Jason Medina, PE
Elk Grove, CA 95624
Phone: 916-***-****
Email: ablshx@r.postjobfree.com
Summary of Qualifications:
BS, EEE registered in California as an electrical engineer with 15
years of experience and knowledge in project management, operations,
manufacturing, electrical design and instrumentation, control systems
programming and configuration, construction, engineering and
consulting.
Licenses/Special Courses:
. Bachelor of Science, Electrical & Electronic Engineering, CSU
Sacramento
. Professional Engineer, California. Registration No. E18728
. Allen-Bradley PLC5/SLC500 System Fundamentals course
. Rockwell Automation RSLogix 5/500 PLC Programming course
. Rockwell Automation RSLogix 5000 for DeviceNet/PowerFlex VFD seminar
. Wonderware (ArchestrA) Application Server 3.1, Device Integration
Products course
. Control Microsystems DNP3 Protocol seminar
. PG&E Lighting Fundamentals, Controls seminar
. CWEA Arc Flash Analysis, Personnel Protective Equipment (PPE) Seminar
Employment History:
Senior Engineer Aug '09 - July '10
Westin Engineering Rancho Cordova, CA
Prepared and drafted electrical, process and instrumentation drawings
using AutoCAD. Programmed, debugged and documented Allen-Bradley
Controllogix programmable logic controllers (PLC) and operator
interfaces (OI) using RSLogix 5000. Configured Wonderware InTouch
Human Machine Interfaces (HMI). Surveyed radio communication systems
and provided engineering studies for pathway propagation and signal
strength calculations using Softwright Delorme and Google Earth
software.
Industrial projects:
. Clean Water Coalition, NV (Controllogix PLC programming for large
multi-agency water conveyance system, bench testing and documentation)
. Mojave Water Agency, CA (prepared and reviewed electrical power
distribution, UPS systems, SCADA control room layout drawings plus
drafting)
. Los Angeles County Department of Public Works, CA (surveyed large RTU
radio system of 60 sites and provided studies. Organized P&ID
workshops and prepared electrical system drawings plus drafting.
Configured SCADA HMI upgrade from legacy InTouch tags screens to
Wonderware ArchestrA objects.)
. City of Ottawa, Canada (surveyed coordinates of old radio tower
location with 40 RTU's to provide engineering study and
recommendations for reliable radio spectrums plus new radio tower and
repeater locations)
. Rancho California Water District (Asset Management of vehicle fleet
and program planning)
Engineering Contractor July '09 - Aug '09
ECS, Engineering Inc. Elk Grove, CA
Provided engineering plan check services to assist ECS Engineering
that was completing construction design bid packages on its largest
water treatment facilities to date.
Industrial projects:
. Linda WWTP, Yuba City, CA
. Indian Springs, CCWRD
. Hughson, CA Well 8
Instrumentation & Controls Systems Designer Mar '09 - July '09
MCC Control Systems Vacaville, CA
Coordination, design and AutoCAD drafting of electrical drawings
including: control panels, back panel layouts, interconnection
diagrams, Process and Instrumentation Diagrams (P&ID), loop drawings
and block diagrams. Prepared BOM and O&M manuals using MS Word,
Excel and Adobe PDF.
Project Manager / Senior Electrical Engineer 2005-2009
Interface Engineering Incorporated Engineering Consultants
Sacramento, CA
Managed project schedules, resources and budgets to ensure that
information, Scope and Tasks were assigned and distributed to all the
design and construction stakeholders. Completed engineering reviews of
contractor Requests for Information (RFI), equipment submittal
packages, and Change Order Requests (COR). Conducted onsite surveys,
peer-engineering firm reviews, plan checks, redesigns, prepared
budgetary estimates and planning proposals with consulting and
engineering recommendations. Drafted SCADA PLC based control system
strategies, prepared owner standards, witnessed factory and field
acceptance testing, provided electrical inspection services, and
organized and attended construction meetings.
Prepared, quality controlled, specified, designed and drafted complete
electrical drawings with reference to UL, NEC and NFPA that includes:
Process and Instrumentation Diagrams (P&ID), conduit routing and
schedules, power distribution and circuit protection, UPS power and
diesel generator systems, switchboards, motor control centers,
process, instrumentation and control panels, PLC cabinets, SCADA
network and communication block diagrams for PLC-based control systems
that automated and monitored industrial water wastewater pumping
stations, MGD treatment facilities and Remote Telemetry Unit (RTU)
networks.
Industrial projects:
. Hangtown Creek Water Reclamation Facility Improvements - Placerville,
CA (2006-2009). Provided the electrical, instrumentation and control
system design and administrative construction management services to
inspect and direct the construction of new facilities including
electrical equipment, control panel testing and startup. The existing
plant's new capacity is between 2-4 MGD, and the expansion
improvements included adding new headworks, primary and secondary
clarifier, biological nutrient removal facilities, ultra-violet
disinfection, solids dewatering and digestion, and effluent cooling.
The plant now has an Ethernet based Controllogix PLC control system
for its new RS FactoryTalk SCADA HMI system to monitor plant processes
and operations. The Plant is forecasted for final commission in April
2009.
. Auburn Water Treatment Plant Expansion - Auburn, CA (2005-2008).
Provided the electrical, instrumentation and control systems design
and administrative construction management services to inspect and
direct the construction of new water facilities including electrical
equipment, control panel testing and startup. The existing plant's
new capacity is between 7-14 MGD, and the expansion improvements
included new raw water screens, a raw water pump station, modular
factory-built Actifloc treatment units, 600,000 gallon filtered water
clearwell, backwash pumps, high service pumps, solids thickener, and
centrifuge dewatering. The plant has a new GE iFIX SCADA system
networked with an Ethernet based Controllogix PLC control system. The
plant was successfully commissioned in April 2008.
. Foothill Raw Water Tunnel Pump Station -Auburn, CA (2005-2008). The
pump station includes two separate pumping facilities in an 11400
square foot building, a 1.25 million gallon water storage basin and
electrical substation. Water is drawn from any of nine 36-inch
diameter shafts connected to the tunnel 200 feet beneath the surface
to source the Foothill Raw Water Treatment Plant and the Dutch Ravine
Canal System. Provided onsite electrical inspections, witnessed
factory testing of control panels, electrical design peer review and
administrative construction management services.
. South County Regional Water Agency Wastewater Plant Improvements -
Gilroy, CA (2007-2008). Provided the Agency with budgetary estimates
and electrical design proposals to expand the existing plant with a
new membrane bioreactor (MBR) facility plus improvements for a faulty
fiber optic communications backbone.
. City of Hollister Wastewater Plant Expansion - Hollister, CA (2005-
2008). Provided the electrical, instrumentation and control systems
design with administrative construction management services to inspect
and direct the construction of new water treatment facilities plus
electrical equipment. The plant expansion included a new 5 MGD
membrane bioreactor (MBR) allowing the plant to produce extremely high
quality water for reuse in the local community. A Controlnet based
Controllogix PLC control system was implemented for an improved
Wonderware SCADA system to monitor plant processes and operations.
The plant was successfully commissioned in July 2008.
. Highlands Reserve North Pump Station - Roseville, CA (2006).
Provided electrical engineering services to plan, design, specify and
inspect a factory-built, above ground water booster pump station. The
station control panels are Modicon Quantum PLC-based and with Ethernet
configuration to communicate with VFD's, OIT's, MCC Power Monitors and
an existing radio telemetry/TransDyne SCADA system that provides
remote monitoring and control. The Station was successfully
commissioned in February 2007.
Project Manager / PLC Applications Programmer/ I&C Designer 2000-
2005
TESCO Controls Inc. Sacramento,
Ca
Managed project schedules, resources and budgets to ensure the project
information, scope and tasks were assigned and distributed to all
stakeholders within the company's administrative, production,
engineering, programming and construction departments. Over a five
(5) year period, successfully completed projects on time and within
budget. My work netted TESCO brand preference from several utility
managers plus returned a 25% increase in revenue over a period of two
(2) consecutive years. The success was due to an efficient and
repeatable process of identifying problems and risks upfront,
delivering what was agreed upon in scope, collecting information to
sense how projects were progressing, determining if deliverables
produced are acceptable, and holding stakeholders accountable for
their level of responsibility. Also assisted in project construction
planning, contractor coordination and meetings, startups and owner
site trainings.
Programmed Allen-Bradley, TESCO Control, and Modicon programmable
logic controllers (PLC) and operator interfaces (OI) using Process and
Instrumentation Diagrams (P&ID), project engineering specifications
and or control strategies. Coded and documented PLC ladder logic for
Allen-Bradley: ControlLogix, CompactLogix, PLC 5, sLC500, and
MicroLogix PLC using Rockwell Automation Software: RSLogix 5000, 500
and 5. Configured and commissioned Allen-Bradley PanelView and
PanelView Plus operator interfaces using PanelBuilder and RSView SE
software. Scripted high level programming logic for TESCO L2000 and
LIQ III, IV, V series programmable controllers and operator
interfaces. Setup and tested Schneider-Modicon series Quantum and
Momentum PLCs to establish third party PLC-to-PLC data exchange with
other Allen-Bradley or TESCO controllers. Completed two (2) weeks of
Rockwell Automation classroom training for Allen-Bradley PLC5 / sLC500
Systems covering PLC Architecture, systems fundamentals, ladder logic
programming and simulation, relay ladder logic, and industrial
communications networks. Assisted in configuring, modifying and
debugging Wonderware InTouch 7.0 Human Machine Interface (HMI)
screens, tags and scripts during project startups and acceptance
witnessing.
Prepared electrical drawings using AutoCAD 2000/2002/2004. Created
Operation and Maintenance (O&M) Manuals, project equipment Submittals,
Request for Information (RFI), Change Order Requests (COR), ISA
instrument loop test forms and Acceptance Testing procedures using MS
Office Word and Excel. Designed and drafted control panel elevations
and equipment layouts for Main Switch Boards, Motor Control Centers,
PLC Control Cabinets, instrument panels, control interfaces and
retrofits. Created electrical wiring diagrams for: plant electrical
interconnection, power distribution and circuit protection,
transformers, motor starters, VFDs, process and instrumentation
signals, HMI displays, controllers, PCs, and LAN/WAN network and
communication block diagrams. Provided complete project
documentation, and quality control standards with reference to UL, NEC
and NFPA.
Conducted communication surveys to test signal strength of licensed or
unlicensed spectrum point-to-point (P2P) or point-to-multipoint (P2MP)
radio systems.
Industrial Project (Short List):
. Cache Creek Casino (Well Sites, Tank Site. Design SWBD, MCC and
Control Panels plus Allen-Bradley sLC505E PLC Programming/Panelview
OIT configuration)
. City of Clovis (Booster Stations, Well Sites, Tank Sites. Design MCC
and Control Panels, RTU Improvements, plus Tesco L2000 PLC
programming, modifications and OIT configuration)
. City of Morgan Hill (Wonderware SCADA System plus Tesco L2000 RTU
panel Improvements)
. City of Pleasanton (Lift Stations. Design SWBD, MCC and Control
Panels, Tesco RTU panels Improvements)
. City of Sacramento (Lift Stations. Design SWBD, MCC and Control Panels
plus Modicon PLC testing)
. City of Woodland (Well Site. Design MCC and Control Panels plus Allen-
Bradley sLC505E PLC Programming/Panelview Plus OIT configuration)
. County of San Diego (Lift Stations. Design MCC and Control Panels)
. Elk Grove Unified School District (Lift Stations. Design SWBD, MCC and
Control Panels plus Allen-Bradley sLC500 PLC testing)
. Placer County Water Agency (Booster Station. Design SWBD, MCC and
Control Panels plus Allen-Bradley Controllogix L55 PAC Programming)
. Sacramento County Sewer District-1 (Lift Stations, Storm Water
Stations. Design MCC and Control Panels plus Modicon Quantum PLC
testing)
. Sacramento County Water Agency (Well Sites, Ground Water Plants.
Design MCC and Control Panels plus Allen-Bradley sLC500 PLC testing)
. Quartz Hill Water District (Well Sites. Design MCC and Control Panels
plus Security Camera Radio telemetry panels)
. Woodbridge Water District (Wonderware SCADA System plus design and
programming Tesco RTU panels)
Line Maintenance-Electronics Technician 1999-2000
NEC Electronics Roseville, Ca
Machine and equipment preventive maintenance and testing procedures,
quality control inspections, repair and troubleshooting of automated
low and high voltage electrical mechanical machines (conveyors,
sorters, steppers, heaters, developers, maskers, and washers)
processing millions of integrated circuits on silicon wafers for the
second largest global chip manufacturer.
Operations Supervisor 1995-2000
UPS West Sacramento, Ca
Supervise 50 package handlers and drivers plus provided training to
promote OSHA safety standards and to maintain production goals for
large 200, 000 sq ft parcel receiving and shipping facility. All
parcels were logistically tracked and distributed across northern
California, the United States and internationally.
Education:
Bachelor of Science, Electrical and Electronic Engineering
1998-2001
California State University, Sacramento
Honor Roll
Undeclared Engineering Studies 1994-1996
University of California, Davis
High School Diploma 1989-1993
San Joaquin Memorial High School, Fresno, CA
Honor Roll, 1st Team All-City/County Varsity Boys Basketball 92-93