OBJECTIVE: Scheduler
Summary of Qualifications
. Microsoft Office, Primavera P6, P3, SureTrak, & Microsoft Project.
. 5 years of supervising / operating & maintenance of a small power
plant in the Navy.
. 5 year experience in operating & maintaining small & medium equipment.
. Skilled in construction carpentry.
. Maintenance planner for construction worker for two paper machines
. Projects included: installing converting lines, palletizer, paper
machine shutdowns
. Projects included: liquid making system, powder making systems,
liquid packing lines, powder packing system
. Projects included: food processing, food packing lines
. Projects included: fire main, controls replacement, electrical
upgrades
. Issuing contracts and progress payments for work completed.
Work History
Westaff, Albany, NY 07/10 to
present
Worker at a manufacturing plant producing bubble wrap material and
padded envelopes. Working in the warehouse and different lines as
needed.
Wal-mart, Halfmoon, NY 06/10 to
present
Sales Associate on the overnight shift. The overnight shift helps
the
customers and restocks the shelves for the next day.
C.R. England, West Valley City, UT 2009 to
2010
Semi tractor driver pulling a 53 foot refrigerated trailer, drove
thru 40 States.
Think Resources, Norcross, GA 2008 to
2009
Scheduler, contract by Think Resources to Parsons Corp. Worked on the
ThyssenKrupp Steel Plant in Calvert, AL. Used P6 and MS Project to
track
the subcontractors and updated the schedule with the progress made
by the subcontractors.
Aztec Technologies, Ballston Spa, NY 2008 to
2008
Take hourly reading on burner that was used for burning contaminated
soil
to remove the contaminations.
Think Resources, Norcross, GA 2008 to
2009
Scheduler, contract by Think Resources to Haskell Corp., Moses Lake,
WA.
Rebuilt the construction schedule for part of the REC Silicone
processing
plant using P3.
Fru-Con Construction Corp., Ballwin, MO 2005 to
2007
Project Engineer and Scheduler at multiple sites for repairing
damages from
Hurricane Katrina and Hurricane Rita. The work included running
maintenance
on a trailer city and the support equipment for it. Roof
replacement that
covered 14 acres and building repairs using MS Project.
EOC Builders, Inc., Slidell, LA 2005-
2005
Residential Carpenter, work on repairing houses after Hurricane
Katrina.
Fru-Con Construction Corp., Ballwin, MO 2004-
2005
Worked doing Construction Completion Inspection (CCI) and Scheduling
at multiple job site. The CCI was for major plant upgrade.
Scheduling, using
P3, was for making system upgrade where down time was critical.
Habitat for Humanity - East St. Tammany Parish, Slidell, LA
2004-2004
Residential Carpenter & help coordinate volunteers for 6 houses.
Fru-Construction Corp., Ballwin, MO 1990-
2003
Industrial Plants and small power plant doing planning work,
estimating, material take-off, scheduling, ordering material, cost
engineer tracking the cost, earned valve and payment approval, CCI
and walk down with the owns for final acceptance. The scheduling
programs used were Finest Hour, P3, MS Project, & Sure Trak.
Education:
Louisiana Tech University, Ruston, LA
Degree: Bachelor of Science, in Construction Engineering Technology
1983
Military Experience:
U.S. Navy - San Diego, CA Honorably Discharge
1990
Engine Room Operator / Work Center Supervisor 1984 to
1990
/ Oil-Fuel-Boiler King
Computer Programs:
Microsoft Word & Excel
Microsoft Project
Primavera P3.1 & Sure Trak
Primavera P6