Post Job Free
Sign in

Manager Maintenance

Location:
Orlando, FL, 32822
Posted:
August 29, 2010

Contact this candidate

Resume:

Robert A. Harper

**** ******* **. *******, ** *2822

Home: Phone 407-***-****

E mail: ablom2@r.postjobfree.com

Facility Management

. Evaluate, setup, and manage cost saving projects

. Setup contract, purchase, and service agreements

. Setup, evaluate, and operate an annual budget

. Employee hiring, training, and evaluation also union shop setup

. Internal and third party staff management

. Preventative maintenance program setup and operation

. Lockout/tag out, and confined space program setup and training

. Health and safety manager

. Corporate auditor ISO 9000-9002

. Experience with CMMS, and Maximo

. MS word, excel, Outlook 2007

Professional overview:

Premier Manufacturing Support Service, Facility Manager, 2007-2009

Maintaining the High Velocity Center for Ford Motor Co. The position would

be to cover all functions of the facility, and maintain the ready status on

all equipment. The necessity to start a preventative maintenance program

for both in house and outside contractors this would cover the building and

all equipment. The position also required the setting up and over seeing an

annual budget for the day to day expenses to operate. Another segment of

the position required the setting up of agreements and contracts for the

facility. During my time with the facility I renegotiated all standing

contracts and agreements that were in place at that time and realizing a

cost savings for Ford and Premier. At Fords request I over saw any projects

for them making sure that safety and standards were maintained. The last

part for the position covered record keeping and accountability for all

work performed and expenses incurred with the maintaining of the facility

this also included the hiring of custodians for the facility to maintain

Ford standard and unionize them for the UAW.

Cutrale Citrus, Electronic Technician, 2007-2007

. Repair and maintain the electrical production equipment for blending

and mixing and packaging of citrus products. The equipment used in

this is high speed labeling and filling.

. This covered a wide range of sensors, timers, high speed labeling and

general electrical maintenance repair. The position was a rotating

shift including weekends.

Windoor Inc., Maintenance Manager, 2004-2006

The position was a hand on manager over seeing the maintenance of the

production equipment which covered the pneumatic cutting, punching, and

forming equipment in the facility along with the upgrading of the

equipment. The purchase of high accuracy sawing equipment for production,

and the installing of electrical and control cable for the equipment. Along

with the maintenance the hiring of personnel and contractors for the

facility. Another segment of the position required the purchasing of the

safety and day to day supplies.

. The setting up of a preventive maintenance program along with a work

order system for the facility equipment.

. Maintaining the rolling fleet for the facility this consisted of

forklifts, pickup trucks, mules and trailers.

. Setup service agreements with vendors and contractors to perform

necessary work in the facility.

. Safety manager for the facility which included the training of

employees and purchasing of supplies.

Florida Extruders Inc., Plant maintenance, 2002-2004

Performing the maintenance for the window division which took in the paint

line, glass cleaning, glass cutting, and window assembly line also the

shipping floor along with the waste treatment plant upgrade.

. Setup and managed projects along with upgrades to the window division.

. Re-piping and adjusting the system at the waste treatment plant to

operate and upgrade the unit for efficiency. After the projects were

complete the county and state inspectors gave me high praise for the

condition of the waste water being sent off site to their facility.

. The other upgrades for the paint line included the installing of a

water purification system, and the realigning of the spraying system

in the wash tunnel, also the drying and curing tunnels air movement.

. Management of weekend maintenance and cleanup crew which on an average

was a 50 man crew which also included the quality control department

on the paint line. I instructed them on how to complete inspections

and set up the wash tunnels for the material to be cleaned and

painted.

. The rebuilding and insalling of all sawing, drilling, cleaning and

forming equipment.

Previous Employers:

Unocal, Rohm Haas, Emulsion systems Inc., Cook Composites and Polymers,

Different owners of the same facility in Illinois and Florida. The

locations were chemical facilities producing a wide range of polymers for

industry. The Cook Composites and Polymer facility in Florida manufactured

Gel coat. The positions in Illinois were hands on maintenance and

maintenance manager also safety manager. Cook Composites also requested a

transfer for a facility upgrade in Florida, California, and Washington.

Certifications:

. 29 CFR 1910.146 confined space, 1993, 1994, and 2000

. 40 CFR 265.16 (RCRA Training) 2000

. 29 CFR 1910.120 (HAZWOPER) 8 Hour Refresher 2000

. 29 CFR 1910.120 24 Hour Hazardous Waste Site Visitor 1994

. 29 CFR 1910.120(e) 8 Hour Refresher 1997, 2000

. 29 CFR 1910.120 (HAZWOPER) First Responder-Operations Level 1991

. 29 CFR 1910.120 First Responder Awareness Level 1994

. Triton College Voluntary OSHA Compliance 1994

Experience with the following Equipment:

. Wide assortment of pump applications: Air double diaphragm, gear,

positive displacement, metering, piston, lob, split case centrifugal

single and multi stage, magnetic drive, vacuum, lift station and

turbine

Sandpiper, Wilden, Bran+luebbe, Viking, Sihi, Gould

. Pneumatic controls, configuring and installing for existing and new

equipment: ASCO, Speedaire, Parker Hannifin, Gast, ARO, Parker

. Compressor maintenance 125-3400 psig: piston and rotary screw,

Ingersoll Rand, Gardner Denver, Katy, Speedaire,

. Drives for conveyors roller, belt and bucket

. Machine alignment: straight edge, feeler gauge, dial indicator:

Starrett, Mitutoyo

. Chemical equipment setup and maintenance: glass lined, jacketed,

stainless steel, poly

. Boilers low and high pressure systems: 2-Clever Brooks 350, 125-150

psig Heat tracing, process tank jackets, building heating

. Chillers and cooling towers: Carrier and Marley

. Electrical distribution 115 VAC to 480 VAC



Contact this candidate