Post Job Free
Sign in

Quality Assurance Manager

Location:
Camarillo, CA, 93010
Posted:
April 05, 2010

Contact this candidate

Resume:

Jason Muldoon

**** ****** ***. *********, ** ****0 Phone: 805-***-**** email:

***********@*******.***

Areas of knowledge and expertise

Program Management / Offshore Manufacturing / Process Reengineering / Lean

Manufacturing

ERP Implementation / Turnaround Management / Aftermarket Service and Repair

Summary

High performance Manufacturing Operations Executive. A visionary respected

for turnaround abilities and bottom line focus. Adept at finding new

productive processes, and using superior leadership skills to develop

strong esprit de corps. Record of proven results in reducing costs,

improving operational performance, and establishing manufacturing as a

competitive advantage.

1. Reorganized and revitalized PTI Element Factory; rebuilt management

team; organized an effective second shift; implemented capacity

planning capability reducing past due orders by 85% from $750k to

$85k.

2. Implemented Lean Manufacturing techniques on the 737 lay-up line;

Established moving line; Kanban; In-line inspection and one-piece flow

resulting in a 20% reduction of assembly time and increasing

flexibility

WORK HISTORY

Operations Manager

August 2009 - January 2010

Skurka Aerospace, Camarillo, CA

World leader in the design and manufacture of Motors for Aerospace

Applications

Responsible for the setup and production of the Starter Generator Line,

relocated from a Holtsville, New York facility to its current location in

Camarillo.

. Developed and maintained schedules for both internal and customer

needs.

. Managed and spares inventory needs during transition from facilities.

Operations Manager

November 2006 - August 2009

Ducommun Aerostructures Inc. Monrovia, CA

World leader in the manufacture of composite and metal bonded structure for

Aerospace applications.

Responsible for all aspects of a two-shift multi plant bonded panel

operation for the Boeing 737. Directed Assembly, Manufacturing

Engineering, Material Planning, and Quality Assurance in a Focused Factory

environment. Used lean manufacturing concepts, including percent load

charts, takt time, and action item lists, in the department with these

results to date:

. Provided operations voice to the customer for conference calls and

quarterly program reviews

. Implemented moving line for the pre-bond assembly

. Worked with customer on project to move post bond operations from the

Monrovia facility to a start up facility in Guaymas, Mexico.

. Reduced front end production hours by 20%

. Participated in new business proposals for the facility.

. Participated in contract negotiations with the union, resulting in an

accomplishment of management goals.

Factory Manager

September 2003 - November 2006

PTI Technologies Inc. (Div of ESCO) Oxnard, CA

World leader in the design, manufacture and marketing of high technology

filter elements, modules, and filtration and fluid flow equipment used in

Aerospace, Defense, and Industrial applications.

Responsible for 100 employees in a two-shift filter element assembly

operation. Directed Assembly, Manufacturing Engineering, Material

Planning, Purchasing, and Quality Assurance in a Focused Factory

environment. ISO 9001:2000, AS 9100A: 2001, D6-82479 and QS 9000

certified. Implemented Lean Manufacturing and a second shift with the

following results:

. Reduced past due shipments for the factory by 85% from $750k to 85k.

. Managed the doubling of staff on the floor, increasing regular

employee head count from 45 to 90 employees in a period of 9 months.

. Reduced scrap by 16.7% from $300k to $250k.

Factory Manager (continued)

Responsible for 15 employees building hydraulic system control and pressure

differential indicators for commercial and military aircraft. Directed

Assembly, Manufacturing Engineering, Material Planning, Purchasing, and

Quality Assurance in a Focused Factory environment. Implemented Lean

Manufacturing techniques in the Assembly Department. Work Cells, Kanban, in-

line inspection and one-piece flow resulting in:

3. 20% reduction of assembly and test time

4. 75% improvement in past due to customers

Factory Supervisor

November 2001 - September 2003

PTI Technologies Inc. (Div of ESCO) Oxnard, CA

Responsible for 2 people in a FAA certified repair station. Organized and

planned all orders in the department and integrated the Contracts and

Operations staff.

Planner

July 2000 - November 2001

PTI Technologies Inc. (Div of ESCO) Oxnard, CA

Responsible for the planning and shipment of orders in the Aerometal and

Industrial lines, working with management on labor needed for the

department, and the development of a leaderless work cell. On-time

shipments in this department increased from 70% to 95%.

Planner

June 1999 - July 2000

Kavlico Inc. Moorpark, CA

World leader in the design, manufacturing and marketing of high technology

electrical sensory equipment used in Aerospace, Defense, and Industrial

applications.

Responsible for the scheduling and status of $2 million per month in

shipments of Linear Variable Differential Transducers (LVDT's) for

Aerospace applications. Participated on cost reduction teams.

Communications Technician

October 1998 - June 1999

Integrated Communications Systems Inc. Canoga Park, CA

Junior Consultant

January 1998 - July 1998

Engel Consulting Services, Ojai, CA

EDUCATION

M.B.A., California Lutheran University - Finance Option

B.A. California State University, Northridge - Operations Management

Option



Contact this candidate