SUMMARY OF QUALIFICATIONS
A versatile, detail oriented engineering professional with 23 years of
broad-based project management, maintenance, and engineering leadership
experience. Significant working knowledge of facility design, productive
maintenance, labor and waste reduction, material handling, machinery
automation, and continuous process improvement. Proven track record of
being a high energy, hands-on leader with a can-do attitude who creates
innovative cost savings solutions that produce lasting improvement.
Diverse experiences as a manager and front-line engineer in food and
technical manufacturing environments as well as an independent contractor
has enabled a solid overall business understanding, exceptional people/team
development skills and a focus on driving results and exceeding customer
expectations.
EXPERIENCE
Independent Contractor Nov 08 - Present
Developed, designed, installed, and documented custom engineering
solutions for customers.
. Designed and installed a complete new dust extraction
ventilation system for Delta Company.
. Developed a comprehensive safety and health program to comply
with OSHA regulatory requirements for an agricultural supply and
manufacturing fabrication company.
. Engineered and managed the construction of a new automotive
repair shop with all utilities, compressed air, paint-booth,
office area and lighting.
. Provided project management oversight for property modifications
at NP Dodge Company that met or exceeded expectations.
ROTELLA'S ITALIAN BAKERY - Omaha, Nebraska May 03 - Nov. 08
Project Director
Managed critical company capacity, cost savings improvement projects
and process improvement engineering in a 202,000 sq. ft. bakery
facility that operated 24 hours a day.
. Initiated and lead a five year lean manufacturing and waste
reduction project that eliminated 18% of packaging waste
and over 21% of raw material waste.
. Developed and implemented an AutoCAD drawing database for a
21+ acre campus that included all buildings, equipment,
mechanical, utilities and safety systems.
. Managed the installation and construction of a highly automated
high speed bakery and warehouse facility that increased bread
production capacity by over 56%.
. Designed and initiated a build to order maintenance parts
supplier program for capital intensive, long lead-time, OEM
specialty equipment that drove savings of $65,000K annually.
. Managed maintenance of all material handling equipment and
improved up time by 19%.
. Developed and managed a bi-lingual quality control verification
system for national and key supplier accounts that improved food
traceability and reduced customer complaints by 13%.
. Initiated and installed a water reduction program with
the city of Omaha that saved $40,000 yearly.
NEXTERNA (a Union Pacific Company), - Omaha, Nebraska March 2000 -
Feb. 2003
Quality Manufacturing Coordinator
Managed the manufacturing operations on all out sourced global
positioning and telecommunication equipment for six product lines
including vendor management, engineering design, purchasing and
performance/quality assurance.
. Implemented a lean manufacturing out-sourcing program that
reduced staffing requirements and saved $250,000 annually.
. Developed and implemented a hardware manufacturing system with
external printed circuit board manufacturer that resulted in an
82% capacity increase in electronic GPS hardware.
. Provided leadership and documentation for the company-wide ISO
2001 quality manufacturing program.
. Identified and lead, in conjunction with IT and Customer
Relations partners, remediation of a supplier quality issue that
reduced defects by 33% and improved first-pass quality by 31%.
POWER PICK INTERNATIONAL - Lincoln, Nebraska Sept. 1998 - Feb. 2000
Operations/Project Manager - Manufacturing Division
Managed conveyor and storage systems projects from conception to
completion including customer needs analysis, solution sales, system
design, installation and performance/quality assurance.
. Managed the construction of a new 24,000 square foot combination
office and warehouse building that was awarded a national honor
from the Steel Building Builders Association.
. Consulted and executed cellular manufacturing layouts and
manufacturing work cells for two fortune 500 companies which
resulted in full project pay-back savings in less than 18
months.
. Redesigned four warehouse/manufacturing operations to streamline
workflow operations, reduce work in process, and reduce non-
value added labor that saved $120,000.annually.
. Lead process capability analysis to identify potential labor
savings by leveraging lean manufacturing principles and process
automation that improved throughput labor hour by 19%.
LOZIER CORPORATION - Omaha, Nebraska May
1985 - Sept. 1998
Engineering / Maintenance Supervisor (1992 -1998)
Facilities engineer and maintenance manager for a two shift
maintenance department and managed 7 direct reports with
responsibilities for industrial / engineering, manufacturing, CNC
programming, strategic capital planning, capital budgeting, quality
and vendor management..
. Executed a three-year, plant-wide floor restructuring plan of a
custom sheet metal manufacturing operation that saved $67,000
annually through increased utilization of single piece assembly,
maximization of CNC and laser capability, and reduction of work
in process.
. Developed the engineering department from the ground up in a
300,000 square foot facility including development of
organization structure and position descriptions, selection and
training.
. Reduced paint consumption by $140,000 annually through
implementation of a computer controlled purging system for multi-
color liquid paint.
Senior Manufacturing Engineer / EPA Coordinator (1985 -1991)
Managed all machining operations, engineering and safety for a 170,000
sq. ft. wood fixture manufacturing operation and provided leadership
EPA compliance oversight for seven manufacturing plants throughout the
United States.
. Developed a new single piece process assembly production line
for a start up aluminum showcase line with first year sales of
over $650,000.
. Coordinated relocation of a 170,000 sq.ft. manufacturing
operation that included all new utilities, painting and dust
extraction systems without interrupting production while running
full manufacturing work load.
. Initiated development of a wood waste grinding system that
generated incremental annual sales of $42,000.
. Provided leadership for redesigning the safety program which
resulted in a total incident rate of less than 1 for 2
consecutive years (lowest in the company and significantly lower
than the national average of 5.3).
. Reduced excess raw materials inventories from $360,000 to
$30,000 in one year.
EDUCATION BS Industrial Engineering Technology, University of
Nebraska Omaha
PROFESSIONAL Certified (NIOSH) 24-Hour EPA Incident Commander
Certified First Responder (Red Cross)
AFFILIATIONS Senior Member SME, Society of Manufacturing Engineering.
Project Management Institute PMI