Post Job Free

Resume

Sign in

Electrical Engineer Project Manager

Location:
Springfield, MO, 65806
Posted:
September 06, 2010

Contact this candidate

Resume:

Chauncey Pyle

**** *. ******

Springfield, MO ***06

Phone: 417-***-****

Email:ablgdz@r.postjobfree.com

____________________________________________________________________________

_________________

EDUCATION

BS Math/History, Evangel University (Cum Laude)

BSEE (Electric Power Emphasis), University of Missouri-Columbia

EMPLOYMENT

NYSEG, (SECo), Binghamton, NY 9/2008-

3/2009

Sr. Substation Engineer

Substation design engineering & project management. Watercure

Road 345-230KV 400MVA transformer replacement with new station

service, new breaker, new protection/control panels, and VTs.

Watercure Road scope, engineering notes, estimate and material

specs. Interlaken (34.5-5KV), Sand St. (34.5-13KV), Montour

Falls (34.5-8KV), and Poundridge (46-13KV) transformer

replacements.

AEP/PSO, Tulsa, OK 2/2008-

8/2008

Contract Substation Engineer

Substation design engineering & CAD design (Microstation)

Duncan 138-13.8KV 20MVA substation addition - Physical &

electrical and protection & control. Waskom Sub 69KV breaker

addition with primary/backup line protection for 2

transmission lines. Replaced 138KV line disconnect switch at

Craig Jct. station

PPL Electric Utilities, Allentown, PA

4/2007-12/2007

Contract Substation Engineer

Substation design & project management. Gamesa Nescopeck 120MW

230KV wind farm ring bus switching station, Hosensack 75MVA

230-69KV transformer addition, Gamesa 100MW Frackville 69KV

wind farm interconnection.

Johnson Controls/CSC, Norwich, CT

6/2005-4/2007

Electrical Engineer

Electric facilities engineer for 12 large CSC data centers

critical environments. standby generation, UPS systems, ATS,

power distribution, design, operation, and maintenance.

Norwich CSC Data Center facility management.

Wash Tub Laundry, Springfield, MO

5/1996-12/2002

Owner/Operator

Owned and operated three laundromats and

vending route.

South Norwalk Electric Works, Norwalk, CT

6/1995-3/1996

Electrical Engineer

Primary electrical engineer for this electric utility.

Substation, transmission, distribution and generation

planning, design, operation, and maintenance. Project manager

for generation upgrade.

Illinois Power, Mount Vernon, IL

3/1994-10/1994

Contract Electrical Engineer

Distribution design and project management of Murray Center

Hospital, Centralia, IL, electric distribution system.

Upgraded underground system from 4160V to 13.8KV with primary

automatic throwover scheme.

City of Riverside, CA Public Utilities

11/1992-7/1993

Contract Substation Engineer

Design of distribution substation projects. AutoCAD

drawings.

Illinois Power, Decatur, IL

7/1990-10/1992

Contract Substation Engineer

Substation design and project management of 12 distribution

substation projects (34Kv to 138Kv).

Burns & McDonnell Engineers, KC, MO 10/1988-

6/1990

Substation Engineer

Substation design and project management. 161Kv cap banks.

69Kv switching station and 69Kv generator step-up station.

230-69Kv transmission substation with 4-230Kv lines, 10-69Kv

lines and 2 autotransformers. Short ckt. calculations,

specifications and contract preparation, scheduling,

estimating and construction supervision of 100MW combustion

turbine power plant with a 69KV step-up sub and a 69KV

switching station.

Allgeier, Martin & Associates, Joplin, MO 6/1986-

10/1988

Transmission Engineer

Transmission line design and construction management. 115mi.

Morgan Sub-SW Power Plant-AR/MO state line 345KV line design

and construction management. 161KV City of Springfield, MO

transmission loop design. 69Kv Kiefer-Bixby,OK line design.

References furnished upon request