Post Job Free
Sign in

Project Design

Location:
Kingsley, IA, 51028
Posted:
August 03, 2010

Contact this candidate

Resume:

CURRICULUM VIATE

[pic]

Mr. Dip Kumar Das

Building No. - Star - 4

Burdubai

Dubai

PO Box - 51028

United Arab Emirates

Home : +971-*********(After 9PM)

Work : +971-**-*******

Cell : + 971- 501513022

Email : ********.***@*****.***

***********@**********.***

Age : 31 Years

Profession: Bridge and Structural Design Engineer

Nationality: Indian

Marital Status: Married

Passport Number & Expiry Date: B - 2721671, 10/2011

EDUCATION DETAILS

Dibrugarh University 07/95 - 11/99 B.E Civil

Engineering

Used Design Standard American Association of State

Highway and Transportation Officials

( AASHTO)

Indian Road

Congress ( IRC )

WORK EXPERIENCE

Myself a graduate in civil Engineering having around 11 years of experience

in design and rehabilitation of bridges and other structures. This includes

conducting site investigations, reconnaissance and detailed physical

survey, hydraulic calculations, fixing of span arrangement, condition

survey of bridges and preparation of preliminary and detailed designs and

working drawings, for all components of the project. The experience also

embraces preparation of specifications of bill of quantities, rate

analysis, preliminary and detailed cost estimates, tender documents and

preparation of tender designs and technical proposals for prospective

projects; Have been engaged in the preparation of detailed design and

drawings of various type of bridges, flyovers, interchanges etc.

In this period I designed so many Highways Bridges like Reinforcement

Concrete structures, Post Tension and Pre Tension structures, Steel

Structures and Industrial structures. I also did concept design,

geotechnical report study, attend client meeting, approve design

calculation from client, proof checking, solve site query, site visit etc.

I explain my entire experience in different organization in below. I have

experience with American Standard (AASHTO) as well as Indian Standard

(IRC).

( Aug 2007 to till date Bridge/Structural Design Engineer

AECOM

Dubai, UAE

. King Abdullah Financial District in Kingdom of Saudi Arabia

King Abdullah Financial District is a very prestigious project in

Kingdom of Saudi Arabia. This project contents

Four phase mentioned below.

a. Service Tunnel - Service Tunnel consists of 1800 m length cut and

cover tunnel. This tunnel also include

Maintenance Entrance, Connection Chamber, Corner Section, Opening

details for difference services .

b. Area 1 - Area 1 consists of 2000 m length Double Deck Bridge. It

consists of three level .That is Deck level, Subterenean level and

Utilities level. Deck level and Subterenean level used for highway

traffic and

Utilities level used for utility services. This project consist of

thirty four Bridges,2000 m length service Tunnel, three Ramp etc.

In this project used RCC and Post - tension Box girder, cut and

cover RCC tunnel, RCC slab for Ramp and open foundation with

circular piers used for all bridges.

c. Thumamah Road - Thumamah Road consists of one interchange, four

underpass and one travelator

underpass. In this project used Post-tension Box girder, cut and

cover RCC underpass and Travelator

Tunnel and open foundation with piers used for all bridges.

d. Package: 4 - Package: 4 consists of fourteen Bridges. In this

project used Post-tension Box girder and open foundation with piers

used for all bridges.

. Preparation of Detailed Project Report for Rehabilitation of Jebel Ali

Lihbab Road Phase 5 under Road and Transport Authority of UAE.

The project contents Two Under Passes and each Under Pass near about One

km length. In this project used RCC Closed Box, Open U Frame and

Retaining Wall for different height .I was also responsible for

rehabilitation of existing structures.

. Preparation of Detailed Project Report for Improvement of Creek Crossing

under Road and Transport Authority of UAE.

It is a world rank biggest project near about Five Kilometres length

Elevated Structure .Here all the Bridges are Segmental Construction. All

the Superstructures here used Box girder with Internal Post - Tension and

all the Bridges here three to Four span Continuous structures. Pile

Foundation with different shape pier used here as a Substructure.

. Preparation of Detailed Project Report for Improvement of Al Khail Road

under Road and Transport Authority of UAE.

This project includes Six Phases and this Six Phases contents Thirteen

Junctions and each junction contents Three to Four Bridges. In this project

all the bridge's are (Three to Four Spans) Continuous with Horizontal

Curve. Multi Cellular Post- Tensioned Box Girders are used as a

Superstructure and Hummer Head type Columns and Pile Foundations are used

as a Substructure. This project also includes design of Box Culverts, Earth

Retaining Wall etc. Construction is going on.

. Preparation of Detailed Project Report for Development of Gate 4 in Jafza

under Jafza Authority of UAE.

This project includes One Junctions with Three Bridges and One Under Passes

under the junction. In this project all the bridge's are (Three to Four

Spans) Continuous with Horizontal Curve. Multi Cellular Post- Tensioned

Box Girders are used as a Superstructure and Hummer Head type Columns and

Pile Foundations are used as a Substructure. Under Passes are a totally RCC

structure and content Close and Open U frame .Design of Earth Retaining

Wall for different height.

. Preparation of Detailed Project Report for Rehabilitation of Jebel Ali

Lihbab Road Phase 4 under Road and Transport Authority of UAE.

The project contents Three Junctions and each junction Three to Four

Bridges. In this project all the bridge's are ( Four to Five Spans )

Continuous with Horizontal Curve. Multi Cellular Post- Tensioned Box

Girders are used as a Superstructure and Hummer Head type Columns and

Pile Foundations are used as a Substructure. I was also responsible for

rehabilitation of existing structures.

. Preparation of Detailed Project Report for Rehabilitation of Jebel Ali

Lihbab Road Phase 3 under Road and Transport Authority of UAE.

The project contents Twenty Seven Bridges (27 nos. ) . In this project all

the bridge's are ( Four to Five Spans ) Continuous with Horizontal Curve.

Multi Cellular Post- Tensioned Box Girders are used as a Superstructure and

Hummer Head type Columns and Pile Foundations are used as a Substructure.

This project also includes design of Under Passes, Box Culverts, Earth

Retaining Walls etc .Under Passes is a totally RCC structure and content

Close part and Open U frame part .Design of Earth Retaining Wall for

different height Construction is going on . I was also responsible for

rehabilitation of existing structures.

. Preparation of Detailed Project Report for Rehabilitation of Ittihad Road

under Road and Transport Authority of UAE.

The project includes Four Phases and this Four Phases contents Ten

Junctions. In this project all the bridge's are (Four to Five Spans)

Continuous with Horizontal Curve. Multi Cellular Post- Tensioned Box

Girders are used as a Superstructure and Hummer Head type Columns and Pile

Foundations are used as a Substructure. This project also includes design

of Under Passes, Box Culverts, Earth Retaining Walls etc .In this Under

Passes some part Pre tensioning and some part RCC structure and content

Close and Open U frame .Design of Earth Retaining Wall for different

height. I was also responsible for rehabilitation of existing structures.

. Preparation of Detailed Project Report for Sharjah Investment Park,Under

UAE Government.

The Project includes different size of RCC box culverts above Gas Pipe

lines crossing Road.

. Preparation of Detailed Project Report for Al Masaood Project, Under UAE

Government

The Project include 300 m length RCC Intrigue Frame type Tunnel for

Vehicular movement.

Responsibilities: 1. Prepared Final design calculation and Drawings.

2. Approve the project from Client.

3. Short out Clint query.

4. Prepared concept design.

5. Prepared Preliminary design for Project.

6. Attend Client meeting.

7. Guide Junior Engineer and Cad Person.

8. Handle project and Client independently.

9. Discuss Financial issue with Client.

10. Discuss tender related problem with Tender

and Contract division.

11. Discuss construction related problem with

Contractor.

12. Collect payment from Client.

13. Attend internal meeting.

14. Preparing project delivery schedule .

Over all Responsibilities:

- Solve Site query and prepared design and drawings.

- Study Geotechnical report

- Structural design

- Checking of structural design and drawings

- Review design and drawings

- Approval same from the client

- Condition Survey of existing structure

- Feasibility study

- Concept Design

- Attend client meeting

- Proof Checking

Used Soft ware- Autocadd 2006, Sap -2000, Conbox, RC Pier, PCA

Column, Micro Station,

Staad pro -2006, MS-Office, Midas Civil

( March 2007 to August 2007 Bridge/Structural Design Engineer

Louis Berger Ltd.

New

Delhi

. Preparation of Detailed Project Report for Kiratpur in Himachal Pradesh,

India, NH-21, under National Highway Authority of India .

The project contents 70 culverts, 40 Minor Bridges and 12 Major Bridges.

In this project structures used like RCC Box for culverts with different

size, RCC Solid Slab, RCC I-Girder, RCC Voided Slab used for Minor

Bridges and PSC I Girder and PSC Box Girder used for Major Bridges .

Substructures used in this like Open Foundation, Pile Foundation and Well

Foundation. In this project I was also responsible for design of Steel

Staging.

. Preparation of Detailed Project Report for Tada- Nollore in Andra Pradesh, India, NH-32, National Highway Authority of India .

The project contents 20 culverts, 10 Minor Bridges and 2 Major Bridges.

In this project structures used like RCC Box for culverts with different

size, RCC Solid Slab, RCC I-Girder, RCC Voided Slab used for Minor

Bridges and PSC I Girder ( Pre -Tension) and PSC Box Girder used for

Major Bridges . Substructures used in this like Open Foundation, Pile

Foundation and Well Foundation.

. Preparation of Detailed Project Report for Madurai, India, NH-45,

National Highway Authority of India .

The project contents 80 culverts, 45 Minor Bridges and 8 Major Bridges.

In this project structures used like RCC Box for culverts with different

size, RCC Solid Slab, RCC I-Girder, RCC Voided Slab used for Minor

Bridges and PSC I Girder and PSC Box Girder used for Major Bridges .

Substructures used in this like Open Foundation, Pile Foundation and Well

Foundation. In this project I was also responsible for design of Steel

Staging.

Responsibilities: 1. Prepared Final design calculation and Drawings.

2. Approve the project from Client.

3. Short out Clint query.

4. Prepared concept design.

5. Prepared Preliminary design for Project.

6. Attend Client meeting.

7. Discuss tender related problem with Tender

and Contract division.

8. Discuss construction related problem with

Contractor.

9. Attend internal meeting

Over all Responsibilities:

- Design of staging

- Study Geotechnical report

- Calculation of hydraulic data

- Structural design

- Checking of structural design and drawings

- Review / Proof Checking of design and drawings

- Approval same from the client

- Condition Survey of existing structure

- Feasibility study

- Concept Design

- Attend client meeting

- Proof Checking

- Solve Site query and prepared design and drawings.

Used Soft Ware - Autocadd 2006, Staad pro -2004, MS-Office

( Feb 2004 to March 2007 Bridge/ Structural Design Engineer,

Feedback Turnkey

Engineers Pvt.

Ltd., New Delhi

. Preparation of Detailed Project Report for Silchar to Udarband to

Harangajo, NH-54, Km 244 to Km 275 (Package No. C-III/30), National

Highway Authority of India, Feb 2005

The project contents 96 culverts, 25 Minor Bridges, 1 ROB, 2 Fly over

and 8 Major Bridges. In this project structures used like RCC Box for

culverts with different size, RCC Solid Slab, RCC I-Girder, RCC Voided

Slab used for Minor Bridges and PSC I Girder and PSC Box Girder used

for Major Bridges . Substructures used in this like Open Foundation, Pile

Foundation and Well Foundation. In this project I was also responsible

for design of Steel Staging.

..

. Preparation and updation of feasibility study and DPR for two laning of

State Highways, MDRs in Chattisgarh state, ADB funded, Chattisgarh State

PWD, March 2005 to Nov 2005

The project contents 50 culverts, 16 Minor Bridges, 5 Major Bridges. In

this project structures used like RCC Box for culverts with different

size, RCC Solid Slab, RCC I-Girder, RCC Voided Slab used for Minor

Bridges and PSC I Girder and PSC Box Girder used for Major Bridges .

Substructures used in this like Open Foundation, Pile Foundation and Well

Foundation. In this project I was also responsible for design of Steel

Staging.

. Feasibility Study and Preparation of DPR for Four - Six Laning of Rajmarg

Chouraha to Lakhandon Section of National Highway No. 26 from Km 296.00

to 405.70 in the state of Madhya Pradesh, ADB funded, NHAI.

This DPR includes 15 Minor Bridges, 3 Major Bridge, 6 Vehicular

underpasses, 10 pedestrian underpasses, 30 box culverts, 85 pipe culverts

and 22 slab culverts . In this project structures used like RCC Box for

culverts with different size, RCC Solid Slab, RCC I-Girder, RCC Voided

Slab used for Minor Bridges and PSC I Girder and PSC Box Girder used

for Major Bridges . Substructures used in this like Open Foundation, Pile

Foundation and Well Foundation. In this project I was also responsible

for design of Steel Staging

. Feasibility Study and Preparation of Detailed Project Report for the

Widening & Strengthening of the Narayanpur - Bhanupratapur -

Rajnandangaon Road Stretch in Chattisgarh (165 kms) (Projects on BOT /

Private Sector Participation) Chattissgarh PWD

This DPR includes 26 Minor Bridges,16 box culverts, 65 pipe culverts and

11 slab culverts . In this project structures used like RCC Box for

culverts with different size, RCC Solid Slab, RCC I-Girder, RCC Voided

Slab used for Minor Bridges. Substructures used in this like Open

Foundation, Pile Foundation and Well Foundation. In this project I was

also responsible for design of Steel Staging

. Detailed Design for Banganga Bridge No. 32 at Km 28/138 on Katra-Reasi

Section of Udhampur -Srinagar - Baramulla New B.G. Rail Link Project,

Jammu & Kashmir, Northern Railway

. Detailed Design for ROB Jamnagar, GSRDCL & Western Railway.

. Detailed Design of Kajaria Tiles Industrial Building, UP, Kajaria Limited

. Detailed Design of Vikas Strip Industrial Building Haryana, Vikas

Strip Limited

Responsibilities: 1. Prepared Final design calculation and Drawings.

2. Approve the project from Client.

3. Short out Clint query.

4. Prepared concept design.

5. Prepared Preliminary design for Project.

6. Attend Client meeting.

7. Discuss tender related problem with Tender

and Contract division.

8. Discuss construction related problem with

Contractor.

9. Attend internal meeting

Over all Responsibilities:

- Study Geotechnical report

- Calculation of hydraulic data

- Structural design

- Checking of structural design and drawings

- Review / Proof Checking of design and drawings

- Approval same from the client

- Condition Survey of existing structure

- Feasibility study

- Concept Design

- Attend client meeting

- Proof Checking

- Solve Site query and prepared design and drawings.

Used Software - Autocadd 2006, Staad pro -2004, MS-Office

( Dec 1999 to Jan 2004 Design/Structural Design Engineer, Nutech

Consultants &

Infrastructure

(Pvt) Ltd, New Delhi

I was responsible for design, checking of structural design and drawings

of bridges/aqueducts/buildings, review/proof check of designs and

drawings, design of skew (varying angle) and right bridges, ROB, flyover

and underpass, aqueduct, steel truss bridge, industrial building, office

building, staging, continuous bridge, horizontal curve bridge, horizontal

curve with continuous bridge (simply supported) using R.C.C. solid slab

with cantilever arms, R.C.C.T- beam & slab, P.S.C. girder, P.S.C. voided

slab, P.S.C. solid slab, R.C.C. voided slab, R.C.C. box girder, PSC box

girder, steel truss, R.C.C. box, PSC box etc. with/without footpath and

approval same from the client. Also responsible for design sub-structures

like RCC wall type abutment, pier with open Foundation, retaining wall,

pile foundation, well foundation with Pier and abutment etc. for a wide

range of clients like Himachal Pradesh PWD, Punjab PWD, Northern Railway,

JRDA, HUDA, UPJB, HPID, NHPC. Handled the following projects during this

period.

. Detailed Design for 3 span continuous R.C.C. Box girder with horizontal

curve under, PWD, Punjab, India

. Detailed Design of Lakkarpool flyover under, PWD Punjab, India

. Detailed Design of Aqueduct under Irrigation Department Himachal

Pradesh, India

. Detailed Design of 3 span continuous with segmental cantilever

construction bridge over river Parel under PWD, Himachal Pradesh, India

. Detailed Design of Lohankhand Bridge over river Lohankhand under PWD,

Punjab, India

. Detailed Design of Chugnachur bridge over river Chugnachur under PWD,

Punjab, India

. Detailed Design of Adrain ka Khala Bridge over river Adrain ka Khala

under PWD, Himachal Pradesh, India.

. Detailed Design of Tons Bridge over river Tons

. Detailed Design of Galoti Ghat bridge over river Galoti Ghat

. Detailed Design of Gauri Ganga bridge over river Gauri Ganga

. Detailed Design of Ghaghra Bridge over river Ghaghra

. Detailed Design of Kale Khan Bridge over river Kale Khan

. Detailed Design of Sarai Thota bridge over river Sarai Thota

Responsibilities: 1. Prepared Final design calculation and Drawings.

2. Approve the project from Client.

3. Short out Clint query.

4. Prepared concept design.

5. Prepared Preliminary design for Project.

6. Attend Client meeting.

7. Discuss tender related problem with Tender

and Contract division.

8. Discuss construction related problem with

Contractor.

9. Attend internal meeting

Over all Responsibilities:

- Study Geotechnical report

- Calculation of hydraulic data

- Structural design

- Checking of structural design and drawings

- Review / Proof Checking of design and drawings

- Condition Survey of existing structure

- Feasibility study

- Concept Design

- Attend client meeting

- Proof Checking

- Solve Site query and prepared design and drawings.

Used Software - Autocadd 2006, Staad pro -2004, MS-Office

Proficiency (0=Poor - 10 =Excellent)

Language Skills: Spoken Written

Bengali 9 9

Hindi: 9 9

English: 9 9

Computer Software: Type of software: Level of expertise on a scale

of 1-10.

Auto Cadd Structural Elements 7/10

MS Office Preparing design report 9/10

Staad Pro 2005 Structural Analysis 9/10

Sap 2000 Structural Analysis 8/10

Conbox Post Tensioned design 8/10

R C Pier Pier and Pile design 9/10

PCA Column Column design 9/10

Micro Station Structural Elements 7/10

Breakdown of Experience

Bridges and Structures : 11 years

Total years of experience : 11 years



Contact this candidate