Daniel John Universal
*** ********* ***, *********, **, 39157-5187
601-***-**** ( home ) / 601-***-**** ( mobile )
abl9jm@r.postjobfree.com
SUMMARY & Highly motivated results-orientated professional with a
successful history in manufacturing process
OBJECTIVE design, operations management, problem solving &
continuous improvement. Demonstrates strong
leadership qualities, communication, organizational & team
building skills. Sixteen years experience
w/automotive OEM's. Seeking an Executive-Level Director
of Manufacturing, Engineering or Plant
Manager Position in Operations; offering innovation,
personal growth, challenge and responsibility.
PROFESSIONAL NISSAN RENAULT CORPORATION - VEHICLE ASSEMBLY OPERATIONS
Canton, MS
EXPERIENCE Position: Senior Product Quality Manager ( Inspection /
Pre Delivery / Lab Investigations )
10/09-present Duties: - Created a comprehensive plan
based on Consumer Reports & internal evaluation
audits that focused on Problem Solving,
Change Management, Process Capability
& Quality Management Systems with customer
satisfaction being the #1 priority.
- Facility awarded J.D. Power and Associates
2009 Initial Quality Study ( Altima )
- Decreased warranty @ 3MIS from 11.2 to 9.8
PPH [ 1MIS from 5.3 to 4.7 PPH ]
- Utilized mutilation team & disciplined
quality gates to contain defects in station.
- Monitored quality variation control
characteristics ( HVAC fluid volumes, brake
function, vehicle pull, tire vibration, wind noise, closure efforts ) for
capability &
trend. Audited job observation process to
ensure standardized work is occurring.
- Worked w/Supply Chain Management to improve
on-time delivery performance.
Analyzed value stream maps to optimize
vehicle flow, purchased tracking system
& cross trained repair techs which minimized
lead time while increasing DSTAR.
01/07-10/09 Position: Senior Manufacturing Operations Manager ( Trim
/ Chassis / Final Assembly )
Duties: - Reported to Director of Manufacturing.
Accountable for (6) mid-level managers,
(38) supervisors & (685) technicians.
Achieved and sustained department KPI's.
- Developed a business plan ( road map ); set
objectives, targets, strategies, control
items & tracking mechanisms. Communicated
to employees, obtained their input
& commitment, towards a common goal. Made
decisions, considered immediate
& long-term implications, benefits & costs,
and risks associated with alternatives.
- Strengthened management safety culture.
Lowered Incident, Recordable & Lost
Time rates by 46%. Measured audit
effectiveness. Set-up ergonomic job rotation.
- Added poka-yokes to prevent "flow-out",
removed non-torque controlled battery
& pneumatic tools, installed DC electric
guns, interlocked with conveyor for ALS
- Used Automatic Guided Vehicles, low cost
automation & Block Kitting concepts
to improve efficiency. Benefits realized;
minimized waste, increased value added
work content, removed (36) direct labor
heads, reduced decision making process,
simplified rebalance complexity, improved
part presentation & material handling.
- Raised plant cost competitiveness level
through DSTR & CPU reductions. Pulled
out fixed heads, trapped labor & over speed.
Re-allocated elements, saved $3M.
- Mitigated constraints to attain scheduled
delivery commitments. Department had
been missing build by 800 vehicles a month.
Boosted revenue by $32M a month.
- Mentored, supported & motivated high
potential team members. Hired/promoted
staff as required. Taught Emotional
Intelligence & Situational Leadership vision.
- Selected to participate in global CFT,
challenged VP's on policies & procedures.
Proposals submitted; capacity utilization /
volume flexibility, equipment sourcing
options, new model budget setting & over
specification as it relates to high costs.
DAIMLER CHRYSLER CORPORATION - MANUFACTURING OPERATIONS
Detroit, MI
02/04-01/07 Position: Production Superintendent ( Case Carrier
Machining / Warren Truck Assembly )
Duties: - Applied Lean Manufacturing Principles
in safely producing high quality, on time
products to meet customer and profitability
expectations. Established production
metrics & performance standards for a staff
of (9) supervisors & (242) associates.
- Trained & certified Shainin Red X Journeyman
( Master Black Belt ). Leveraged
Toolbox ( Pareto, Isoplot, Strategy Diagram,
Multi-Vari, Concentration Diagram,
BOB/WOW, Tolerance Parallelogram ) to
converge on source of variation; scrap
decreased by $3.75M in 2004. Projects
concluded; thrust face & spherical radius.
- Identified bottlenecks that constrained
throughput, formed problem solving team,
planned & prioritized work w/PDCA's,
allocated resources, JPH jumped by 30%.
- Determined optimal buffer space b/w
operations so process can continue without
being blocked or starved. Balanced
tradeoff b/w costs for buffers and increased
WIP vs benefits of additional throughput due
to decoupling on retooled WK line.
- Integrated 5-S principles into daily
requirements, thereby providing a safe, clean,
efficient arrangement where tools, equipment
& material have a specific location.
- Benchmarked use of visual management such as
standardized work displays, foot
printing & scoreboards to identify
abnormalities which required corrective action
- Spearheaded small team concept of job
rotation & shared roles / responsibilities,
this reduced effects of absenteeism &
enhanced morale via operator involvement.
- Employed "bank of 1"strategy to reduce
nonconforming parts & verified w/LPA.
03/03-02/04 Position: Senior Manufacturing Engineering Manager (
Rear Differential / Axle Assembly )
Duties: - Managed Engineering Operations at
Detroit Axle Plant with Responsibilities for
Safety, Quality, Delivery, Cost & Morale.
Led, coached & supervised team of (8)
Process, Electrical and Plant Facility
personnel that exceeded departmental goals.
- Supported program management of 2004 HB &
2005 ND launch by coordinating
design, build & approval of machining
equipment, fixtures, gages & cutting tools.
- Trained & certified as Shainin Red X
Apprentice ( Green Belt ). Using this data
driven problem-solving approach, we
minimized departmental scrap cost by $1.4
million in 2003. Projects concluded;
oversized bores, thin flanges & shaft length.
- Introduced & modernized tooling, which
resulted in a cost reduction of $800K in
2003. This included; HSS & carbide drills,
CBN / PCD inserts & milling cutters.
- Eliminated (21) heads through process
improvements, layout rearrangements and
additional automation resulting in a total
cost reduction of $2.85 million in 2003.
- Increased Direct Run FTC, by designing error
and mistake proofing features into
products & processes, which provided Built-
In-Quality and decreased plant PPH.
- Used Kepner Tregoe Problem Analysis Tools to
resolve special cause deviations.
07/00-03/03 Position: Maintenance Superintendent ( Mack Engine Plant
- Crankshafts / Cylinder Heads )
Duties: - Facilitated, directed & trained (6)
supervisors and (128) skilled trades. Obtained
maximum utilization of people and equipment
engaged in 3.7L Engine Assembly
to conform with vehicle quality standards,
scheduled volume and budgeted costs.
- Utilized OEE, MTTR and MTBF data to develop
& implement a TPM program.
Initiated zero breakdown Kaizen activities
such as Vibration & Infrared Analysis.
- Created an environment where communication &
trust is conducive to improved
job satisfaction. Encouraged participation
in MQAS & PQI to assist in that goal.
- Provided detailed line-ups of weekly
maintenance activities and follow-up issues.
- Procured OEM supplier services & obtained
replacement/spare parts as required.
FORD MOTOR COMPANY - POWERTRAIN & CHASSIS OPERATIONS
Sterling Hgts, MI
05/96-07/00 Position: Manufacturing Process / Tooling Engineer (
Ring and Pinion Gears / Axle Shafts )
Duties: - Worked with Product & Manufacturing
Engineering, Suppliers and New Model
Groups to estimate, design, develop and
launch Facilities and Tooling to support
product design changes, platform capacity
expansions & future vehicle programs.
- Completed PN-96, UN-93 & FN-145 Facilities /
Tooling Cost & Timing Studies.
Evaluated part design at concept stage to
resolve manufacturing feasibility issues.
- Purchased $95M in new equipment from APN
phase through runoff / installation.
- Reviewed equipment specifications for
safety, capability, reliability & durability.
- Acquired; CNC mills & lathes, spline
rollers, induction hardeners, straighteners,
drills, grinders, polishers, washers, stud
presses, conveyors, o/h gantries & robots
- Launched highly flexible lean mfg. systems &
focused on process driven product
design, process quickly retooled by using
CNC to adjust fixtures / tailstock cntrs.
- Conducted gage development and purchased
gages for all New Model Programs.
- Limited past things-gone-wrong by developing
PFMEA's that meet design intent.
- Coordinated skilled trades in the
installation of new equipment during set-up and
launch. Established training matrix for
production personnel. Stocked spare parts.
- Implemented a Quality Control plan per APQP
guidelines for Axle Shaft & Gear
Business Units. This included; Process
Illustrations, Control and Reaction Plans,
Repair and Acceptance Standards, Process
Flow Diagrams and Operation Sheets.
- Verified supplier's quality processes have
been executed via PPAP submission &
production processes are capable of
producing quality parts in sufficient quantity.
- Researched, wrote & implemented cost savings
projects which eliminated $25M.
- Reduced processing lead time by eliminating
waste & non-value added activities.
- Improved machine reliability & uptime by
preventing problems from reoccurring
via 5-why root cause analysis, thus
identifying & eliminating repetitive problems.
01/94-05/96 Position: Product Design Engineer ( 4.6L SOHC 90-Degree
V8 Rear Engine Development )
Duties: - Designed, developed, tested and
released engine components for Cost, Quality &
Performance specifications. Worked with
Corporate Vehicle Platform Engineers
in development of DOE's that optimized fuel
economy & emissions requirements
- Completed structural dynamic FEA
calculations on engine components to ensure
they were light enough to keep vehicle wght
down, yet capable of handling loads.
- Collaborated with NVH groups to isolate
mechanical vibrations thereby reducing
structural noise through implementation of
enhanced materials to absorb energy.
- Optimized valve & plug locations for airflow
and combustion using CFD models.
- Participated with Reliability and Durability
Engineers to correct Warranty issues
related to EPUS, C/100 & P/$10K @ 12 MIS.
Developed corrective action plans.
- Investigated cost reduction design proposals
for current MY production engines.
EDUCATION STATE UNIVERSITY OF NEW YORK AT BUFFALO ( S.U.N.Y. BUFFALO
) Amherst, NY
08/86-12/93 Master of Science, Engineering Management - Production
Systems, September 1993, GPA 3.25/4.0.
Bachelor of Science, Manufacturing Engineering (
Industrial/Mechanical ), May 1991, GPA 3.0/4.0.
COMPUTER Operat. Systems: - Windows XP, Mac OS X, Linux
EXPERIENCE Software: - AutoCAD, Minitab, MS ( Excel, Word,
PowerPoint, Access, Project and Visio )
TECHNICAL CNC Programming, " Turn G Code " ( GE Fanuc ); Power Mate
D Servo and Spindle Maintenance
TRAINING ( GE Fanuc ); Industrial Hydraulics ( Vickers );
Industrial Pneumatics ( Rexroth ); Machine Tool
Turret Technology ( Sauter ); Lubrication Systems ( Trabon
); Robot Programming ( ABB ); High
Speed Spindle Bearing Technology ( NSK ); Modicon PLC
Programming ( Square D ); Machining
Principles & Cutting Tool Technology ( Carboloy ); GD&T
Principles ( Meadows );