Post Job Free
Sign in

Six Sigma Manager

Location:
Raleigh, NC, 27612
Posted:
April 05, 2010

Contact this candidate

Resume:

Michael Beltran

**** ********** *****

Raleigh, North Carolina 27612

309-***-****

*******@*******.***

CONTINUOUS PROCESS IMPROVEMENT / LEAN MANUFACTURING

"Six Sigma Black Belt Certified"

Multi-faceted Focus Improvement Leader with experience combining

productivity, process improvement, process engineering and quality

management. Demonstrated success implementing continuous improvement

initiatives utilizing six sigma methodologies. Extensive experience

implementing cost reduction projects, resource re-allocation programs in

high volume manufacturing environments. Hands on experience in FDA and USDA

regulated arenas. Change agent in managing departments with high

concentrations in Safety and Efficiency.

Operations Management Production Management Lean Six Sigma Black

Belt

Lean Manufacturing Continuous Improvement Process Engineering /

Quality

FDA & USDA 5S Coordinator, JIT & ISO 14001, ISO 9001,

KanBan cGMP

SAP / MRP SPC Implementation Budget Management

Performance Measurements Strategic Planning P&L / Capital Projects

EXPERIENCE

ConAgra Foods, Garner, NC June 2009 - Present

Manufacturer of processed meat into a finished good called a Slim Jim.

Production Supervisor

Manage Packaging or Ready To Eat (RTE) department, including 3 Leads and

105 hourly associates.

. Assisted the Garner facility in setting up their Packaging department

after a plant explosion.

. Lead Sub-group of Crisis Management Team and Employee Engagement

teams.

. Increased OEE from 40% to 74%.

. Increased Labor Variances from negative 200 to positive 350 Labor

Hours.

. Increased both Attainment and Adherence percentage by 30%.

. Increased pounds produced per day from 30k to 60k in 3 months.

. Led Kaizen team completing line balancing, 5S, removal of duplicated

documentation, and floor layout.

. Reduced Sanitation lead from 6 to 4 hours.

. Improved Visual Factory on RTE production floor.

ALCAN, Chase City, VA December 2007 - October 2008

Manufacturer of glass vials for pharmaceutical applications.

Operations Manager

Directed and managed Production, Process Engineering and Technical Service,

including 5 managers and 140 hourly associates.

. Lean Six Sigma Black Belt Project - Implemented shop floor SPC system

with new software program improving quality and yield by 5% on

dimensional defects. Savings $540 annually.

. Lean Six Sigma Black Belt Project - Improved yield by 5% on Cosmetic

defects. Savings of $270 annually.

. Fully responsible for plant P&L.

. Improved On-Time Delivery from 70% to 99%.

. Decreased employee turnover from 40% to 20%.

. Sponsored 8 - 5S projects throughout the facility.

. Sponsored Green Belt projects saving of $250k.

. Sponsored 4 - Green Belt employee certifications.

. Increased productivity from 540k units to 625k per day.

. Led installation and validation of improved vision systems. Capital

project $260k.

. Responsible for all Change of Management actions in facility.

. Completed Lean Six Sigma Black Belt Certification.

COVIDIEN, Raleigh, NC February 2005 - December 2007

Manufacturer of contrast media solution or parenteral medicine.

Departmental Manager

Managed Formulation, Aseptic Filling, Automated Packing departments.

Responsible for insuring compliance to SOP processes and cGMP practices.

. Updated SOP's to ensure procedures provided detail to comply with FDA

regulations.

. Formed Kaizen Team to study operations sequence, material flow and

organization charts to determine operator functions and

responsibilities, reducing initial start up by 2 hours.

. Interacted extensively with manufacturing engineers on design and

production modifications to improve quality and efficiencies.

. Designed and maintained database to track financial resource usage and

productivity.

. Analyzed productivity and profitability of key metrics to define

strengths and areas of improvement.

. Analyzed and improved departmental operations, resulting in increased

productivity 75% to 120%.

. Led Component Processing Team to incorporate product and manufacturing

engineering during trouble shooting methods and created a cross

functional team.

. Completed production reports, purchase orders and material and tool

request.

. Reduced departmental defects by 15% and SAR's (Supplemental Analysis

Report - deviation) by 10%.

. Planned annual, monthly and weekly validation and preventive

maintenance procedures during production down times.

. Played a key role in identifying a supplier and production

requirements for the installation of a new fill line.

. Managed release of batch records to meet customer delivery schedules.

EATON, Middlesex, NC August 2003 - February 2005

Manufacturer of steel braided hoses for industrial, aerospace and

automotive applications.

Production Manager

Managed all aspects of production, assembly and shipping operations.

Accountable for daily operations of 60 employees, ensuring they meet key

performance metrics.

. Increased On-Time Delivery from 45% to 90% in 5 months and above 95%

the following year.

. Simplified production schedule from a monthly to a daily dynamic

schedule improving versatility.

. Implemented min. and max. levels of WIP to allow versatility in daily

scheduling.

. Increased machine uptime from 45% to over 75%.

. Led daily meetings with all department heads with a focus of meeting

and exceeding customers' expectations.

. Reduced scrap 8.3% in facility saving $34,000 annually.

. Provided expertise and leadership in achieving ISO9001/AS9100B and

AS7112 certification and ISO14001 recertification.

CATERPILLAR, Clayton, NC / Peoria, IL May 2001 - August 2003

Building Construction Products (BCP) and Transmission Business Units (TBU).

Process Engineer / Production Supervisor

Led cost and process improvement projects utilizing Six Sigma methodologies

saving over $5M dollars. Completed a three departmental rotation program of

MPDP (Manufacturing Professional Development Program).

. Lean Six Sigma Green Belt Project - Strategically placed inventory in

the total supply chain and reduced facility lead time to manufacture a

tractor saving $4M dollars annually.

. Lean Six Sigma Green Belt Project - Standardized process lead times

for all suppliers saving $1.3M dollars annually.

. Reduced turnover (received-identified-rejected) of nonconforming

material from 33 days to less than targeted 48 hrs for 6 months

continuously.

. Reduced fork truck traffic throughout facility by 12%.

. Created cycle strategies for domestic and foreign suppliers to

maximize inventory turnover and best utilize delivery locations.

. As a 5S Coordinator, conducted facility training for all hourly

employees. Developed project owners and lead several projects

throughout the facility saving $127,000.

. Completed Six Sigma Green Belt Certification.

EDUCATION

Purdue University

B.S., Industrial Engineering Technology, 2001

Computer Skills: MFGPro (MRP System), AutoCad, Microsoft (Word, Excel,

Power Point, Visio, and Project), Maximo, Catnet (MRP System), Mechanical

Desktop, Vimec, MAS90 (MRP System), SAP, Infinity QS (SPC), InnaTrack, and

Minitab



Contact this candidate