PETER VANDEMOTTER
*** ******* ******, ********* ** 60060 847-***-**** cell
Electrical Engineer, Power and Control, Facilities. Email:
abltfj@r.postjobfree.com
SUMMARY: Electrical Engineer with several years of experience in design of
facilities, Industrial and Commercial. Experience includes all facets of
facility electrical design from initial survey, through design (using
AutoCAD and other design tools), specification, bid analysis and shop
drawing review to final commissioning. Familiar with National Electrical
Code and UL standards. Actively pursues continuing education
opportunities. Seeking long term opportunity with firm having good growth
prospects.
LICENSED PROFESSIONAL ENGINEER, State of Illinois, Indiana, Ohio,
Wisconsin
EXPERIENCE
Sept 2008-Oct 2009 Greeley & Hansen, Chicago. Electrical Engineering
for Wastewater plants and Municipal Garage. Duties
included
Power Studies, Design of distribution, Specifications, Generator
sizing, and coordination with Utilities. Work with
MV motor control, steam recovery turbine interface.
June 2008-Aug 2008 Ambitech Engineering Corp. (through Salem)
Electrical Engineering for Industrial clients
April 2006 -May 2008 Singh & Associates, Chicago, Various
transportation infrastructure projects,
including Roadway lighting, Toll Plaza
renovation, Street-lighting. Field
Assistance during Construction
Feb.1998 - March 2006 BLM Engineers Inc, Bensenville IL
Project Engineer. Designed and reviewed
electrical systems, including
Power, lighting, fire alarm and security,
for Hospitals and commercial clients.
Conducted assessments of Electrical Systems.
Provided field assistance during construction
and Commissioning. Electrical Engineer of
Record on "Sears On State", Wrigley Building
Power Upgrade. Morton Grove
Pharmaceuticals plant electrical.
May 1995 - Jan 1998 Raymond Consulting (Beling Consultants)
Chicago IL
Designed and evaluated electrical systems for
government clients.
Projects included laboratory, Waste Treatment,
Roadway lighting
Jan 1995 - May 1995 ASC Services. Electrical design for telecon
facilities
August 1994-Jan1995 Pickus Construction, Waukegan IL. Quality
Control Manager. Responsible for setting up and
monitoring Quality Control Plan during project at
Great Lakes Naval Training Center.
April 1994-July 1994 Sterling Engineering, Westchester IL. Several
Industrial projects,
involving power and control for motors, panel
layouts, PLC programming, and field assistance. Use
of AutoCAD up to ver. 12.
Jun 1993- Feb. 1994 Various temporary assignments involving design
for local architectural/engineering
Firms.
Feb. 1990-Apr 1993 John Brown, Chicago IL Senior Electrical Engineer
Responsible for power distribution, equipment
specification, and grounding on Industrial projects,
Chemical and Petroleum. Intensive use of CADD,
other design tools.
Nov 1989-Jan 1990 Sargent & Lundy, Chicago IL. Temporary assignment
in Substation Group
EDUCATION:
Rose-Hulman Institute of Technology, Terre Haute IN
Bachelor of Science, Electrical Engineering;
MEMBERSHIPS
IEEE Senior Member, IAS Chicago Section Chair 2004-05
Consulting Electrical Engineers Member