ADITYARAJ PUROHIT
*** *. **** ******, *** H-**, Stillwater, OK 74075
e-mail:ablmch@r.postjobfree.com Tel: 405-385-
1734
SUMMARY:
Green Belt Lean Six Sigma, Experience in 5S, Value Stream Maps, Waste
Reduction, Cell Design and Assembly Processes.
EDUCATION:
Master of Science - Industrial Engineering and Management
Aug 2008- Jul
2010
Oklahoma State University, Stillwater, Oklahoma
GPA: 3.69/4.0
Bachelor of Engineering - Mechanical Engineering
Aug 2002
- Jun 2006
Mumbai University, Mumbai, India
GPA: 3.8/4.0
EXPERIENCE:
Student supervisor, University Dining Service, Oklahoma
Aug
2008-Jul 2010
. Reduced Days Supply of Inventory by 12% by implementing PULL system.
. Improved the average serving time by 28% by implementing ergonomic
arrangement.
. Led a team of 7 on daily operations, scheduled inventory cycles and
trained personnel on 5S.
Graduate Teaching Assistant, Oklahoma State University, Oklahoma
Aug 2009-May 2010
. Tutored undergraduate and graduate students on Process Flow Models and
M.S. Access.
Quality Assurance Engineer, Parker Hannifin, India
Sep
2006-May 2008
Six Sigma and Process Improvement
. Improved the Cpk of Critical to Quality dimension by 10% by
recommending CNC manufacturing process changes.
. Developed FMEA, PPAP, Process Control Plans, SPCs and Gage R&R for gear
pumps with machining suppliers.
. Reduced Cost of Poor Quality of pump castings by 31% in the 4th quarter
of 2008 and tracked progress with MS Project.
. Performed cost saving analysis and assigned jobs to material laboratories
to reduce inspection costs by 15%.
. Reduced the lead time of third party inspected components by 10%.
Lean Projects
. Wrote Material Safety Data Sheets (MSDS) and trained shop floor employees
on OSHA and EHS regulations.
. Performed time studies of hydraulic and pneumatic assemblies to determine
average process time for line balancing.
. Led a team of 4 to reduce the locating time of instruments by 19% using
5S technique.
. Redesigned the scrapping process and the layout to save space by 55%.
. Ensured timely material procurement by reducing the variance in On Time
Delivery (OTD) Lead Time by 16%.
. Eliminated frequent assembly errors by preparing Standard Work Procedures
(SWP) for hose assemblies.
. Calculated Key Performance Indices (KPI) by analyzing monthly/quarterly
business data on the balanced score card.
. Prepared Value Stream Maps of pump components assembly and procurement to
identify improvement opportunities.
Quality Control/Assurance
. Performed Root Cause analysis on hydraulic repair components to prepare
Corrective -Preventive Actions (CA/PA).
. Validated and tested hose and crimped fitting assembly.
. Calibrated pressure gages and flow meters and inspected components using
height gages, air gages, micrometers etc.
. Wrote and compiled technical user manual for operating CNG dispensers.
. Formulated Quality Assurance Plans (QAP) for hydraulic & pneumatic
systems by researching ASTM/BS/CSA/DIN.
. Conducted Liquid Penetrant Testing as per ASTM E 165.
. Prepared TPM checklist and troubleshooting chart for gear pump assembly
and test rig.
COMPUTER SKILLS:
SAP, J.D. Edwards, AutoCAD, Excel Solver, M.S. Access & Project, 'Anova',
AnyLogic, Minitab, LogicTools and Lotus Notes.
CERTIFICATIONS:
. Green Belt Lean Six-Sigma, Business Excellence Solution.
. ISO 9001:2000, certified by Advanced Training Institute, Mumbai of the
Government of India.
INDUSTRIAL-ACADEMIC PROJECT EXPERIENCE:
. Conducted cost/schedule variance analysis of the project and crashed the
critical path using CPM in M.S. Project.
. Used Monte-Carlo simulation in Excel to analyze project's annual worth of
multiple projects.