Post Job Free

Resume

Sign in

Quality Assurance Project

Location:
Stillwater, OK, 74075
Posted:
August 15, 2010

Contact this candidate

Resume:

ADITYARAJ PUROHIT

*** *. **** ******, *** H-**, Stillwater, OK 74075

e-mail:ablmch@r.postjobfree.com Tel: 405-385-

1734

SUMMARY:

Green Belt Lean Six Sigma, Experience in 5S, Value Stream Maps, Waste

Reduction, Cell Design and Assembly Processes.

EDUCATION:

Master of Science - Industrial Engineering and Management

Aug 2008- Jul

2010

Oklahoma State University, Stillwater, Oklahoma

GPA: 3.69/4.0

Bachelor of Engineering - Mechanical Engineering

Aug 2002

- Jun 2006

Mumbai University, Mumbai, India

GPA: 3.8/4.0

EXPERIENCE:

Student supervisor, University Dining Service, Oklahoma

Aug

2008-Jul 2010

. Reduced Days Supply of Inventory by 12% by implementing PULL system.

. Improved the average serving time by 28% by implementing ergonomic

arrangement.

. Led a team of 7 on daily operations, scheduled inventory cycles and

trained personnel on 5S.

Graduate Teaching Assistant, Oklahoma State University, Oklahoma

Aug 2009-May 2010

. Tutored undergraduate and graduate students on Process Flow Models and

M.S. Access.

Quality Assurance Engineer, Parker Hannifin, India

Sep

2006-May 2008

Six Sigma and Process Improvement

. Improved the Cpk of Critical to Quality dimension by 10% by

recommending CNC manufacturing process changes.

. Developed FMEA, PPAP, Process Control Plans, SPCs and Gage R&R for gear

pumps with machining suppliers.

. Reduced Cost of Poor Quality of pump castings by 31% in the 4th quarter

of 2008 and tracked progress with MS Project.

. Performed cost saving analysis and assigned jobs to material laboratories

to reduce inspection costs by 15%.

. Reduced the lead time of third party inspected components by 10%.

Lean Projects

. Wrote Material Safety Data Sheets (MSDS) and trained shop floor employees

on OSHA and EHS regulations.

. Performed time studies of hydraulic and pneumatic assemblies to determine

average process time for line balancing.

. Led a team of 4 to reduce the locating time of instruments by 19% using

5S technique.

. Redesigned the scrapping process and the layout to save space by 55%.

. Ensured timely material procurement by reducing the variance in On Time

Delivery (OTD) Lead Time by 16%.

. Eliminated frequent assembly errors by preparing Standard Work Procedures

(SWP) for hose assemblies.

. Calculated Key Performance Indices (KPI) by analyzing monthly/quarterly

business data on the balanced score card.

. Prepared Value Stream Maps of pump components assembly and procurement to

identify improvement opportunities.

Quality Control/Assurance

. Performed Root Cause analysis on hydraulic repair components to prepare

Corrective -Preventive Actions (CA/PA).

. Validated and tested hose and crimped fitting assembly.

. Calibrated pressure gages and flow meters and inspected components using

height gages, air gages, micrometers etc.

. Wrote and compiled technical user manual for operating CNG dispensers.

. Formulated Quality Assurance Plans (QAP) for hydraulic & pneumatic

systems by researching ASTM/BS/CSA/DIN.

. Conducted Liquid Penetrant Testing as per ASTM E 165.

. Prepared TPM checklist and troubleshooting chart for gear pump assembly

and test rig.

COMPUTER SKILLS:

SAP, J.D. Edwards, AutoCAD, Excel Solver, M.S. Access & Project, 'Anova',

AnyLogic, Minitab, LogicTools and Lotus Notes.

CERTIFICATIONS:

. Green Belt Lean Six-Sigma, Business Excellence Solution.

. ISO 9001:2000, certified by Advanced Training Institute, Mumbai of the

Government of India.

INDUSTRIAL-ACADEMIC PROJECT EXPERIENCE:

. Conducted cost/schedule variance analysis of the project and crashed the

critical path using CPM in M.S. Project.

. Used Monte-Carlo simulation in Excel to analyze project's annual worth of

multiple projects.



Contact this candidate