Post Job Free
Sign in

Power Plant Engineer

Location:
Tell City, IN, 47586
Posted:
August 16, 2010

Contact this candidate

Resume:

**** ***** ****, **** **** Indiana • 812-***-****•*******@***.***

Jay Luna

Objective: Skills

Obtain a Position as a Mechanical Supervisor/Technical Advisor. To share my knowledge and

heavy industrial experience in a team environment where Safety is valued above all while also

assuring Quality and customer satisfaction. I have dealt with heavy industrial mechanical projects

my entire career and I know what it takes to bring one in on time and under budget. I h ave

worked o n turbines extensively for 15 years . I have gone through pre construction planning,

erection, construction and start up/commissioning Support. Perform well in outage type

environment fast paced and under pressure. I am computer literate including major software

systems including Microsoft Word, Excel, Project, and Suretrak, P3 and/or P6 and have a working

knowledge of Prolog and GE PNET. I have experience in processing RFIs, Submittals, progress

billings, Drawings, Specifications, producing and/or reviewing Inspection Reports, Construction

Schedules, Punch lists, O & M Manuals. I am knowledgeable in construction practices including

construction codes, cost breakdown, estimating, negotiating, and technical writing. All

ASME/AWS welding procedures/NDE testing applicable to power plant construction. Knowledge

of crane and rigging techniques and practices and am able to develop extensive critical lift plans., ••

Jay Luna

Objective: Skills

Obtain a Position as a Mechanical Supervisor/Technical Advisor. To share my knowledge and

heavy industrial experience in a team environment where Safety is valued above all while also

assuring Quality and customer satisfaction. I have dealt with heavy industrial mechanical projects

my entire career and I know what it takes to bring one in on time and under budget. I have worked

o n turbines extensively for 15 years. I have gone through pre construction planning, erection,

construction and start up/commissioning Support. Perform well in outage type environment fast

paced and under pressure. I am computer literate including major software systems including

Microsoft Word, Excel, Project, and Suretrak, P3 and/or P6 and have a working knowledge of Prolog

and GE PNET. I have experience in processing RFIs, Submittals, progress billings, Drawings,

Specifications, producing and/or reviewing Inspection Reports, Construction Schedules, Punch lists,

O & M Manuals. I am knowledgeable in construction practices including construction codes, cost

breakdown, estimating, negotiating, and technical writing. All ASME/AWS welding procedures/NDE

testing applicable to power plant construction. Knowledge of crane and rigging techniques and

practices and am able to develop extensive critical lift plans.

Experience

08/2009 thru present Shanahan Engineering Surgut, Russia

Chief Mechanical Turbine Engineer

I currently hold the position of Chief Mechanical Turbine E ngineer on a GE/Gama Power joint

venture. It is a 440 Megawatt single shaft combined cycle power plant consisting of two GE frame

9EA Gas turbines, two GE D10 steam turbines and two GE hydrogen cooled 390 50Hz Generators

I built and update the project schedule. I Coordinate craft and daily work activities. Inspect and

supervise Turbine/Generator assembly to meet both GE warranty requirements along with Russian

standards. Liaison between GE and Gama Power. Provide technical insight to both parties on

successful construction practices.

12/2007-07/2009 Teton Industrial Foreman,AR

Area Superintendent

Area Superintendent on 300 million dollar Ash grove Cement plant expansion. Held position where

mechanical superintendent and crane and rigging superintendent were my direct reports. I

supervised and reported on the mechanical instillation as well as being responsible for all of the

project lift plans and critical lift plans. I was responsible for the safety of 300 Craft personnel.

I was responsible for client coordination and maintaining schedule as well as the coordination of

other craft discipline and sub contractors. Equipment installed includes vertical roller mills, ID fans,

compressors, belt conveyor, pan conveyor, and bucket conveyor. Cranes overseen are Manitowoc

888 ringer, 999, 2250 luffer, 3900, 4100 and 4000 tower with luffer. Link belt 298 and 248. Favell

Favco M760D Luffing Tower.

10/2006-12/2007 Teton Industrial Cross,SC

General Superintendent

General Superintendent over 75million dollar mechanical equipment and pipe contract at Santee

Cooper Cross Generating Station Unit 4 600MW pulverized coal fired power plant and completed an

additional 11million worth of change order work for Unit 3. I was responsible for overall site Safety

and execution of contract. Assured and maintained project schedule, monthly progress billings,

home office reporting. Kept good standing client relations. All craft discipline superintendents were

under my direct report. Was awarded safety achievement for zero lost time and zero recordables in

4 million man-hours.

08/2004-10/2005 LPR Construction Monah,UT

Project Superintendent

Project superintendent over the construction of a GEA 30 Cell Air cooled condenser at PacifiCorp

525 MW Current Creek Power Project. I was responsible for the safety, quality and productivity of

multi discipline craft including civil concrete, iron, pipe, boiler maker and millwright. I was

responsible for schedule updates, cost reporting and forecast and client reports.

09/2003-08/2004

Slattery Skanska

Astoria,NY

Lead Turbine Engineer

812-***-****• *******@***.***

Jay Luna

Held position of Lead Turbine Engineer on the New York Power Authority Charles Poletti 500

MW 2 o n 1 c ombined c ycle p ower p lant i n A storia Q ueens. E quipment w as t wo G E 7 FA

g as turbines a nd G E D 11 s team t urbine. I w as r esponsible f or t echnical d irection o f l ocal

u nion trades. Created schedule for turbine instillation, rules of credit for progress payment

a nd sub contract for heavy haul and turbine lifts.

11/2002-08/2003

S&C Lavalin Thermal Power

Gila Bend,AZ

Turbine Superintendent

Millwright Superintendent on 1 billion dollar Panda Energy 2200 MW natural gas fired 8 on 4

Combined cycle power plant. Was responsible for the equipment instillation consisting of 8

GE7FA gas turbines and 4 GE D11 single flow axial exhaust steam turbines and 4 Alstom

condensers. I was responsible for the safety, quality and production of over 300 craft personnel.

08/2001-11/2002

NEPCO

Dell,AR

Millwright Superintendent

Millwright Superintendent in charge of mechanical equipment instillation and TECO Dell

600MW combined cycle power plant. Equipment included 2 GE7FA gas turbines and a GE D11

Steam Turbine. Braden Filter houses and all BOP Equipment. Due to the ENRON collapse plant

work was suspended @ 90% complete.

02/2001-07/2001

PCE Constructors

Southport,FL

Millwright Superintendent

In charge of the safe instillation of 2 GE 7FA gas turbines and 1 D11 steam turbine at southern

company Lansing Smith3 combined cycle power station. Also in charge of condenser fabrication

and BOP equipment.

01/2000-02/2001

PCE Constructors

Campbell,MO

Project Superintendent

Responsible for all craft discipline during the construction of AECI 256MW single shaft combined

cycle power plant St.Francis unit 2. Developed project safety plan and project execution plan.

Wrote, issued and managed sub contracts for civil and electrical work. Constructed and

maintained project schedule and monthly budget reports and client billing. Installation and erection

including: A SIEMENS V84.3A Combustion TG Set-Single Shaft Combined Cycle Power unit

consisting of

One HP/LP steam turbine; clutch and condenser; Gas Turbine: Generator and auxiliary equipment

to support turbine.

2. Foundation and Underground Installation – Scope includes furnishing and installing

foundations, including 2200 cy turbine pedestal, and underground piping systems – firewater,

storm drains, water and process lines, fuel gas, sanitary sewers, and circulating water.

03/1999-01/2000

PCE Constructors

Choteau,OK

Millwright Superintendent

520 MW Power Generating Station for AECI.

Installation and erection including: two (2) Siemens V84.3A Combustion TG; one (1)

HP/LP K Series Steam Turbine and Generator with saddle bag Condenser; all auxiliary and

BOP equipment; Braden air inlet filter houses.

07/1995-01/1998

SIEMENS

Monterry,Mexico

Field Service Technician

Field Service TA for Siemens Turbine Division. Performed Routine Scheduled Maintenance

And inspections on various equipment at the Monterrey Mexico power plant as required. Took

care of warranty related issues and outage support.

812-***-****• *******@***.***

Jay Luna

Refrences

Mark Holloway General Electric-Lead Engineer Surgut

+798********

****.********@**.***

Robert Brewer Turbine Engineer Shanahan Engineering

+796********

*.******@*********.***.**

*****.***@*****.***

Grey Mayfield QA/QC Manager Teton Industrial

*********@***************.***

770-***-****

Tony Mydland Corporate Director of Quality Teton Industrial

*********@***************.***

770-***-****



Contact this candidate