William H. Jacobs 717-***-**** (H)
*** ***** ***** ****, *********, PA 17603 717-***-**** (C)
PROFESSIONAL EXPERIENCE
Work Group Advisor / Scheduler, Paint : Harley-Davidson Motor Company,
York, PA 2007- Present
Supervise Finesse dept including striping, decals, silk screen, and special
masking. Processes include robotic painting and clearcoat powdercoating.
Advocate of Lean Manufacturing.
. Create daily schedule for Paint operations - 100% hit rate
. Create routings for new model year colors
. Scheduled & tracked new model year parts buffer resulting in successful
launch
Area Manager, Sheet Metal / Coil Mfg : Johnson Controls, Inc / York Div.
York, PA 1998 - 2007
Formerly York International Airside Products Group. Supervise sheet metal
fabrication, panel foaming, and coil assembly in a non-union shop
environment. Advocate of continuous improvement. Kaizen events.
. Process lead for introduction of polyurethane rigid foam panel insulation
- increased productivity by 20%
. Led 5S project in sheet metal fabrication resulting in 10% cycle time
reduction
. Improved shop floor layout for lean flow resulting in 15% cycle time
reduction
Production Manager: HSI Company, Inc., Lancaster, PA
1997 - 1998
Responsible for all manufacturing and shipping for this $5MM manufacturer
of material handling systems.
. 100% hit rate on product shipments.
. Supervise 60 mechanical trades including powdercoat painting
Production Manager : Reading Pretzel Systems, Inc., Robesonia, PA
1994 - 1997
Accountable for all manufacturing and shipping schedules set by the VP of
Operations for this $20MM maker of commercial bakery equipment. Managed 85
direct and salaried employees including CNC machining, sheet metal
fabrication, welding, and assembly. Full responsibility for OSHA and DEP
compliance and facilities maintenance for
multi site locations. Planned and implemented annual vocational training
programs for skilled trades employees.
. Transformed the culture of the shop floor through team building,
coaching, and training.
. Reduced cycle time on high margin products from 90 days to 28 days
through improved plant layout.
. Reduced labor costs 28% while maintaining 100% on-time product shipments
through lean techniques.
. Headed project to open $2.5MM R&D technical center--completed project on
time and under budget.
Manager of Manufacturing: RCA/Burle Industries, Inc., Lancaster, PA
1985 - 1994
Directed all assembly and quality systems for this $25MM producer of
specialty electronic imaging and photomultiplier devices. Responsible for
225 direct and salaried employees including manufacturing engineering
staff. Achieved ISO 9001 certification following first factory audit.
Directed 3 "Class 100" Clean Rooms. Developed and controlled $5.6MM budget.
. Delivery - maintained a 97% hit rate on product shipments.
. Quality - less than .5% return rate through improved mfg. processes and
yields.
. Productivity - increased productivity 6% annually by implementing lean
shop layouts.
. Awards - 100% on-time shipments with 0 rejects for Texas Instruments
-"Supplier of the Year" Award
EDUCATION AND TRAINING
MBA Degree, 2003, Lebanon Valley College, Annville, PA (3.9 GPA)
BS Degree, Secondary Education, Millersville University, Millersville, PA
Demand Flow Technology, John Costanza Institute of Technology, Denver, Co.
Manufacturing Processes, 4000 Hours Industrial / Mfg. Training,
Caterpillar, Inc.
AFFILIATIONS
Past Chairman, Supervisory Committee, Lancaster Red Rose Credit Union
Past Chairman, York Chapter, American Society for Materials
William H. Jacobs
4000 Hr. Manufacturing Processes Training Synopsis
Shop
First Year Second Year
Drills 4 wks Automatics
16 wks
Mills 4 wks Heat Treat
4 wks
Lathes 4 wks Tool Room
6 wks
Centerless Grinder 4 wks Machine Repair
2 wks
External Grinder 4 wks Sleeve Metering
8 wks
Tool Grinding 4 wks Lathes
4 wks
Inspection 4 wks A.B. Auto Lathes
4 wks
Met Lab 4 wks
Extrude 8 wks Total
48 wks
A.B. Auto. Lathe 4 wks
Tape Drill 2 wks
Tape Lathe 2 wks
Total 48 wks
Classroom
Blueprints & Drawing
50 hr.
Algebra, Geometry, & Trigonometry
100 hr.
Machine Shop Theory
50 hr.
Physics
70 hr.
Economics
20 hr.
Heat Treatment
32 hr.
Planning
50 hr.
Automatics
24 hr.
Industrial Writing
30 hr.
Speech
24 hr.
Extrude
20 hr
Total
470 hr.
William H. Jacobs
Process Experience
Machining Others
Drilling Polyurethane Foaming
Milling Powdercoat
Painting
Grinding, (all types) Welding
Deburring (all types) CNC Plasma Cutting
Heat Treating Ceramics Firing &
Brazing
Lathe Operations Thin Film Evaporations
Heavy Extrusions Circuit Board Assembly
CNC Machining Brakes
Automatic Screw Machine Operations Shearing
Sheet Metal Fabrication CNC Punching
Managerial Functions
Direct manufacturing engineering Analyze
manufacturing variances
Direct 1st-line supervision Coach & develop
subordinates
Approve engineering change proposals Do facilities
planning
Lead cycle time reduction programs Assure timely
product shipments
Lead productivity improvement programs Implement 5S teams
Lead product cost reduction programs Promote employee
involvement
Participate in Kaizen Events Review internal ISO 9000
audits
Prepare monthly period expense budgets Write annual performance
reviews
Forecast manpower requirements Determine merit
increases
Forecast overtime requirements Interview job
candidates