Post Job Free

Resume

Sign in

Quality Control Project

Location:
Irving, TX, 75061
Posted:
August 01, 2010

Contact this candidate

Resume:

Donald A Dobbertin

*** ****** **** ******, ** ***61

832-***-****

214-***-**** (home phone)

abl6na@r.postjobfree.com

Objective:

I am seeking employment as a Superintendent

Education:

- Stevens Point Area Senior High School (Stevens Point, WI)

- Mid State Technical College (Stevens Point WI) (Aug 1988 – April 1989)

Written communication

Oral communication

Business Math

Police report writing

Work experience:

Journeyman Construction out of Austin, TX

Title: Superintendent

2009-Present – “Dart” Ways Structure & Amenities facility

This project is a $10,000,000 Office, Shop Core and Warehouse structure that is a part of the

“Dallas Rail Transit System”.

Hanover R.S limited partnership out of Houston, TX

Title: Assistant Superintendent

2008 - 2009 – The Ashton 101 (Austin, TX)

This project is a 259 unit residential high rise with a 6 floor below ground garage and pool deck.

Project is estimated to cost $81,000,000.00.

2006 – 2008 -The Cirque (Dallas, TX)

This project is a high end, 28 story residential apartment complex with 252 units with a 6 floor

garage and pool deck. It also included a second and third floor luxurious club house. The cost

to build this project was about $60,000,000.00.

2004 – 2006 -The Lofts at Las Colinas (Irving, TX)

This project involved in refurbishing / rebuilding fire damaged garage and complex and

eventually finishing the project. The four story urban lofts apartment complex consists of 240

units with a luxurious clubhouse and two court yards. The project estimated cost was

$39,000,000 with an additional $18,000,000 in fire damage.

Manhattan Construction Co., Tulsa, OK

Title: Assistant Superintendent

2000-2002 Quick Trip Corporate Campus, Tulsa OK -

2002-2004 MOB – Natalie Medical office building in Tulsa, OK

Duties performed but not limited to:

Wall and ceiling cover up inspection.

- Punch list for MEP’s before cover up

- Punch list for fire caulk in corridors and demising walls

Managing subcontractors to complete finish end.

- Maintain and track subcontractor progress with a three week look ahead schedule

- Create punch lists (rough and final)

- Schedule appliance deliveries – track serial and modal numbers of all appliances

- Quality control of all FHA / ADA regulations.

- Assisted in getting TCO and Final CO

Structural work:

- Pan deck form work

- Nelson studs (ping test)

- Rebar inspection (grade beams, piers, shear walls, columns, slab and walls)

- Understand laps for continues rebar sections

-“Quality Control” of post tension cable installation

-“ Quality Control” of embed installation (window system, slab, shear walls and columns)

- Tracked cylinders for break test

- Set controls lines

- “ Quality Control” of water proof installation and flashing details (pictures)

Civil

-“ Quality Control” of all MEP underground work (pictures and subcontractor sign off sheets)

- Compaction test

- Schedule MEP inspections

Safety

- Safety audits

- Safety orientations

- Held monthly safety meetings

- Weekly Inspections on rigging, crane, buck hoist, placement boom and machinery

- Managed all documentation of Subcontractors

Safety audits

Certification

Tool box meetings

Training

OSHA 10 hr

OSHA 30 hr

Swing stage certification

Class 7 fork lift certification



Contact this candidate