Jason Muldoon
**** ****** ***. *********, ** ****0 Phone: 805-***-**** email:
***********@*******.***
Areas of knowledge and expertise
Program Management / Offshore Manufacturing / Process Reengineering / Lean
Manufacturing
ERP Implementation / Turnaround Management / Aftermarket Service and Repair
Summary
High performance Manufacturing Operations Executive. A visionary respected
for turnaround abilities and bottom line focus. Adept at finding new
productive processes, and using superior leadership skills to develop
strong esprit de corps. Record of proven results in reducing costs,
improving operational performance, and establishing manufacturing as a
competitive advantage.
1. Reorganized and revitalized PTI Element Factory; rebuilt management
team; organized an effective second shift; implemented capacity
planning capability reducing past due orders by 85% from $750k to
$85k.
2. Implemented Lean Manufacturing techniques on the 737 lay-up line;
Established moving line; Kanban; In-line inspection and one-piece flow
resulting in a 20% reduction of assembly time and increasing
flexibility
WORK HISTORY
Operations Manager
August 2009 - January 2010
Skurka Aerospace, Camarillo, CA
World leader in the design and manufacture of Motors for Aerospace
Applications
Responsible for the setup and production of the Starter Generator Line,
relocated from a Holtsville, New York facility to its current location in
Camarillo.
. Developed and maintained schedules for both internal and customer
needs.
. Managed and spares inventory needs during transition from facilities.
Operations Manager
November 2006 - August 2009
Ducommun Aerostructures Inc. Monrovia, CA
World leader in the manufacture of composite and metal bonded structure for
Aerospace applications.
Responsible for all aspects of a two-shift multi plant bonded panel
operation for the Boeing 737. Directed Assembly, Manufacturing
Engineering, Material Planning, and Quality Assurance in a Focused Factory
environment. Used lean manufacturing concepts, including percent load
charts, takt time, and action item lists, in the department with these
results to date:
. Provided operations voice to the customer for conference calls and
quarterly program reviews
. Implemented moving line for the pre-bond assembly
. Worked with customer on project to move post bond operations from the
Monrovia facility to a start up facility in Guaymas, Mexico.
. Reduced front end production hours by 20%
. Participated in new business proposals for the facility.
. Participated in contract negotiations with the union, resulting in an
accomplishment of management goals.
Factory Manager
September 2003 - November 2006
PTI Technologies Inc. (Div of ESCO) Oxnard, CA
World leader in the design, manufacture and marketing of high technology
filter elements, modules, and filtration and fluid flow equipment used in
Aerospace, Defense, and Industrial applications.
Responsible for 100 employees in a two-shift filter element assembly
operation. Directed Assembly, Manufacturing Engineering, Material
Planning, Purchasing, and Quality Assurance in a Focused Factory
environment. ISO 9001:2000, AS 9100A: 2001, D6-82479 and QS 9000
certified. Implemented Lean Manufacturing and a second shift with the
following results:
. Reduced past due shipments for the factory by 85% from $750k to 85k.
. Managed the doubling of staff on the floor, increasing regular
employee head count from 45 to 90 employees in a period of 9 months.
. Reduced scrap by 16.7% from $300k to $250k.
Factory Manager (continued)
Responsible for 15 employees building hydraulic system control and pressure
differential indicators for commercial and military aircraft. Directed
Assembly, Manufacturing Engineering, Material Planning, Purchasing, and
Quality Assurance in a Focused Factory environment. Implemented Lean
Manufacturing techniques in the Assembly Department. Work Cells, Kanban, in-
line inspection and one-piece flow resulting in:
3. 20% reduction of assembly and test time
4. 75% improvement in past due to customers
Factory Supervisor
November 2001 - September 2003
PTI Technologies Inc. (Div of ESCO) Oxnard, CA
Responsible for 2 people in a FAA certified repair station. Organized and
planned all orders in the department and integrated the Contracts and
Operations staff.
Planner
July 2000 - November 2001
PTI Technologies Inc. (Div of ESCO) Oxnard, CA
Responsible for the planning and shipment of orders in the Aerometal and
Industrial lines, working with management on labor needed for the
department, and the development of a leaderless work cell. On-time
shipments in this department increased from 70% to 95%.
Planner
June 1999 - July 2000
Kavlico Inc. Moorpark, CA
World leader in the design, manufacturing and marketing of high technology
electrical sensory equipment used in Aerospace, Defense, and Industrial
applications.
Responsible for the scheduling and status of $2 million per month in
shipments of Linear Variable Differential Transducers (LVDT's) for
Aerospace applications. Participated on cost reduction teams.
Communications Technician
October 1998 - June 1999
Integrated Communications Systems Inc. Canoga Park, CA
Junior Consultant
January 1998 - July 1998
Engel Consulting Services, Ojai, CA
EDUCATION
M.B.A., California Lutheran University - Finance Option
B.A. California State University, Northridge - Operations Management
Option