Post Job Free

Resume

Sign in

Engineer Project Manager

Location:
Las Vegas, NV, 89119
Posted:
July 28, 2010

Contact this candidate

Resume:

Vitae

EDILBERTO L. ODOYA

**** *. ******** ****

Apt. 128 Las Vegas, Nevada 89119

Phone: 702-***-****

Cell: 702-***-****

Email: abl7x9@r.postjobfree.com

Objective: To find Job in Project Engineer-Structural/Construction Inspector or QA/QC

Education: - Bachelor of Science in Civil Engineer -1987 Philippines

- Professional civil engineer – Philippines

Certifications & Trainings:

- Accreditation- International Research Education Foundation, California, USA

- Course work in Auto CAD

- Course work in estimating

- ACI Concrete field testing grade I

- ACI Concrete special inspector

- Portland Cement Association – Engineering mass concrete structures

- National Highway Institute – Hardened Concrete Properties-Durability

- National Highway Institute – Mix Design Principles

- National Highway Institute – Incompatibility in Concrete Pavement Systems

- NAVFAC/Corps of Engineer- Construction quality management

- OSHA 30 hrs certificate of training

Knowledge: Diversified experience in heavy construction environment; Roads, airport

pavement, pre-stress bridge, high-density, mixed-use urban environment including a resort-

casino, upscale non-gaming high rise hotels, residential high rise luxury condominiums,

restaurants, retail & entertainment, five stars rating 4500 capacity garage, thermal building

enclosure and solid background in estimating.

Skills: QA/QC specializes in reinforce concrete, mass concrete, pt cable, structural

steel/miscellaneous metals and masonry.

Software: Word, Excel, AutoCAD, Prolog & Skire

EXPERIENCE:

PERINI BUILDING COMPANY

Sept. 2007-Dec. 2009

Project Engineer II. Reports directly to the Project Superintendent and is responsible for

reviewing, processing and distributing contract drawings, review any potential cost changes base

on new SI or Delta’s and submit a cost proposal or VE, issue field work directive, review

conservatively/process submittals in Structural/MEP/Fire Sprinkler-Alarm system that complies

in contract drawings & specs and LEED compliance, mass excavation and tracking trip ticket for

payments, coordinate and proposed a best solutions for any potential field issues in conflict with

the contract drawings to engineers of record, generate RFI’s, documents daily field

activities/accomplishment/updates and issues that need to discuss during the owners/AOR’s

meeting on weekly basis, make sure all walls and slab penetrations comply with fire stop

requirements, actual inspection/quality control and make sure all reinforcing/PT cables/embeds

& inserts/elevations/design mix/ structural steel and miscellaneous metals complies in contract

drawings & specs and shop drawings notation for field use should be stamped for construction,

inspection and monitoring special construction for tower head crane foundation/caisson in high

rise structures, daily inspection of 4 hrs rated wall masonry and grouting, coordinate third party

inspector for inspection prior concrete pouring, provide heads-up information and fashion

manner responses to subcontractor technical inquiries during sub-meetings and daily basis,

review and update procurements logs and follow-up subcontractors & vendors for materials

deliveries in reasonable time as reflected in construction schedules mostly in critical path, review

and field verify subcontractors monthly billings as reflected on actual accomplishment and make

adjustment if excessive, start-up, propose and solicit best conceptual or as built details &

sketches from trade concern for structural fixes mostly in resolving issues in non compliance

reports and notice of violations, monitor properly of handling of field concrete samples to curing

and breaking, life and safety pre testing in fire alarm/audio, high & low water pressure testing,

building enclosures such as: curtain walls/ exterior facades/below grade moisture barrier and

typical floor moisture barrier, punch list items, closed out documentations, prepare as-built

requirements, TCO and conduct daily safety audit. Project experience includes:

Project: City Center

Seventy-six acre, high-density, mixed-use urban environment including a high rise resort-casino,

upscale non-gaming hotels, high rise residential luxury condominiums, restaurants, retail &

entertainment, 4500 capacity parking structure and earned LEED gold certification from U.S.

Green building council.

Las Vegas, NV.

Project cost: $8.6 billions

Schedule: On Time

NAN INC

Jul. 2004- Sept. 2007

Project Engineer-QC structural/Estimator. As QC- Report directly to QC project manager during

the entire course of the construction for all structural activities and documentations includes;

daily inspection with the corps of engineer representative, submit concrete design mix base on

contract specification, prepare pre-pouring checklist for approval before concrete pouring,

monitor properly for all rebar placements, critical spacing & concrete cover, review mill

certificates every delivery of rebar, closely inspect all bulk rebar loadings & staging place

properly above ground, check form elevations & stability & stripping, check all admixtures and

curing compound per manufacturers recommendation, monitor properly of 3rd party handling

concrete samples to curing & breaking per ACI code standards, daily inspection of

exterior/interior rated cmu installation/rebar placement & grouting and monitor/submit prism test

result, make sure shop drawing used in field approved and have stamped for construction, inspect

bolting & torque with consultant structural engineer, concrete traffic pouring and ordering,

pictorials every courses of work for documentation & reporting and coordinate MEP trades that

all areas installed before pouring.

As Estimator- Report directly to estimating manager, during the course of getting job includes;

quantity take off for masonry, concrete, reinforcing, structural steel & miscellaneous metals and

site works, help close bids for $20 millions to above $100 millions magnitude, solicit pricing to

subcontractor, analyze subcontractor bids, participate site visit, attend pre bid meetings. Prepare

close-out documentations such as electronic as built and help imposed safety standard.

Projects:

1) WBR Brigade Complex 2E & 2F1Two blasting design bldgs, one 5 and 6 levels (cmu rated

wall, ext/interior) barracks for returning soldiers from Iraq, 3 two storey(interior rated 12”cmu

wall and 10” perimeter cast in place wall) high blasting resistance office bldgs for brigade

commanders, with retractable perimeter bollards. This project occupies 17 acre in the middle of

Schofield barracks, Hon, Hi. Project cost: $67 million Schedule: Ahead two months.

Implementing Agency: Corps of Engineer

2) WBR Brigade Complex Quad F

Total Renovation of 220,000sf 4 bldgs, 3 level barracks

Schofield barracks, Honolulu, Hi

Project cost: $35 million

Schedule: on schedule

Implementing Agency: Corps of Engineer

3) Multiple Award Construction Contract

Repair of 10,000sf roof system bldg 14

4) Renovation of 12,000sf bldg 1923&1924 – Child care development center

5) Indefinite Delivery Indefinite Quantity Construction and Services Contract

6) Renovation 3 storey bldg 352 & 400 of 60,000sf, Pearl Harbor, Job

All Project Location; Honolulu, Hawaii

UNLIMITED CONSTRUCTION

Jul. 2001- Jan. 2003

Office Engineer/QC Structural – report directly to Project manager and Project Engineer-

structural. Update all construction drawings and distribute to subcontractor for pricing, attend

subcontractor meetings, prepare pre pouring check list for approval before pouring, inspect and

monitor rebar placement, checked concrete cover & forms placement, monitor placement of PT

cables & profile and its rebar supports, checked concrete cover, termination bars, cmu grouting

& rebar. Input RFI’s to working drawings for as built documentation.

Project:

Marriott Waiohai- A 920,000sf typical of 8 bldgs, 4 level, a five star hotel with time share units,

restaurant and underground parking garage & spa, the project setting in 25 acre fronting shore

line and conservatively designed for below grade waterproofing. Project cost: $105 million.

Schedule: on schedule. Owner: Marriott Hotel

Project Location: Kauai, Hawaii

GARCIA CONSTRUCTION

Jul. 1996- Jun. 2000

Project Engineer- Report directly to the proprietor; Prepare estimate for government projects,

prepare structural calculation, supervise projects, established road survey and lay-outs, monthly

accomplishment billings, payroll, concrete & reinforcing quality control and sampling, field

density testing for sub-base & base coarse, review field base coarse elevations and coordinate

with government inspector for approval before concrete pouring and prepare as-built.

Projects:

1) 36’wide x 9” thick x 25 miles concrete pavement roads

2) 100’ x 140’ two level Bureau of Fire Department Building

3) 80’ x 80’ Caltex Gas Station

All Project Locations: Philippines

KENT CONSTRUCTION

Sept. 1994- Jul. 1996

Project Engineer- Report directly to president. Implement awarded contract, project in charge

and supervise directly to field foreman for: building lay-out, excavation, rebar installation,

electrical and plumbing, coordinate government inspector for inspection before concrete pouring,

monthly accomplishment billings, payroll, concrete samples & density testing and road right of

way negation.

Projects:

1) Airport: Expansion- 44’ wide x 6” thick x 1/2 mile concrete airport runway

2) 110’ x 140’ two level Provincial Police Barracks

3) 200’ x 280’ Provincial Gym Improvement

4) 80’ x 100’ MTI-Telecom Building

All Project Locations: Philippines

EAG CONSTRUCTION

July 1992 - Aug. 1994

Project Engineer/Quality control- Report directly to project manager. Supervise project,

established points & lay-out, coordinate pile driving, monitor elevations for pile

cap/shafts/shoulder/top of slab, check installation of rebar & tendons profile for girder, observed

every grouting for bonded tendons, prepare proposed mix design for 6500 psi girder, prepare pre

pouring requirements for approval before pouring, monitor initial/final stressing of girder to meet

combing requirements, prepare crane logistics for girder installation of 30 ft above grade and

prepare plans for detour and update procurement logs & scheduling and help imposed safety

requirements.

Project:

Construction of 2 way lanes bridges- 9 spans; (90 ft girder and 4 girder per span)

Project location: Philippines

REFERENCES:

Upon request



Contact this candidate