Post Job Free

Resume

Sign in

Electrical Engineer Power Plant

Location:
West Chester, OH, 45069
Posted:
September 03, 2010

Contact this candidate

Resume:

David A. Bennett

**** ********* *****

West Chester, Ohio 45069

abliuq@r.postjobfree.com

home 513-***-****

cell 513-***-****

Objective:

Director of Engineering - Maintenance - Facilities

Experience:

. Working knowledge of EC&PL (lock-out, tag-out), NFPA 70E, NEC, OSHA,

MSDS, preventive and corrective maintenance using CMMS,

lifting/rigging, 5-S's, SOPs, ISO9001, ISO14001, fall protection,

manlift equipment (scissor lifts, stick boom), PLC programming (AB),

Autocad 2002, Microsoft Word, Outlook, and Project 2002.

. Exposure to Haz-Mat, Blood Borne Pathogen training (Hep vaccinated),

CFR (Parts 210 and 211) ASTM, ANSI, ASME, Lean Manufacturing,

Microsoft Excel and Powerpoint.

. Versatility resulting from numerous successfully completed assignments

requiring knowledge from diverse technical areas; maintenance

troubleshooting (facility and machine), print reading (carpentry,

layout, piping, electrical, structural, etc.), electrical engineering

(embedded systems up to medium voltage 15KV switchgear), project

planning and budgeting, asset preservation budgeting, technical and

specification writing, supervision (inc. scheduling, training,

coaching, counseling, and disciplinary action).

. Flexible with assignments, shifts, hours, overtime, weekends, holidays

and travel to 30% to achieve company goals.

. Ability to function well in a culturally diverse, team oriented

environment.

Education:

. 16 credit hours remain to complete a B.S. in Electrical Engineering

Technology, currently maintaining a 3.3 GPA at the College of Eng.

and Applied Science of UC.

. Additional course credits (15) in stationary engineering and power

plant technology.

Work History:

May 2010 Operating Engineer

present Operate heavy equipment, e.g. backhoe, industrial and rough

terrain forklift, end

dump, skid steer, etc. Possess CDL 'A' license.

Oct. 2008 Maintenance - facility and equipment

Feb. 2009 Installed piping, conduit, safety equipment and light

machinery. Ran air and

electric services and troubleshot production and facility

equipment.

June 2008 Electrical Contracting - Estimating and Installing

Mar. 2007 Primarily cost estimated commercial/industrial work

compiling bids and submitting

to owners/general contractors. Occasionally, worked

construction sites.

Feb. 2007 Final 13 years worked in construction, directing

maintenance crews of 31 to 64

June 1974 skilled personnel installing machinery including a 2.5

acre new product assembly

line at a cost of $240 M. Four years supervised facilities

maintenance group of 14, maintaining building, grounds, offices,

lighting, floors, restrooms, potable water, sewers and HVAC.

Supervised both the power plant and waste pre-treatment plant

for 2 years, project managed rebuilding of two 80,000# boilers.

Responsibilities included 2 cooling towers, three 125# boilers,

a staff of 14 employees and a critical PM program. Five years

as plant electrical engineer, supporting maintenance of the

building, grounds, lighting, and air handling equipment,

specifying and requisitioning of new switchgear and maintaining

facility electrical system.



Contact this candidate