Gary W. Mangum
P.O. Box ***
Thatcher, AZ *****
928-***-**** or Cell 928-***-****
Email: ********@********.***
QUALIFICATIONS
COORDINATNG. Experience in working equally and fairly with all people.
Able to resolve conflicts and promote a professional working relationship
between all parties. I'm Assertive and reliable in coordinating all phases
of work.
CREATIVE INITIATIVE. Self-directed and able to arrive at unique
solutions for problems that might arise. Open to new techniques and
methods. Receptive and open to ideas, and input from all levels of
management. Strong supporter of team management concept.
PROFESSIONAL EXPERIENCE
PROJECT MANAGER. Project Manager on numerous projects with responsibility
for contracts, pay requests, billings, change orders, project closeout and
closeout documents. Proven ability to assist not only on the technical end
of construction but the business end of the industry. Extensive experience
with budgets (planning and implementation), manpower resource, and
scheduling.
CONSTRUCTION MANAGER / INSPECTOR. Represented the owner in design,
administrative and construction phases. Worked on coordination of
Architects, Engineers, Consultants and Department Heads to facilitate
proper installation and accommodation of owner-provided equipment. Provided
inspection of all phases of construction projects from site work to
certificate of occupancy.
GENERAL CONSTRUCTION BACKGROUND. Trades - framing, concrete, drywall,
remodeling and painting. Drafting and design work. Three years of
Construction Management at Brigham Young University.
GENERAL CONTRACTOR. Circle M Contracting Services- Privately owned
Commercial Construction and Construction Management Company serving
southeast Arizona.
ESTIMATOR. Estimated numerous projects for government and private sector,
ranging from $20,000 to $100 million. Projects types ranging from
residential homes to airports and casinos. Provided accurate detailed
information for clients. Worked on competitive bids ranging from $500,000
to $10 million. Certified for MC2 estimating program.
SCHEDULING. Experienced in Primavera, Sure Track and Microsoft Projects
Scheduling program using CPM logic and Bar Graph method. Detailing specific
itemized activities with accurate durations and relationships. Can
interpret, analyze and forecast schedules.
SUPERINTENDENT. Supervised project's coordinating, scheduling and
interfacing with sub contractors and suppliers. Knows and promotes quality,
professional workmanship. Looks for and promotes craftsman in the
construction industry. Supervised projects for the Tech Industry, Health
Services, Churches and Schools.
EMPLOYMENT AND PROJECT HISTORY
FARNSWORTH CONSTRUCTION September 1983 to December 1987
(Estimator/Project Manager)
Gilbert High School Phase III (Gilbert, AZ) $6.4 million Cutter
Aviation (Phoenix, AZ) (Estimator Only) $5.7 million
Leisure World Recreation Center (Mesa, AZ) $3.4 million LDS
Churches (Seven in Arizona) $1.2 to $1.7 million
U.S. Post Office (Show Low, AZ) $2.1 million FAA Control Tower
(Scottsdale) (Estimator Only) $1.8 million
F.A.A. Control Tower (Prescott, AZ) $1.2 million Arizona Bank
Phase II -
Mesa Main Branch (Mesa, AZ) (Superintendent)
$2.8 million
K.J. CONSTRUCTION December 1987 to August 1988 (Project Superintendent)
LDS Church (Mesa, AZ) $1.3 million
J.R. PORTER CONSTRUCTION November 1988 to May 1989 (Estimator / Project
Manager)
Century Medical Plaza (Hawthorne, CA) $5.5 mill General Warehouse
U.S.Navy (Pt. Hueneme, CA) $3.8 million
LAYTON SOUTHWEST June 1989 to August 1990 (Estimator / Project
Manager)
Apache Elementary -
Peoria Unified School District (Peoria, AZ) $4.4 million Arizona
Historical Museum (Tempe, AZ) $7.5 million
A.D.O.T. Material Testing Lab (Phoenix, AZ)$3.7 million
STATE OF ARIZONA DEPARTMENT OF ADMINISTATION January 1991 to May 1994
As Construction Specialist for the Facilities Design and Construction
Department of DOA I coordinated material procurement for the inmate
labor construction Program at the Safford and Tucson Prison Facilities.
DECCA CONSTRUCTION May 1994 to Dec 1994 (Project Superintendent)
Thatcher Wal - Mart Expansion (Thatcher, AZ) $7.1 million
CHANEN CONSTRUCTION February 1995 to June 1996 (Estimator)
Numerous jobs as conceptual estimator including Sky Harbor 3rd Runway
and Air National Guard Relocation, Paris Casino (Las Vegas, NV),
Shopping Centers and Indian Casinos.
AU' AUTHUM KI November 1996 to November 2000 (Estimator, Project Manager &
Superintendent)
Inscription House Fire Sprinkler Retrofit (Inscription House, AZ)
$125,000
Building 506 Yuma Marine Corps Air Station (Yuma, AZ)
$140,000
Enlisted Men's Mess Yuma Marine Corp Air Station (Yuma, AZ) $1.7
million
Safford Unified School District Construction Management $7
million
Saddleback Communications (Scottsdale, AZ) $734,000
BSL 3 Building 56 Tucson Veterans Administration Hospital (Tucson,
AZ) $220,000
CIRCLE M CONTACTING SERVICES November 2000 to February 2001 (Construction
Manager / Consultant)
Mt. Graham Community Hospital (Safford, AZ) independent consultant
and construction manager for the hospital.
KITCHELL CEM February 2001 to September 2003 (Project Manager)
Working as an area Project Manager over AFSB Deficiency Projects. Over
seeing over 160 individual projects for fourteen School Districts in
Eastern Arizona. Project ranged from site drainage to replacement
schools, exterior basketball courts to HVAC replacement. My
responsibilities included coordination of project design, bidding and
construction. I worked closely with all Districts, contractors and
local agencies. I worked extensively with the ASFB on all phases of the
program.
THATCHER UNIFIED SCHOOL DISTRICT September 2003 to Present (Director of
Operations)
Responsibilities included management of all facilities. Coordinating
all Maintenance activities (Staff size 7 1 supervisor, 1 skilled
worker, 1 groundskeeper, 1 shipping & receiving 1 matron and 2 crossing
guards). Construction activities, both contracted and in house projects
including coordinating architectural and engineering services, bidding
and contracting services. Overseeing all Transportation activities
involving 10 buses, 6 vehicles and 10 support vehicles (Staff size 1
supervisor, 7 drivers 1 part time worker). Coordinating Food Service
Operations for the District. (Staff size 1 supervisor, 9 kitchen
workers). Scheduling of District Facilities for non-educational
activities. Responsible for establishing and monitoring all budgets for
each division. Coordinate all activities with the Arizona State School
Facilities Board.