Post Job Free
Sign in

Technician Fiber Optic

Location:
Indiana, PA, 15701
Posted:
August 03, 2010

Contact this candidate

Resume:

JAMES A DOMINO

*** ****** ****

Indiana, PA *****

724-***-****

Summary

Eighteen years of experience performing the installation of network and

communications cable plant at a variety of secure and non-secure locations.

I have a working knowledge of Red/Black requirements, BICSI standards, and

ANSI/TIA/EIA standards and practices for twisted pair, both UTP and STP,

and fiber optic cable installation, termination, and testing. I have

experienced installing metallic (solid tray, basket tray, j-hooks, EMT

conduit, etc.) and non-metallic (Tellure, Panduit, Wiremold, etc.) cable

conveyances and pathways. I have installed equipment racks, patch panels,

routers, servers, and associated network equipment; terminated fiber optic

and copper cables; installed communications outlets in furniture and on

walls; and tested and validated backbone links. I have used state-of-the-

art test equipment daily to test copper and fiber cable infrastructure

installations. I am a self-motivated and mature professional with

knowledge and experience performing the installation and maintenance of

electronic communications systems.

Education and Training

Wrightco Technologies-Combination Telecommunications and Electronics,

alarm installation and troubleshooting, 455 hours of Technical and hands on

training. Feb 1993-May 1993, Ebensburg, PA

Experience in overseas work, 2008

Professional Certifications

Design and Installation of Future FLEX Air-Blown Fiber Cabling Systems,

Sumitomo Electric Lightwave Corporation, April 2007

Valcom-Certification in loudspeaker paging systems

Inter-Tel-Certification in GLX installation

ITI-Certification in installing, troubleshooting and service

BICSI Installer, Level I

BICSI Installer, Level II

Obtained TS Clearance, February 2008

Obtained SCI Clearance, October 2009

Experience

INDUS Secure Network Solutions July

2005 - Present

Electronic Technician II/Lead Position Robert Williams

301-***-****

Current responsibilities include installing infrastructure, cabling, power

and ground at secure and non-secure facilities. Infrastructure support

includes preparing and installing racks, cabinets, cable tray pathway and

conduit. As an installer, prepare, pull, terminate and test a variety of

Category 3/5/5e/6 twisted pair cables, including high count, and both

single-mode and multi-mode fiber optic cables in horizontal and riser

applications. Additional duties include installing rack mount equipment

and patch panels, dressing and routing cables within workspaces and

labeling all work. Also install cabling conveyances - j-hooks, basket tray,

solid tray, EMT conduit, and cable ladder.

Halifax Corporation February 2005

- July 2005

Electronic Technician II/Lead Position John Hausman 301-

241-3780

Responsibilities included installing infrastructure, cabling, power and

ground at secure and non-secure facilities. Infrastructure support included

preparing and installing racks, cabinets, cable tray pathway and conduit.

As an installer, prepared, pulled, terminated and tested a variety of

Category 3/5/5e/6 twisted pair cables, including high count, and both

single-mode and multi-mode fiber optic cables in horizontal and riser

applications. Additional duties included installing rack mount equipment

and patch panels, dressing and routing cables within workspaces and

labeling all work. Also installed cabling conveyances - j-hooks, basket

tray, solid tray, EMT conduit, and cable ladder

Falcon Data Com Inc. June 2003 to February

2005

Technician/Installer Matt Sewack 718-

758-9100

Trouble-shooting and repair of phone lines

Installation of phone lines and jacks

Worked with residential wiring from NID to jack

Data Cabling Solutions March 1995 to July 2002

Installation Lead Andrew G.

Dever 216-***-****

Supervised five employees installing cable and building racks

Installed and terminated data, voice, coax, Cat 5 and 5E, backbone, riser

cable and fiber optics

Read blueprints correctly to ensure quality installation

Trouble-shooting, toning, tracking, testing, terminating of cable lines

using various test equipment

MDF & IDF experience

Closet and rack set-up

Richardson Telecommunications March 1995 to June

1998

Installation Lead

Larry Kaddy 888-

851-4391

Supervised six employees installing Cat 5 cable

Read and followed blueprints for installation purposes

Installed and terminated Cat 5 and 5E, backbone, riser cable, and fiber

optics

Cablemasters Corporation December 1993 to

November 1994

Job Title: Installer Jim Bosco 814-838-

1466

Installed data, voice, and coax cable and fiber optics

Toning, tracking, testing, and terminating, cross connecting and

troubleshooting



Contact this candidate