Post Job Free
Sign in

Project Manager Engineer

Location:
North Charleston, SC, 29418
Posted:
May 29, 2010

Contact this candidate

Resume:

SCOTT KELLY

*** ********* **** *******, ** ****0

864-***-****

E-mail: abl745@r.postjobfree.com

OVERVIEW

Manager and engineer noted for strong operations management, lean

manufacturing and presentation skills. Utilize analytical problem solving

techniques, solid technical base and superior interpersonal skills to

perform job duties. Seeking a position where my over 15 years of

engineering and management background would be an asset to my employer.

PROFESSIONAL EXPERIENCE

Ross Distribution Fort Mill, South Carolina 4/10 - Present

Engineering Manager

(Distribution Center for Ross Dress for Less)

Responsible for the planning, development and execution of all engineering

for process, facility and material handling optimization and design.

Additionally, responsible for the direction and management of corporate

lean engineering network and decentralized engineering team tasked with the

development and implementation and of all engineering and company driven

initiatives including Capital/Network Strategy projects, Engineered

Standards, and Lean/5S practices in a high volume mechanized, multi-

location distribution and logistics operation.

Amazon.com (Createspace) Charleston, South Carolina 7/07 - 2/10

Senior Operations Manager

(Manufacturing supplier for Amazon.com)

Managed over 100 associates including production, logistics, facilities,

engineering, maintenance, safety and department managers. Responsible for

strategic planning of product schedules, timelines, P&L and budgets. Drive

the plant continuous improvement and lean manufacturing initiatives. Six

Sigma Green Belt Certified.

Key Responsibilities and tasks:

. Direct and manage plant operations, along with safety (OSHA trained),

budget analysis and capital planning. Draft all capital expenditures (CAPX)

requests and prepare associated justification documents.

. Develop supplier relationships while controlling paper and raw material

inventory.

. Establish and monitor overall plant performance metrics standards for

production and quality.

. Provide leadership and lean training to accomplish the company goals and

objectives.

. Implement and maintain preventative maintenance programs. (Including

SMED)

. Incorporate organizational 5S and kaizen events among plant personnel.

Projects include:

0. Project Manager Over Plant Lean Manufacturing Implementation. This

includes Value Stream Mapping of both current and future state

maps. Eliminating the waste and moving toward the future state to

continually improve the processes.

1. Project Manager Over Continuous Improvement Teams (Kaizen

Activities). I teach a work shop to all employees in order to

empower them make changes for improvement. I utilize simulation

modeling to teach lean manufacturing and give employees a hands-on

class room approach, along with Statistical Process Control and six-

sigma techniques.

2. Provided plant wide 5S and kaizen education to empower employees to

take control of their process and area.

3. Redesign of 80% of production floor and office space to improve the

process flow and grow the business.

4. New Product launch of two manufacturing sites in Germany and

England.

5. Six Sigma projects for several quality improvements.

6. Reduced quality defects by 10% with implementation of statistical

process control.

7. Relocation of 95% production equipment and conveyors to improve

process flow.

EuroKera North America Greenville, South Carolina 7/06 - 7/07

Production Manager

(Manufacturing Supplier of Glass Ceramic Cooktops)

Manage over 150 associates, including supervisors. Responsible for

strategic planning of product schedules, timelines, P&L and budgets.

Utilize capacity utilization, OEE, production efficiency and control of

scrap levels using goal alignment to reach production goals.

Key Responsibilities and tasks:

. Direct and manage plant operations for production.

. Coordinate plant activities through the planning with departmental

managers to insure the total manufacturing objectives are accomplished in a

timely and cost effective manner.

. Control and minimize labor overtime, premium freight and repair expenses.

DAYCO, Mark IV Automotive Easley, South Carolina

Manufacturing Manager 7/03 - 7/06

(Tier 1 automotive supplier of Power Steering Assemblies)

Managed over 600 associates, including supervisors, facilitators and

engineers. Estimated manufacturing costs, coordinate the layout and

designs, while make recommendations for process requirements of new and

existing product lines. Understanding of QS9000 and TS 16949 systems.

Primary responsibilities include:

8. Plan and manage the overall operation of plant to ensure

achievement of goals and objectives directly, or through

subordinate staff.

9. Create, manage and control the departmental budget. Understanding

of P & L, direct standard vs actual, fixed overhead and cost of

quality.

10. Manage new product launch projects, including project organization,

resources, definition, planning, budget, implementation and control

from cradle to grave.

11. Train and motivate production work force to meet the needs of the

business.

12. Interface with technical staff for preparation of six-sigma design

for manufacturability and production methods for maximum

productivity.

13. Maintain communication and working relationships through all

departments to meet operation goals and objectives.

14. Motivate personnel by communicating and empowering lean

manufacturing techniques to reduces cost and improves efficiency,

which will provide associates with increases profit sharing.

15. Meet divisional goals and objectives in line with annual and long

range business plans.

16. Assist and mentor supervisors in policies and procedures.

17. Monitor Management employee relationships and guide managerial

decisions as dictated by the terms of the HR policies.

Value Stream Manufacturing/Lean Manager 7/02 - 7/03

Coordinated all lean manufacturing projects for the plant. Proficient in

the design, procurement and implementation of lean manufacturing systems.

Well versed in various Lean Manufacturing techniques such as value stream

mapping, 5S, SMED, Visual Production Management (Kanban pull systems and

WIP level controls), Level Loading, standardized work, Dock-to-Dock and

Poka Yoke.

Projects include:

18. Project Manager Over Heijunka Kanban Implementation - This

scheduling system helps control kanban pull inventories, reduced

setup and downtime. It also eliminates overproduction and batch

processing. The concept reduced WIP levels 35% and helps to

produce the right mix at the right time.

19. Redesigned 90% of the plant layout to implement cellular

manufacturing and tugger delivery routes from the supermarket

warehouse with 1 hour deliveries to each of the cellular work

centers.

20. Implemented supermarket/tugger delivery system with reduced

inventory turns from 18 to 11 days on hand.

21. Implemented Level Loading (Production Smoothing). Maintained 99%

shipping rating with customers.

BOSCH Anderson, South Carolina 9/00 - 7/02

Manufacturing Engineer

(Bosch: Tier 1 automotive supplier of Fuel Rails, Oxygen and Wheel Speed

Sensors)

Work on projects of relating to automation, facility design, work

measurement, robotic equipment, materials flow, inventory control,

packaging, material planning, shipping, receiving, fabrication and final

assembly.

Project Engineer

(AUTECS: A division of BOSCH and Tier 1 automotive supplier of Automatic

Transmission and Engine Control Units)

Responsible for new product launch and advanced electronic manufacturing

for Tier 1 supplier. Coordinate customer information and evaluation for new

technologies to production team. Work on projects interacting with multiple

departments including design, quality, marketing and sales. Well versed in

automation, design, robotic equipment, materials flow, inventory control,

packaging, material planning, shipping, receiving, fabrication and final

assembly. Utilize TMC, PPAP, APQP, QS 9000, ISO14001, Kanban, Kaizen and

JIT. Utilized benchmarks such as OEE, capacity analysis and goal

alignment.

Projects include:

22. Project Leader Over Planning and Scheduling of New Model Year

Product Launch

23. Project Leader Over APQP for Nissan and Subaru

24. Project Leader Over ESD (Electrostatic Discharge) Elimination Team

- Reduced Scrap level from 25% to less than 1%

25. Project Leader Over Lean Manufacturing (5S) Implementation Team -

Increased Production Floor Space 30%

26. Project Leader Over Panasonic e-PlantView SPC Software Installation

- Total Project Cost $80K

27. Project Leader Over Plant Logistic Team (Kanban Implementation) -

Total Project Cost $15K

Schlumberger Industries, West Union, South Carolina 5/98 -

9/00

(Produces Residential, Commercial and Industrial Electronic Metering

Devices)

Manufacturing Engineer / Project Manager

Managed resources and establish motivated project teams. Plan and control

major projects within the engineering division while interfacing with

design, engineering, marketing, sales and manufacturing in coordinating the

release of new products. Responsible for new product launch and design for

manufacturability. This position required the capability of team

leadership, while training and coaching others.

Projects include:

28. Project Manager Over New Sentinel Product Line - Total Project Cost

$1.7M

29. Project Manager Over New Dattus Product Line - Total Project Cost

$855K

30. Project Manager Over New Q1000 Product Line - Total Project Cost

$1.2M

31. Project Manager Over New Centron Automated Production Line - Total

Project Cost $8M

32. Redesigned 70% of Facility Layout to Provide Space for New Centron

Product

33. Project Leader to Relocate Electronics Warehouse Within Plant

34. Implementation of 5S and Visual Workplace - Increased Production

Floor Space 25%

35. Added ASRS (Automated Storage Retrieval System) for Electronic

Warehouse - Total Project Cost $125K

36. Implemented Bar-Code Labels to Control Inventory Plant Wide - Total

Project Cost $140K

37. Project Leader of $500,000 Cost Reduction Team

38. Purchased Various Types of Capital Equipment to Support Production

Lines

Exide Electronics, Wilmington, North Carolina 5/97 -

5/98

(Produces Uninterruptible Electronic Power Supplies)

Process Engineer

Responsible for the acquisition, upgrade, maintenance and production

support of automated assembly, material handling and packaging equipment

required to support the facility. Provide support and development of

computerized tests using measurement equipment and other

various techniques. Possess understanding of sheet metal fabrication,

harness wires, painted parts and printed circuit boards.

Responsible for developing and maintaining methods of operation, along with

the process for parts fabrication, components, sub-assemblies and final

assemblies. Ability to develop and use configure to order charts, along

with working drawings. Possess knowledge of various quality standards and

functional requirements for a variety of mechanical components.

The ability to troubleshoot, maintenance and repair when problems arise

using root cause analysis. Capable of writing job descriptions, operator

procedure instructions, bills of material, schedules and engineering change

notices.

Knowledge of process improvement, capital equipment justification and cost

reductions, tooling and materials in a fast paced manufacturing

environment. Proficient in the development of work measurements, workflow

analysis and work cell design. Responsible for meeting safety, production

and quality requirements using ISO-9000 manufacturing methods on several

production lines.

Projects include:

39. Project Leader to Relocate Product Line from Tijuana, Mexico to

Wilmington, NC - Improved PCB Quality by 35%

40. Complete Upgrade of Bar-Code Label Software to Support Powerware

Products - Total Project Cost $40K

41. Design, Development and Prototyping of New 18 High Volt Product

42. Redesigned the Layout of Powerware Plus 12 Conveyor Line to

Provide Better Flow - Cycle Reduced 15%

43. Facility Design and Layout of New Sequoia Product Line

44. Human Factors and Ergonomic Workcell Designs - Reduced

Repetitive Motion Complaints by 75%

45. Project Leader of New IBM Rackmount SE Product Line

Developed New Training Methods to Improve the Process

46. Cost Reductions Totaling Over 100,000 Annually

First Federal Savings and Loan, Greenville, South Carolina 5/87 -

7/93

(Retail and Commercial Banking)

Construction Loan Officer, Financial Investment Consultant

EDUCATION

BS, Industrial Engineering,

Clemson University, Clemson, South Carolina

Associate of Science,

Greenville Technical College, Greenville, South Carolina

TECHNICAL SKILLS

Knowledge AS/400, AutoCAD, Bar-Codes, e-plantview, FastCad, MFGPro,

Microstation, MRPII, MS Access, MS Excel, MS Explorer, MS PowerPoint, MS

Project, MS Word, Networks, PDQ Flowcharting, SAP, Scan Guns, SIMAN

Simulation, Statstix, SUN, UNIX, WEB page design, Windows, Visio,

graphical presentations and PC hardware configurations.



Contact this candidate