Post Job Free
Sign in

Project Engineer

Location:
Laurel, MT, 59044
Posted:
April 04, 2010

Contact this candidate

Resume:

Ward M. Thurman

**** ********* **.

Laurel, MT 59044

406-***-****

PROFESSIONAL WORK HISTORY

**/** - ******* ******** ****** Mining Co. P.O. Box 382, Ruth, NV

89301

Senior Metallurgist

. Improve concentrator metallurgical performance.

. Develop new processes for treating challenging copper sulfide

ore.

. Manage and direct 16 employees in the metallurgical laboratory.

Including budgets, planning and scheduling work, and design

metallurgical tests.

. Analyze and report on metallurgical lab test results, make

recommendations to concentrator management for process

changes/improvements.

. Support concentrator operations and maintenance with engineering

design. Assisted in design for a larger concentrate pump to

increase concentrate flow and ultimately copper recovery.

Resulted in a 2.2% improvement in overall concentrate recovery.

. Participate in daily concentrator management planning meetings,

monthly safety meetings, internal audits and safety inspections.

1/07-Present Anchor Photography/Creative 1437 Beartooth

Dr., Laurel, MT 59044

Owner/Principle Photographer

. Anchor Photography is a full service photography business

providing people and businesses with photography for weddings,

portraiture, sports and commercial images using both the latest

in digital technology and classic film. Anchor

Creative/Photography credits include over 500 articles appearing

in more than 40 publications, including Wild West, Farm and

Ranch Living, Western Business News, Mining Engineering,

Professional Photographer Magazine, Country Magazine, Country

Discoveries, Health Confidential for Men, Dr. Sears Health

Alerts, Early to Rise,, Agri-News, Focus on the Family, The

Joyful Woman, Montana Free Press, and local newspapers. Anchor

photographs have appeared in calendars, Montana Outdoors,

Country Magazine, Montana Magazine, The Drift, Farm and Ranch

Living, Creation Illustrated, and was featured on the cover of

the Montana State University marketing catalog, Yellowstone

Country Travel Guide in 2004 and again inside the Yellowstone

Country Travel Guide from 2004-2009.

. Business management, including production workflow, developing

and managing business plan and budgets, manage temporary

employees on assignment; order fulfillment, coordinating

printing projects between several photographic labs; assisting

with marketing, design of advertising materials, and media

buying.

6/06-1/07 Stillwater Mining Company HC-54, Box 365, Nye, MT 59061

Mill General Foreman

. Supervised four mill operating crews and salaried foreman,

planning weekly work schedules, conducting weekly

safety/housekeeping inspections and reporting.

. Conducted weekly safety meetings and worked with mine safety

department in program implementation.

. Coordinated maintenance and operating activities, coordinated

activities between the mine and concentrator departments.

. Responsible for mill project planning, scheduling, budgeting and

implementation.

. Assisted with annual budget development.

. Responsible for communication and coordination between

concentrator and smelter crews.

. Participated in mill process development and improving plant

recovery.

3/99-6/06 Stillwater Mining Company HC-54, Box 365, Nye, MT 59061

Project Metallurgist

. Responsible for mill project planning, scheduling, budgeting and

implementation.

. Assisted with annual budget development.

. Participated in all aspects of day-to-day operations at the Nye

Concentrator, including crushing, grinding, flotation, filtering

and other operations.

. Prioritized operational needs with maintenance.

. Responsible for communication and coordination between

concentrator and smelter crews.

. Participated in mill process development, improving plant

recovery.

. Supervised lab and Process Control technicians.

6/98-3/99 Stillwater Mining Company HC-54, Box 365, Nye, MT 59061

Process Design Engineer, East Boulder Concentrator

. Worked on the initial development of a new bulk sulfide

concentrator installed at the East Boulder mine site.

. Responsibilities included process design, specifications,

procurement, coordinating engineering and construction

efforts.

10/96-6/98 Stillwater Mining Company Box 1209, Columbus, MT 59019

Senior Metallurgist

. Participated in expansion project to increase throughput of

the smelter and expansion of the existing electric

furnace/TBRC increased plant capacity to 34 stpd.

. Completed construction of a sampling facility to sample

various types of secondary PGM materials for toll smelting

in the smelter.

3/96-10/96 Stillwater Mining Company HC-54, Box 365, Nye, MT 59061

Project Engineer, Mine

. Participated in various process related projects in the

mine: cemented backfill, mine dewatering, tailings backfill

plant, and others.

1/95-3/96 Stillwater Mining Company HC-54, Box 365, Nye, MT 59061

Design Engineer, 2000 tpd Expansion

. Responsible for design and construction coordination of

concentrator expansion from 1000 tpd to 2000 tpd.

2/92-12/94 Stillwater Mining Company Box 1209, Columbus, MT 59019

Metallurgist

. Initiated and documented safety programs and hazard

communications requirements.

. Secured exemptions from OSHA inspections for 2 consecutive

years.

. Received the Governor's Safety Award in 1994.

. Participated in projects to improve operation of the

smelter and concentrator.

. Position required abilities to: supervise smelter

operators, design and carry out flotation test work, study

and report on grinding circuit performance, conduct in-

depth research, work effectively with OSHA representatives.

Non-professional work history available upon request.

EDUCATION Bachelor of Science in Metallurgical Engineering with Mineral

Processing Emphasis, Montana College of Mineral Science and

Technology, Butte, Montana. Graduated: December 1991

Sherritt Inc. Training program for Base Metals Refinery

operators and management. Included actual maintenance and

operating activities at the Fort Saskatchewan nickel

refinery, a large hydrometallurgical facility.

Rocky Mountain School of Photography: Olympic National Park

with David Middleton, 2002: Studio Lighting w/ Heather

Thomas, 2003: Wedding Photography with Melanie Nashan, 2004:

Architectural Photography with Randy Becker, 2004.

CERTIFS Certified Project Management Professional (PMP) by Project

Management Institute. September 2001.

Universal Technical Institute, Phoenix, AZ.

Certificate in automotive and diesel repair, 1979.

CIVIC President, Photographic Institute of the Yellowstone, 2006-2008

ACTIVITIES Member, Grace Bible Church 1/2003 to Present

Member, Columbus Baptist Church, 2/92-10/2000.

Church Treasurer, 1/98-10/2000

Member, Columbus Volunteer Fire Fighters 1993-1996

REFERENCES Available upon request.

LIST OF MAJOR CAPITAL PROJECTS

PROJECT TITLE LOCATION CAPITAL SCHEDULE RESULTS

BUDGET

Middlings Nye $150,000 Spring and summer One month over

Column Cell Concentrator 2006, 5-months from schedule due to labor

Expansion conception to availability, slightly

completion. Designed, over budget due to use

fabricated and of in-house labor.

installed cells (18" Raised final

dia.) using in-house concentrate grade by

engineering and 10% w/o loss in

labor. recovery.

Sand Booster Nye Site $2,000,000 18-months. Use of concentrator

Station Represented facilities, equipment

concentrator dept. on and personnel resulted

an inter-departmental in significant savings

project team. allowing resources to

Commissioning be utilized in other

starting 12/06. areas in the mine.

Reagent Nye $65,000 3-month winter $2500 under budget, 2

Storage Concentrator construction weeks behind schedule

Building schedule. Dismantled due to weather (wind)

Relocation and re-erected an old and electrical

building for use as a interferences in the

storage building. dismantling phase.

Completed February

2003.

Filter Press Nye $110,000 August 2002: Filter Filter started up on

Expansion Concentrator press capacity schedule despite

doubled during a two several un-scheduled

day shut down of the modifications and

press. Schedule repairs. 10% under

allowed plant budget. Filter

production to capacity doubled,

continue reduced filter wear by

uninterrupted. approximately 25%.

Product Stock Nye $50,000 April 2002: Project Project completed on

Tank Concentrator repaired an existing schedule. Workarounds

Reconstructio 20,000 gallon addressed

n agitated storage tank unanticipated damage

during a 4-day plant and wear. Ran $5k

shutdown. over due to extra

work.

Larox Nye $1.7M Completed March 2001 On schedule, 20% under

Concentrate Concentrator budget. Replaced

Filter existing kiln con

dryer with filter.

Increased plant

concentrate handling

capacity by 25%.

2000 Nye $1.8M Complete November 11, Two weeks behind

Flotation Concentrator 2000 schedule, $29k under

Expansion budget. All cells

commission by

10/19/00.

SAG Mill Nye $152,000 Complete October 25, Fast track project.

Discharge Concentrator 2000. Screen installed &

Screen commissioned during

plant outage from

10/17 - 10/19. Screen

reduced wear on SAG

mill pulp dischargers

and increased

throughput.

Column Cell Nye $150,000 Completed April 1999. On schedule, 18% over

Installation Concentrator budget. Increased

final con grade by 20

- 25% w/o loss in

recovery.

Secondary Columbus $1.0M Completed April 1998. On schedule, 15% under

Sample Precious budget. Stillwater now

Facility Metals toll smelts and

Smelter refines secondary PGM

materials through this

material handling

facility.

1995 Smelter Columbus $3.0M Completed December On Schedule, on

Expansion Precious 1996 budget. Participated

Metals in final stages and

Smelter commissioning.

1995 2000 TPD Nye $8.0M Completed December Met original schedule

Concentrator Concentrator 1995 but failed to meet

expansion accelerated schedule.

As a result of

significant process

design changes,

project went over

budget 12.5%.

2



Contact this candidate