Summary
I am a manufacturing manager that has had extensive training in Lean
Manufacturing, Kaizens, 5S, TPM, VSM, Six Sigma and Team Building. Along
with the training comes years of experience using these tools out on the
shop floor and within my staff to build a better overall operation. I have
excellent people skills and can speak to the shop floor or to the President
of the company. I have reduced cost in all of the positions that I have
held and can make the difficult decisions that need to be made.
Experience
M-Tek, Upper Sandusky, OH May
2010-Present
Injection Production Manager
Currently responsible for a 5 day, 24 hour operation with 22 injection
presses and 140 hourly associates with 3 supervisors and 6 group leaders.
. Completed a complete overhaul of the training practices within the
department
. Completed a Kaizen on a press to minimize movement and increase
throughput
Graham Packaging, Fremont, OH June 2009 to May 2010
Shift Supervisor
I am currently working as a supervisor on a 12 hour shift in a continuous
operation environment. I am in charge of all production personnel along
with maintenance, shipping and quality.
. Completed a 5S project in the waste oil storage area within the first
60 days of my hire.
. Recently completed Graham's DRIVE Continuous Improvement Training.
. I have been assigned to a shift that had little leadership for the
previous years. I have been tasked with changing this culture using my
team building skills.
Morgan AM&T, Fostoria, OH 2006 to 2009
Manufacturing Manager
I was in charge of the day to day operations of the manufacturing and
maintenance areas in this facility. I was asked to help bring about a
culture change and help drive continuous improvement throughout the
facility.
. 7 Kaizen events from June 2008-Dec. 2008 resulting in cost savings of
over $80,000.
. Combined operations and established work cells lowering cost using
Lean Manufacturing Principles.
. Decreased overtime by over 25%.
. Implemented OEE boards on all major pieces of equipment.
. Implemented KanBan boards.
. Reduced staffing from 3 people/shift down to 2 people/shift on a
major piece of equipment that resulted in reduced overtime and cost.
. Implemented a First Responder Team within the facility.
Cooper Standard Automotive, Bowling Green, OH 2005 to 2006
Extrusion/Forming Business Unit Manager
I was responsible for all functions within this area. Safety, quality,
efficiencies, full budget responsibilities, equipment procurement, policy
and continuous improvement were some of my duties. I was asked to go back
to this area when another manager resigned and was immediately tasked with
heading up automation projects for the extrusion department. These projects
were not budgeted nor were there any previous plans upon my return to this
area.
. Working with my engineering group and outside firms, installed an
automation project on the end of our continuous spiral line that allowed
us to reduce the crew size from 3 people per shift down to 1 person.
. Fabrication of 2 additional automation projects for additional lines
was underway upon my acceptance of a position with another firm.
. These additional projects were going to reduce staffing levels down
from 2 people per line down to 1.
Cooper Standard Automotive, Bowling Green, OH 2004 to 2005
GM/DCX Business Unit Manager
In charge of the day to day operations of the GM/DCX Business Unit with the
same responsibilities as listed in the previous assignment.
. Implemented 5S in the finishing area commonizing all of our work
cells.
. Implemented new trim fixtures combining multiple operations in to
one.
. Achieved the lowest indirect labor rates that this area had even
accomplished.
Cooper Standard Automotive, Bowling Green, OH 1996 to 2004
Extrusion/Forming Business Unit Manager
Same as listed in my first listing in this position.
. Implemented a new preform container that resulted in annualized cost
savings of over $250,000.
. Implemented a reel-to-reel system that reduced scrap, staffing levels
and resulted in annualized cost savings of over $500,000.
. Installed new reinforcing equipment that allow us to reduce our
changeover time from 1.3 hours down to 18 minutes taking us to Best in
Industry according to Ford.
. Introduced a implemented a non-contact measurement system which
eliminated step pins and pi tapes and improved our gage R&R.
. Implemented OEE boards on all extrusion lines.
. Implemented KanBan boards on all extrusion lines.
. Improved our printing from worst in class to best in class by
installing ink jet printers on all lines.
Cooper Standard Automotive, Bowling Green, OH 1983 to 1996
Extrusion Supervisor
I was in charge of a shift in the extrusion department. My responsibilities
included safety, quality, discipline, adherence to schedules and all other
duties that may have been assigned. I worked on special projects to reduce
cost and was the person responsible from the production area for the start
up of our first continuous lines.
. Assigned the responsibility for the start up of our first continuous
line. We had the line up and running at a target 3% scrap within 3
months.
. After the successful start up of the first line, I was again assigned
the responsibility for the start up of the continuous knit line.
. Implemented the first tool crib within the plant for all of the
extrusion tooling.
. Hands on experience working on cost reductions.
. Hands on experience on the shop floor, hired in as an hourly worked
and promoted to shift supervisor after 4 years.
Education
University of Findlay, Findlay, OH 2009
B.S., Business Management GPA 3.85, graduated Magna Cum Laude
Skills
. Budgeting- Capital and Operations- Budgeted for capital and
operations for over 15 years.
. Coaching and Motivation Staff- Excellent communications and people
skills.
. Cost Reductions- Able to look at things objectively and find new,
better, more efficient ways to produce quality at a better price.
. Lean Manufacturing Experience- Over 30 years manufacturing experience
from a production worker to a Manufacturing Manager.
Training
Rubber Technology, Cooper Standard Automotive, Bowling Green, OH, 1985
7 Step Corrective Actions, Oakland Community College, 1997
Time Study and Methods, Industrial Time Study Institute, Akron, OH, 1998
Extrusion Technology, University of Wisconsin/Milwaukee, Milwaukee, WI,
1998
Lean Manufacturing Operations Management, University of Kentucky, 2000
Mid Level Leadership Program, Morgan AM&T, 2007
DRIVE Continuous Improvement, Graham Packaging, 2009