillance
2008 Matrix Service Inc. El Segundo CA
Chevron refinery Turn
Around, QC, visual weld inspection, weld mapping, daily
reports
2007 Diamond Inspection Toledo OH BP
refinery Turn Around
Client QA, UT Thickness Piping Baseline readings and
mapping, T/A pkgs
2007 Code Inspection & Testing Philadelphia PA
Sunoco refinery Turn
Around Alkylation, Generator, QA, hydro walk downs,
flange inspections,
weld inspections, daily reports
2006 Tiger St. Croix Constr., Inc. St. Croix USVI
Hovensa refinery new
construction LSG Project AWS CWI
QC, night shift manager, visual weld inspections, weld
mapping, RT
interpretation & application
2006 Integrity Testing and Inspection Hawesville KY
WKE power plant
AWS CWI Outage ASME Section I Code Boiler repairs,
UT Thickness,
weld tracking, create traveler packages, materials
verification, visual weld
inspection, review and verification of MTR's,
hydrostatic test
2006 Turner Ind.
Convent LA Motiva refinery
AWS CWI Turn around B31.3, ASME Section VIII,
Catalytic Cracker,
Fin Fans, Dye Penetrant (PT), weld mapping, hydrostatic
tests, air tests, pipe
line punch list walk downs, P&ID-Isometrics, travel
packages, daily reports
2005 Met Chem Battle
Mountain NV Newmont Mine
AWS CWI New construction Phoenix Project Third
Party Inspection
Visually inspect structural, tank and pipe welds to API
650, ASME Section
VIII/V, D1.1, B31.1, B31.3, observed nut/bolt
tension/torque, tank weld oil
test, vacuum box test, air seal test, performed PT/MT
on plant equipment &
welds, RT film interpretation of tank welds, company
Safety Comm. Rep.,
materials receiving inspection, daily reports
2005 NIC
Cordova IL Quad Cities Nuclear Sta.
AWS CWI Outage ASME/AWS standards visual
inspection structural/
pipe welds, moisture separator system, condensate and
hydrogen lines,
inspection reports
2005 Robert W. Hunt Blackstone
VA Wal Mart
AWS CWI Visual inspection of structural
connecting welds/bolting
deficiency log, weld mapping, daily progress reports
2004 Telic Newport IN
Newport Chemical Disposal Depot
New construction, pipe
welder
2003 BE&K Virginia B.I.
Chemical
Shutdown, pipe welder
2003 PEM Seneca SC Oconee
Nuclear Sta.
Outage, pipe welder
2003 Walzel Inspection Ingleside TX
Caltrans Project
AWS CWI New construction, visual inspection of
Bridge footings to D1.5
Documentation of amps/volts/travel speed/pre heat
temp/weld prep/final insp
2003 McGee Enterprises Granby TX gas turbine
power plant
Grass roots, pipe welder
2003 Duke/Fluor Daniel Belews Creek NC fossil
fuel power plant
Rebuild, pipe welder
2003
TIC Canadys SC fossil fuel
power plant
Outage, tube welder
2003 Methuen Construction Merrimack NH food service
plant
Shutdown, pipe welder
2003 Fagen, Inc. Star SC
gas turbine power plant
Grass roots, pipe welder
2003 J E Merit Greer SC
chemical plant
Grass roots, pipe welder
2002 Weld Team Mauldin
SC personnel service
AWS CWI Qualified and certified procedures and
welders to ASME
Section IX, monitor welders, document amps/volts, weld
material control
2001 Spec/TMP Lynchburg VA
fabrication shop
Module fab, pipe welder
2001 Becon New Hill NC
Shearon Harris Nuclear Sta.
Outage, pipe welder
1990-2001 Fluor Daniel Multiple Sites USA
Pipe welder,
instrument welder, boiler maker, maint.
mechanic welder,
civil mech.
2001 H&M Cadiz TN gas
turbine power plant
Grass roots, pipe welder
2000 Brady Horne Charleston SC waste
water
New construction, pipe
welder
1999-2000 Mountain Millworks Long Creek SC fabrication shop
Varied projects, shop
foreman
1999 PPM Bowater NC
paper mill
Shutdown, pipe welder
1997-1998 Duke Energy Seneca SC Oconee
Nuclear Power Sta.
Outage, pipe welder
1997 Simmco Counce TN
Paper Mill
Shutdown, pipe welder
1996 I&M Fayetteville NC
Agri-business
Shutdown, pipe welder
1996 Bell Corp. Manassas VA
Microchip facility
New construction, pipe
welder
1996-2000 Rust Multiple sites USA
Shutdowns, Pipe welder
1996 Encompass Blacksburg SC
Paper reclamation
Shutdown, pipe welder
1994-1996 BE&K Multiple sites USA
Shutdowns, pipe welder
1994-1995 Century III Greer SC
Chemical plant