ARMELITO R. REYES
*********@****.***
PROFESSIONAL PROFILE
Goal driven professional with solid background in all areas of production that includes production planning and inventory
control, quality assurance, safety programs, manpower training and team building combined with skills as a biotech technician.
Effective in maximizing plant capacity, utilizing resources and cost control.
RELEVANT SKILLS
• Use of different laboratory tools and equiptment - microscopy, pipetting, pH meter, spectrophotometry, autoclaving,
centrifuge, thermal cycler,haemocytometer,gel electrophoresis assembly and microplates.
• Performing different laboratory processes/operations – buffer preparation, serial dilution, cell culturing, ELISA
(immunoassay), PCR, SDS-PAGE, DNA Extraction/Isolation, Gram Staining and Characterization, Streak Plating
• Laboratory practices – Aseptic Technique, Good Manufacturing Practices(GMP), Standard Operational Procedures
• Others – Microsoft Office( Word/Excel/Powerpoint), Bioinformatics
EDUCATION
BACHELOR OF SCIENCE IN INDUSTRIAL ENGINEERING
University of Santo Tomas, Manila, Philippines
BIOTECHNOLOGY LABORATORY TECHNICIAN
BioHealth College, San Jose,CA completed August 2010
PROFESSIONAL EXPERIENCE
Hubbell Lenoir City, Inc. San Jose, CA
Production Supervisor 2006 to 2008
Manufacturer of precast polymer concrete casings and enclosures used to house underground cables and equipment for water,
electric and telecommunication companies. Plant is located in San Jose, California.
• Oversaw activities of 18 casters based on individual efficiency, quality, resin usage and safety concerns.
• Originally assigned on the 2nd shift, within 6 months after employment increased the performance of the department
handled . With average efficiency increased by 8%, resin usage (main raw material) reduced by 3% and recordable
accidents reduced to 2 compared to the first 6 months of 7 accidents.
• Suggested the preventive maintenance system that became the basis for the daily operator checklist, which totally
reduced accidents and machine downtime.
• Achieved yearly performance goal of 2% increased in efficiency, reduction of resin consumption by 0.5% and quality
performance of 3% increase.
• Reviewed production schedules daily, ensured that all needed raw materials were available
and act accordingly to make sure that goals were met.
• Prepared reports and all required paperwork .
Super Design Manufacturing, Inc. Cavite, Philippines
Production Supervisor 1995 to 2000 and 2002 to 2005
Garment manufacturer and exporter
• Participate in the start up of the company assisting the Factory Manager in preparing a plan and time table on how the
start up will be done.
• Prepared the lay out of the plant with the approval of the factory manager, hired the key personnel that will be the
cornerstone of the company’s organization and develop the company’s standard operational procedure including
designing of forms in coordination with the factory manager and train key personnels on its implementation.
• Implement the plan from receiving of equiptments, supplies, materials and accessories.
• Supervised all factory operations from receiving to finishing and packing
• Prepared production and workload schedule resulting in a reduced manufacturing cycle time while optimizing plant
capacity and resources
• Monitored plant performance and quality to determine target volume and ensured deliveries were met
• Consistently checked materials and accessory inventory to ensure its availability
• Attended to administrative functions such as recruitment, training and performance reviews of personnel