Project Manager Engineer

Location:
Maryland Heights, MO, 63043
Posted:
August 02, 2010

Contact this candidate

Resume:

Gary T. Klipfel, PMP, CCM

***** ******** - ******** *******, ** 63043 - abl5z1@r.postjobfree.com -

Cell 314-***-**** -

Home 314-***-**** - http://www.linkedin.com/in/garyklipfel

SUMMARY

Senior Project / Construction Manager specializing in all sizes of projects

including site infrastructure, utility systems, new building construction,

facility renovations, office and conference facilities, warehousing,

chemical & biologics pilot plants and production facilities, vaccines,

research laboratories, quality control facilities. green building

construction, permitting, validated facilities and systems, expansions,

facility shutdowns, and production operations. These activities included

projects from initial planning and conceptual design through construction,

commissioning, validation, and project closeout.

PROFESSIONAL EXPERIENCE

Pfizer Inc (Dec 1983 - Present) (26 Years)

Senior Project Manager / Construction Manager (Chesterfield, Mo)

(April 2003 - Present)

Assigned to manage major capital projects (>$3MM) at the Chesterfield

campus from conceptual design through project completion.

o Completed a $80MM 60,000 sqft. addition of biologics pilot plant

building.

> Included bioreactor suite, 2 purification suites, GMP

warehouse, office space, and utility plant additions.

Project required to be completed while maintaining critical

ongoing research operations.

o Completed the $30MM construction of a new 40,000 sqft. quality

control and cell banking building.

> Managed the site selection process for this building

including building arrangement, utility planning, and

permitting issues.

> Coordinated with the corporate compliance to ensure FDA and

other agency approval of this facility in a timely manner.

o Completed the $20MM renovation of 40,000 sqft. pilot plant and

laboratory building

> Coordinated the construction while maintaining operations

within the building during construction.

o Completing the design and construction of a pilot plant

modification for conversion to vaccine production.

o Developed and implemented the site construction logistics and

safety plan. Led the safety leadership team for each of the

projects. Implemented a worker safety awareness program on each

project.

o Coordinated as owner representative all permitting activities

for the projects in the St. Louis area.

o Managed the shutdown and logistics planning for construction

adjacent to operating facilities. Including coordination of

activities with other organizations.

o Led the team that completed bid package preparation, contractor

qualifications, bid reviews, and final contracting decisions for

design, construction management, construction, commissioning,

and validation for each of the projects.

o Coordinated the project team during the conceptual design

planning, design management, value management, estimates,

constructability reviews, and final budget development.

o Completed evaluations of green building concepts (LEED) for new

facilities.

Gary T. Klipfel, PMP, CCM

12163 Foxpoint - Maryland Heights, Mo 63043 - abl5z1@r.postjobfree.com -

Cell 314-***-**** -

Home 314-***-**** - http://www.linkedin.com/in/garyklipfel

o Generated the documents for capital budgeting and funding

approval of the projects.

o Facilitated the risk management planning and periodic reviews

during construction.

o Analyzed and approved the earned value methodology used for

project cost control.

o Completed Black Belt Certification for Six Sigma projects.

o Developed the procedure used for review and approval of change

orders during construction activities.

o Guided the team during construction including safety, change

management, quality control, labor relations, risk management,

cost control, earned value, cash flow management, and schedule

reviews.

o Proficient in conducting and participating in safety and project

peer reviews for large capital projects.

o Proficient in planning, scheduling, and coordinating startup,

commissioning, and validation activities.

Pharmacia Inc - St. Louis, Mo (Feb 2001 - April 2003)

Senior Project Manager

Assigned to manage major capital projects (>$3MM) at the Chesterfield

campus from conceptual design through project completion.

o Managed the design phase of $200MM pharmaceutical research

building.

> Included the conceptual planning, detailed design, and

estimating.

o Completed a $55MM 60,000 sqft biologics pilot plant building

project.

> Transferred to the project with significant financial and

schedule issues.

> Responsible for bringing the project under control of

scope, budget and schedule.

o Assisted as part of the team in the partnering selections for

engineering and construction management organizations.

Pharmacia Inc - Kalamazoo, Mi (May 1996 - Feb 2001)

KAPI Senior Project Manager

Assigned to manage all projects in 8 fermentation and downstream

processing buildings with a team of 10 engineers and designers.

o Completed ~ 20 projects per year of various sizes from $10K to

$6MM.

o Completed the $6MM upgrade and modernization of fermentation

production facility while maintaining production operations.

o Upgraded a production fermentor to an full scale experimental

unit with 1500 Hp VFD agitator drive.

o Modernized of a fermentation separation processing facility with

a minimum of shutdown time utilized.

Gary T. Klipfel, PMP, CCM

12163 Foxpoint - Maryland Heights, Mo 63043 - abl5z1@r.postjobfree.com -

Cell 314-***-**** -

Home 314-***-**** - http://www.linkedin.com/in/garyklipfel

Upjohn Co - Kalamazoo, Mi (July 1990 - May 1996)

Project Engineer

Responsible for the control system design and implementation within

the fermentation and downstream processing facilities.

o Completed the control systems implementation of an automated

$25MM bio-tech separation facility including equipment design,

installation, programming, and startup.

o Completed the $4MM upgrade of the Fermentation Pilot Plant.

o Served as chairman of Instrument Standards and Intrinsic Safety

Committees for three years.

Upjohn Co - Kalamazoo, Mi (Dec 1983 - July 1990)

Senior Control Systems Engineer

Design engineer for a number of automation and control project in the

pharmaceutical manufacturing / packaging facility.

OTHER EXPERIENCE

Lead Control Systems Engineer, Brown & Root, Inc, Houston, Tx (Feb 1980 -

July 1983)

Lead Control Systems Engineer, Stanley Consultants, Muscatine, Ia (Jan

1979 - Feb 1980)

Control Systems Engineer, Bechtel Engineers, Houston, Tx. (May 1978 - Jan

1979)

Control Systems Engineer, Fluor Engineers, Houston, Tx (July 1976 - May

1978)

Process / Instrument Engineer, Austin Company, Des Plaines, Ill (Sept

1973 - June 1976)

EDUCATION

o BS - Chemical Engineering - Michigan Technological University

ASSOCIATIONS & CERTIFICATIONS

o Project Management Professional (Since 2000);

o Masters Certificate in Project Management (George Washington

University)

o Certified Construction Manager

o OSHA 30 Hour Safety Certification

o Black Belt Certification (Six Sigma)

o Member Project Management Institute

o Member Construction Management Association of America

Keywords: Project, Project Management, Construction, Construction

Management, PMP, Project Management Professional, CCM, Certified

Construction Manager, OSHA, Safety, Risk Management, Logistics, Earned

Value, Cost Control, Design Management, Value Management, Laboratories,

Shutdowns, Retrofit, Pilot Plants, Offices, Warehouses, cGMP, GMP,

Validation, Commissioning, utilities, FDA, Automation and Controls, Black

Belt, Six Sigma, PMI, CMAA, Chemical Engineer, Project Engineer, Contractor

Qualifications, Bid Preparation, Bid Reviews, Contracting, permitting,

budgets, funding, chemical, biologics, vaccines, pharmaceuticals, change

management, Quality Control, Shutdowns, Fermentation, Purification, Owner

Representative, Scheduling, Startup, Site Selection, research, production,

change orders, peer reviews, presentations, reports, equipment, equipment

arrangements, conceptual design, architectural review, estimating, 30 Hour,

site systems, underground systems, buildings, 3D design.