Oluwole Oyenuga
Cell - 832-***-**** ( Email - ablzy7@r.postjobfree.com
Project Planner / Scheduler/ Manager
Planner/ Scheduler with over 10 years proven success in performing,
monitoring and reviewing planning and scheduling functions, skilled in EPC
schedule development using Primavera / Microsoft project, risk assessment
and analysis using Pert master, cost analysis using EVM and change
management in the field and home office. Interacts effectively with all
organizational levels from technicians to management and client
Critical Thinker able to effectively synthesize deliverables across
stakeholders to analyze and solve complex technical problems
SAP FUNCTIONAL CONSULTANT having hands-on experience of Solution Analysis,
Design, and Configuration experience in SAP MM/WM, IM, and PO with touch
points in SAP FI/CO in the Oil & Gas Engineering and Consulting Industry.
Has implemented two full life cycles and upgrade projects from Project
Implementation, Blueprint, and Realization to Go-Live using ASAP
methodology
PROVEN SUCCESS
. Was involved in Pert Master Schedule Risk Analysis as required on
Project of Total Installed Costs (TIC) of $2.4B.
. Constructed and maintained EPC Primavera Integrated Master Schedules
with TIC values in the range of $50M - $500M in support of project and
client requirements.
. Saved $4+ million (65 %+) in project costs through a realistic Schedule
Interactive planning strategy (IPS).
. Led 7-member team in managing multi -million dollars IT projects.
. By building a good and workable schedule was able to reduce field
changes, construction clashes by 98%, downtime by 20% and reduced
construction time by 5%.
SAP PROFESSIONAL EXPERIENCE
. Strong hands on configuration experience on SAP MM- MRP, Purchasing,
Inventory Management and Vendor management with interfaces in FI- GL,
AR, AP and SAP - CO, CCA, and PCA
. Experience in Requirements Gathering, Scenario testing, writing
functional specifications, creating training material and knowledge
transfer to client.
. Strong analytical, presentation & organizational skills.
. Designed test scripts for unit, integration and user acceptance
testing.
. Configured Plant, Purchasing Organization, Vendor Storage location,
stock Transfer Order and Material Type.
. Maintain Material Master, Vendor Master Data, Purchase Info Records,
and Request for Quotation, Quotation, Purchase Requisition, Purchase
Order and terms of payment.
. Configured and processed various Good Movements types including Good
Issue such as shipment to customers, withdrawal for production order
and for scrap.
. Familiar with Material Master Preparation and load to test clients and
production.
. Extensive experience processing Good Receipts movements from various
sources including from production order, purchase order and initial
inventory load
Education & Qualifications
. Masters in IT /Project Management, DeVry University (Continuing
Studies)
. Bachelor of Science, Obafemi Awolowo University, Ile -Ife
. Certified Project Management Professional (PMP) through Project
Management Institute
TECHNICAL SKILLS:
. SAP MM: Material Master, Vendor Master, Batch management, Purchasing
Information, Physical Inventory and Material Requirement Planning (MRP),
Invoice Verification, BOM, Inventory Management
. FI: GL, A/R, A/P, Fixed Assets. New GL
. Controlling: Profit Center, Profitability Analysis and Product Costing
Integration: FI & CO integration with MM, SD and PP
Tools: ASAP Methodology, Project Management Methodology
ERP: SAP: R/3 Versions 4.6C, & ECC 6.0.
. Tools: MS Office, Excel & PowerPoint presentation MS Access
Operating Systems: MS DOS, Windows NT, 95, 98, 2000, XP
. Software Skills: P3.1, P3.1e, P5, P6.1, P6.2& Microsoft Project 2003,
2007.
Oluwole Oyenuga
Page 2
Cell-832-***-****
( Email- ablzy7@r.postjobfree.com
Training
. Milestone Training Institute-Hand on training and configuration in SAP
FICO/MM/PP-2009 /2010
. Primavera 3.1 Courses 601, 602, (Primavera Systems, Philadelphia, PA)
- 2005
. Pertmaster Risk Conference (Pertmaster, Houston, TX) - 2007
. Primavera 6.0 Courses 102, 106, (Innovative Solution c/o Primavera
Systems, Houston, TX) - 2007
. 19SA5 Safety Awareness 5- OSHA General Safety & Site Specific (Texas-
City TX) - 2008
. Project Control Training (AACEI Houston Chapter, Houston, TX) - 2009
STATUS
. Willing to Travel - 100%
Professional Overview
Planner/Scheduler - eRichard Consulting - Connecticut
(Present)
Meter Automation Project
Build schedule using Primavera 6.2 version from initiate to closeout
Interact with Client on weekly basis with regards to updates and
schedule progress
Hands-on contribution to the development and maintenance of Work
Breakdown Structures (WBS)
Identified and scheduled project deliverables, milestones and required
tasks.
CAMERON, HOUSTON, TX - Contract
[2009-2009]
Scope: Implementation
Environment: ECC 6.0
Role: SAP Functional Consultant
Cameron Corporation is a leading provider of flow equipments products,
systems and services to worldwide oil, gas and process industries. Project
involved customization of SAP ECC 6.0 and implementation across all
enterprises in US from their oracle legacy system, I was Involved in
analyzing the requirements of client and configuration in MM/WM modules
with touch points in FI/CO configuration and Testing and support to resolve
the issues.
Responsibilities:
. Involved in Full Life Cycle Implementation of the project; including
blueprint preparation, configuration, testing, end user training and go-
live phases.
. Interacted with client for requirements gathering and analysis.
. Reviewed and updated the functional design documents for MM/WM
developments.
. Gather, document and analyze business requirements during Blueprint
. Create Material master, Vendor master, Purchasing Information record,
batch management configuration
. MRP confirmation setting up reorder-point planning, forecast-based
planning and time-phased planning
. Inventory management configuration of material document, goods movement
and stock overview
. Create material BOM for PP module
. Involved in developing detailed functional specifications and
configuration documents
. Material Ledger configuration in different currencies
. Invoice verification process integration between FI-MM, Invoice
posting, Document parking, setting tolerance limits and blocking and
releasing Invoices
. Configuration of MM global settings,
Integration with FI/CO and SD and PP:
. Integration of MM with FI, CO and SD modules, Fine-tuning interfaces
with FI, GL, AP, and AR including validation / substitution rules.
. Co-ordinate with SD team to implement credit management for receivables.
. Configured company code, Created GL accounts, Defined posting keys,
maintained field status variants and assigned to company code, screen
variants for document entry as per business specifications and tested
the configuration in various scenarios.
. Configuration of Tax on sales and purchases, Withholding tax, Tax
jurisdiction codes, tax Procedures, Cross Company code Configuration.
Oluwole
Oyenuga Page 3
Cell-832-***-****
( Email- ablzy7@r.postjobfree.com
Planner / Scheduler - Jacobs Engineering/ BP - TEXAS CITY
[2008-2009]
Infrastructure Piping and Integrity Projects (IPIP)
. Collaborate with other project management team member involved in
development of the work breakdown structure (WBS), to support the
project deliverables.
. Integrates inter-discipline schedule requirements and constraints to
establish logical work sequences for assigned disciplines or
specialties.
. Coordinate and prepare monthly schedule reporting and cost, including
schedule forecast updates and schedule/cost contingency management.
. Extensive use of Primavera 6.0/ 6.1/6.2 software in performing
scheduling functions.
. Monitors schedule deviation for assigned disciplines or specialties
and recommends corrective action/workaround solutions for project
considerations.
. In charge of reviewing the Contractor's scheduling to ensure it
includes appropriate definition, content and extent of time control
coverage
Construction Planer /Scheduler - Jacobs Engineering / BP HOUSTON
[2008]
San Juan Natural Gas Project Coal Bed Methane Project
. Provides project schedule analysis and studies of problem areas to
determine criticality of schedule activities. Recommends alternatives
for schedule improvement to project team for discussion and/or
decision.
. Proactive approach to retrieving information from engineers and
contractors.
. Attained 99%+ customer satisfaction in providing a baseline to move
project forward. Also integrated subcontract schedules with project
master schedule.
. Resource Loaded the Schedule at Activity level and level of effort
(LOE).
. Identify critical Path Activities (CPA) and near critical and advise
project team accordingly.
Lead Planner / Scheduler -El Paso Corporation - Houston - (Contract)
[2007-2008]
Worked on on-shore, offshore Pipeline Projects, Sub-sea Facilities
experience, Revamp, TAR, De-bottlenecking, Corrosion Inspection &
Integrity Projects
. Built schedules eliminating reworks due to design, fabrication and
construction issues.
. Develop, maintain and control a resource-loaded schedule for various
capital projects and maintenance projects using Primavera P3 and P5
software.
. Rebuilt customer confidence/company credibility with regards to having
confidence in the schedule baseline.
. Ongoing liaison with various departments including engineering, and
procurement in coordinating work sequences within the integrated project
plan.
. Subsea scheduling experience on offshore installation such as FPSO, FSO
conventional and horizontal Xmas trees, co-ordination and follow-up with
contractors on offshore/Onshore projects to ensure timely completions,
achievements of project objectives and adherence to budget.
Project Coordinator -El Paso Corporation - Houston
[2007]
Worked on Templates in setting up a PMO office
. Creation of a plan (3yr to 5 yr) for the whole organisation
. Create staff training manual
. Internal consulting and mentoring
. Select and maintain project management tools for use by employees
. Provide project management guidance to project managers in business
units.
. Develop and implement a consistent and standardized process. Improve IT
infrastructure and enable business process efficiencies
. Simplifying IT operations for asset management, capacity management,
change management, configuration management, data protection
management, and security update management.
. Promoting best practices by advising employees about best practices
management procedures, service modeling, and other architectural
guidance.
Oluwole
Oyenuga Page 4
Cell-832-892-
0402 ( Email- ablzy7@r.postjobfree.com
Professional Overview
SAP Project System Analyst FICO/MM - B Braun - HOUSTON
[2005-2007]
. Perform and Document fit /gap analysis.
. Analyze, implement, support, and document optimal uses and
configurations of the SAP MM module to support the business.
. Across the order-to-cash process, research, analyze, and evaluate
present or proposed business procedures or problems to define the best
SAP system solutions and map them to SAP functionality.
. Identify sales information and business requirements by interviewing
and working with key business personnel and configure systems to
support these requirements.
. Develop comprehensive project plans for producing deliverables and
meeting management expectations. Implement solutions according to
project plans.
Software Tester - Wal-Mart Detroit MI
[2004- 2005]
Software Development Project
. Led end-to-end project lifecycles from customer prospecting to
contract negotiations and implementations.
. Built alliances with independent partners and managed complex proposal
development. Instituted Share Point as the collaborative medium for
cross-company project management.
. Improved customer satisfaction and on-time delivery from 80% to 96%;
repeatedly and managed virtual teams consisting of Programmers,
Testers and contracting staff on multiple projects. Came in 10% below
budget.
Site Planner/Scheduler- Pharmaceutical plant facilities, Pfizer
Pharmaceutical, Surrey, UK [2000-2004]
Expansion, qualification and validation, and start-up of clean
room/pharmaceutical facilities
. Plans and supervises the effort to establish milestones for total
project and major portions of the project. Reviews and update project
work activities to ensure support of project milestones.
. Perform productivity analysis of construction operations and crew
analysis of work operations by craft.
. Perform schedule monitoring, including identifying critical activities
and updating functions for specific applications, disciplines, or
specialties. Assists in the development of requirements for updating
and monitoring the schedule.
Project Planner / Project Analyst, Elf Petroleum London UK
[1998-2000]
. Assist in reviewing proposal provisions related to schedule/cost
engineering and material control, and develops supporting data for
contract negotiations.
. Maintained change management system identifying variances from
original scope of work.
. Responsible for establishing of scheduling format, maintenance,
analysis and reporting presentation.
TECHNICAL SKILLS
. Project Planning & Scheduling skills using (P3.1, P3.1e, P5, P6.1,
P6.2 & Microsoft Project 2003, 2007).
. Expert Skill in Excel working with Pivot Tables, Word, Access and
PowerPoint, Visio, Project Web Access (PWA), Share point Site and
Project Server.
ASSETS
. Good Communication, Conflict Resolution, Negotiation, Listening
skills, Self-Motivated, Detailed Oriented, Team Building skills,
Relationship Management and ability to multi-Task when needed.
. Comprehensive knowledge of Software Development Life Cycle (SDLC)
having thorough understanding of various phases: Analysis, Design,
Develop, Test and Implement in IT projects.
. Ability also to produce various management reports including summary,
schedule and Earned Value reports to management, and to read,
understand and interpret Engineering/construction drawings and
specifications.
REFERNCES: Available Upon Request.